SPMYM119Q0022_(Solicitation).pdf
PDF 606 KB Posted
- Attached to
- Storage System Federal contract opportunity
- Solicitation number
- SPMYM1-19-Q-0022
About this file
See solicitation for details
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPMYM119Q0022_(Solicitation-MOD).pdf | ||
| The_Salient_document.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
SPMYM119Q0022 27-Feb-2019
b. TELEPHONE NUMBER
757-396-8064
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 13 Mar 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
SPMYM19. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SHARRIA T. WELLS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N4215890375800
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
DLA MARITIME NORFOLK
CONTRACTING DIVISION (DLA-NMAB)
BLDG. 1500, 2ND FLOOR
PORTSMOUTH VA 23709-5000
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS AX
13b. RATING
DOC-C9
CODE15. DELIVER TO CODE N42158 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
NORFOLK NAVAL SHIPYARD
NO POINT OF CONTACT (RECEIVING DEPT)
RECEIVING OFFICER
BLDG 276
PORTSMOUTH VA 23709-5000
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
337127
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF37
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
SPMYM119Q0022
Section SF 1449 - CONTINUATION SHEET
Contact Information
If your company encounters problems with this purchase order/contract, including payment problems, please contact LT Sharria Wells at Sharria.Wells.res@DLA.mil or by telephone at (757)396-8064.
Pallet Requirement
NOTE: Contractors (drivers) delivering material to the Norfolk Naval Shipyard must come with two forms of
Identification, one being a driver license or picture ID card issued by a State. The other form required is a SSN card, birth certificate issued by a state, Native American document or US citizen card. Driver(s) will not be escorted unless they have to go into the CIA.
All items/boxes over 40 lbs under this solicitation and/or contract is required to be palletized. Delivery will not be accepted to any material that IS NOT palletized. The shipment will not be offloaded and will be returned.
Material sourced or otherwise procured from NUFLO, Inc. (Cage Code: 3BZG7) and/or Synergy Flow Systems
(Cage Code: 4GP29) are prohibited to be offered, sold, exchanged, or delivered to Norfolk Naval Shipyard.
Contract Number MUST be noticeable on the outside of the package and on the packing documents.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each N4215890375800
FFP
STORAGE SYSTEM
NEED TO PROCURE 1 MODEL: SI 1500 74X42-4-75; DRAWING 18-DN248B
The Salient Characteristics of the Proper Storage Systems Roll-Out Shelves
This is a complete storage system designed specifically to meet the floor loading limitations of the Code 138 lab while still providing secure storage for bar, pipe, and billet on hand and on order. The shelves each have a 1500 pound capacity and feature dividers to prevent round
· materials from rolling. Two shelves on one unit have solid bottoms for the storage of small billets, fixtures, and plate assemblies. This is critical as Code 138 has a wide variety of long and short stock, as well as many small, odd sized/shaped pieces of material and/or assemblies which require organization. The systems also feature locking doors which provides for secure storage, which is also crucial as some of the materials/assemblies held in Code 138 are very expensive and difficult to obtain. The roll out shelves feature safety mechanisms which prevent more than one shelf from being rolled-out at a time to prevent instability. The system also features an assist tool to ergonomically roll out the shelves while fully loaded.
The storage system shall consist of two units. Each unit shall have four roll-out drawers. The drawers shall each have a 1500 pound capacity. One unit shall have dividers on each shelf. One unit shall have two shelves with dividers and two shelves with solid bottoms. The solid bottom shelves shall be the lower shelves.
The system shall include a device to assist in rolling out the upper and lower shelves. Each unit shall be 84 inches wide, 75 inches high, and 46 inches deep.
Each shelf shall be 74 inches wide and 42 inches deep. The shelves shall be equally spaced. Each unit shall have locking doors of solid metal construction. The base of each unit shall be constructed of square steel tube 3"X3". Each unit shall feature anchoring points for mounting to concrete and shall include anchoring hardware.
Anchoring hardware shall consist of expansion anchors (Hilti KB3 or equivalent)
½" diameter and 4-1/2" long. The overall estimated weight of each unit fully loaded shall not exceed 10,750 lbs. Each unit shall have a safety mechanism to prevent more than one shelf from being rolled out at one time.
