Amendment_0001_Solicitation_SPMYM218Q0145_(Hull_Cut_Access_Enclosure).docx
DOCX document 35 KB Posted
- Attached to
- 5450 ENCLOSURE, HULL CUT ACCESS Federal contract opportunity
- Solicitation number
- SPMYM218Q0145
About this file
Amendment_0001_Solicitation_SPMYM218Q0145_(Hull_Cut_Access_Enclosure).docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002_Solicitation_SPMYM218Q0145_(Hull_Cut_Enclosures).docx | DOCX document | |
| Attachment_1.A._Site_Specific_Requirements.pdf | ||
| Revised_Attachment_1_Hull_Cut_Access_Enclosure_Specification_(Rev_A).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPMYM218Q0145
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 16-Nov-2017 02:00 PM to 20-Nov-2017 02:00 PM.
The following have been modified:
ATTACHMENTS
| ATTACHMENT 1 |
| REVISED SPECIFICATION – HULL ACCESS CUT ENCLOSURE |
| 13 PAGES |
EXHIBITS
| EXHIBIT A |
| TECHNICAL DATA – ENGINEERING DRAWINGS |
| 2 PAGES |
| EXHIBIT B |
| O&M MANUALS |
| 2 PAGES |
| EXHIBIT C |
| LIFT SKETCH – ENGINEERING DRAWINGS |
| 2 PAGES |
| EXHIBIT D |
| PCB CERTIFICATION |
| 2 PAGES |
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it.