FOB: Destination
MILSTRIP: N4215890375800
MFR PART NR: 9B
PURCHASE REQUEST NUMBER: N4215890375800
PROJECT: YY9
PSC CD: 7195
NET AMT
0002 1 Each N4215890375801
FFP
STORAGE SYSTEM
DRAWING 18-DN249B; MODEL:SI 1500 74X 42 - 4-75 ADJ DIV SBD PAN
The Salient Characteristics of the Proper Storage Systems Roll-Out Shelves
This is a complete storage system designed specifically to meet the floor loading limitations of the Code 138 lab while still providing secure storage for bar, pipe, and billet on hand and on order. The shelves each have a 1500 pound capacity and feature dividers to prevent round
· materials from rolling. Two shelves on one unit have solid bottoms for the storage of small billets, fixtures, and plate assemblies. This is critical as Code 138 has a wide variety of long and short stock, as well as many small, odd sized/shaped pieces of material and/or assemblies which require organization. The systems also feature locking doors which provides for secure storage, which is also crucial as some of the materials/assemblies held in Code 138 are very expensive and difficult to obtain. The roll out shelves feature safety mechanisms which prevent more than dividers on each shelf. One unit shall have two shelves with dividers and two shelves with solid bottoms. The solid bottom shelves shall be the lower shelves.
The system shall include a device to assist in rolling out the upper and lower shelves. Each unit shall be 84 inches wide, 75 inches high, and 46 inches deep.
Each shelf shall be 74 inches wide and 42 inches deep. The shelves shall be equally spaced. Each unit shall have locking doors of solid metal construction. The base of each unit shall be constructed of square steel tube 3"X3". Each unit shall feature anchoring points for mounting to concrete and shall include anchoring hardware.
Anchoring hardware shall consist of expansion anchors (Hilti KB3 or equivalent)
½" diameter and 4-1/2" long. The overall estimated weight of each unit fully
MILSTRIP: N4215890375801
PURCHASE REQUEST NUMBER: N4215890375800
0003 1 Each N4215890375802
FFP
STORAGE SYSTEM
PROCURE REMOVABLE T-HANDLE FROM DRAWING 248B-249B
The Salient Characteristics of the Proper Storage Systems Roll-Out Shelves
This is a complete storage system designed specifically to meet the floor loading limitations of the Code 138 lab while still providing secure storage for bar, pipe, and billet on hand and on order. The shelves each have a 1500 pound capacity and feature dividers to prevent round
· materials from rolling. Two shelves on one unit have solid bottoms for the storage of small billets, fixtures, and plate assemblies. This is critical as Code 138 has a wide variety of long and short stock, as well as many small, odd sized/shaped pieces of material and/or assemblies which require organization. The systems also feature locking doors which provides for secure storage, which is also crucial as some of the materials/assemblies held in Code 138 are very expensive and difficult to obtain. The roll out shelves feature safety mechanisms which prevent more than dividers on each shelf. One unit shall have two shelves with dividers and two shelves with solid bottoms. The solid bottom shelves shall be the lower shelves.
The system shall include a device to assist in rolling out the upper and lower shelves. Each unit shall be 84 inches wide, 75 inches high, and 46 inches deep.
Each shelf shall be 74 inches wide and 42 inches deep. The shelves shall be equally spaced. Each unit shall have locking doors of solid metal construction. The base of each unit shall be constructed of square steel tube 3"X3". Each unit shall feature anchoring points for mounting to concrete and shall include anchoring hardware.
Anchoring hardware shall consist of expansion anchors (Hilti KB3 or equivalent)
½" diameter and 4-1/2" long. The overall estimated weight of each unit fully
MILSTRIP: N4215890375802
PURCHASE REQUEST NUMBER: N4215890375800
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 0 dys. ADC 1 NORFOLK NAVAL SHIPYARD
NO POINT OF CONTACT (RECEIVING
DEPT)
RECEIVING OFFICER
BLDG 276
PORTSMOUTH VA 23709-5000
N42158
0002 0 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0003 0 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018
52.204-13 System for Award Management Maintenance OCT 2018
52.204-16 Commercial and Government Entity Code Reporting JUL 2016
52.204-17 Ownership or Control of Offeror JUL 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.209-2 Prohibition on Contracting with Inverted Domestic
Corporations--Representation
NOV 2015
52.211-6 Brand Name or Equal AUG 1999
52.211-14 Notice Of Priority Rating For National Defense, Emergency
Preparedness, and Energy Program Use
APR 2008
52.212-1 Instructions to Offerors--Commercial Items OCT 2018
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.246-1 Contractor Inspection Requirements APR 1984
52.247-34 F.O.B. Destination NOV 1991
252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013
252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017
252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017
252.225-7036 Buy American--Free Trade Agreements--Balance of
Payments Program--Basic
DEC 2017
252.225-7048 Export-Controlled Items JUN 2013
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.244-7000 Subcontracts for Commercial Items JUN 2013
252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations
Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that--
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
(End of provision)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
This is a rated order certified for national defense, emergency preparedness, and energy program use, and the
Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR
700).
(End of clause)
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
The Contractor is responsible for the delivery of each item quantity within allowable variations, if any. If the
Contractor delivers and the Government receives quantities of any item in excess of the quantity called for (after considering any allowable variation in quantity), such excess quantities will be treated as being delivered for the convenience of the Contractor. The Government may retain such excess quantities up to $250 in value without compensating the Contractor therefor, and the Contractor waives all right, title, or interests therein. Quantities in excess of $250 will, at the option of the Government, either be returned at the Contractor's expense or retained and paid for by the Government at the contract unit price.
GOVERNMENT SURPLUS MATERIAL
(a) Definition.
“Surplus material,” as used in this clause, means new, unused material that was purchased and accepted by the
U.S. Government and subsequently sold by the DLA Disposition Services, by Contractors authorized by DLA
Disposition Services, or through another Federal Government surplus program. The terms “surplus” and
“Government surplus” are used interchangeably in this clause.
(b) The Offeror agrees to complete this clause and provide supporting documentation as necessary to demonstrate that the surplus material being offered was previously owned by the Government and meets solicitation requirements. The Offeror must provide this information and any supporting documentation on or before the date that quotes/offers are due; or within the timeframe specified by the Contracting Officer, if additional documentation is requested after submission of the offer. Failure to provide the requested information and supporting documentation within the timeframe requested may result in rejection of the offer. Unless the solicitation states otherwise, Offerors of surplus material are authorized to open packages, inspect material, and reseal packages. Each time this is done, the Offeror’s authorized representative or inspector must sign the packages where they were resealed and annotate the date of inspection.
(c) With respect to the surplus material being offered, the Offeror represents that:
(1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety.
Yes __ No __
The material conforms to the technical requirements cited in the solicitation (e.g., commercial and
Government entity (CAGE) code and part number, specification, etc.). Yes __ No __
The material conforms to the revision letter/number, if any is cited. Yes __ No __Unknown __
If no, the revision offered does not affect form, fit, function, or interface. Yes __ No __ Unknown __
The material was manufactured by:
(Name): ____________________________________________________
(Address): ___________________________________________________
(2) The Offeror currently possesses the material. Yes __ No __
If no, the Offeror must attach or forward to the Contracting Officer an explanation as to how the offered quantities will be secured.
If yes, the Offeror purchased the material from a Government selling agency or other source. Yes __
No __
If yes, provide the information below:
Government Selling Agency: ______________________________________
Contract Number: _________ _______________________________________
Contract Date: (Month, Year):_________________________________________
Other Source: ______________________________________________
Address:_____________________________________________
Date Acquired: (Month/Year) _____________________________
(3) The material has been altered or modified. Yes __ No __
a) If yes, the Offeror must attach or forward to the Contracting Officer a complete description of the alterations or modifications.
(4) The material has been reconditioned. Yes __ No __
If yes, (i) the price offered includes the cost of reconditioning /refurbishment. Yes __ No __;
and
(ii) The Offeror must attach or forward to the Contracting Officer a complete description of any work done or to be done, including the components to be replaced and the applicable rebuild standard.
The material contains cure-dated components. Yes __ No __
If yes, the price includes replacement of cure-dated components. Yes __ No __
(5) The material has data plates attached. Yes __ No __
a) If yes, the Offeror must state below all information contained thereon, or forward a copy or facsimile of the data plate to the Contracting Officer.
(6) The offered material is in its original package. Yes __ No __
(If yes, the Offeror has stated below all original markings and data cited on the package; or has attached or forwarded to the Contracting Officer a copy or facsimile of original package markings.)
Contract Number ______________________________________
National Stock Number (NSN)_________________________________________
Commercial and Government Entity (CAGE) Code___________________________
Part number_______________________________________
Other markings/data_________________________________
(7) The Offeror has supplied this same material (National Stock Number) to the Government before. Yes
__ No __
If yes, (i) the material being offered is from the same original Government contract number as that provided previously. Yes __ No __; and
(ii) State below the Government Agency and contract number under which the material was previously provided:
Agency ______________________________________________
Contract Number________________________________________
(8) The material is manufactured in accordance with a specification or drawing.
Yes __ No __
If yes, (i) the specification/drawing is in the possession of the Offeror. Yes __ No __; and
(ii) The Offeror has stated the applicable information below, or forwarded a copy or facsimile to the
Contracting Officer. Yes __ No __
Specification/Drawing Number ___________________________________
Revision (if any) _______________________________________________
Date_________________________________________________________
(9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects. Yes __ No __
If yes, (i) Material has been re-preserved. Yes __ No __;
(ii) Material has been repackaged. Yes __ No __;
(iii) Percentage of material that has been inspected is ______% and/or number of items inspected is
_______; and
(iv) A written report was prepared. Yes __ No __
If yes, the Offeror has attached it or forwarded it to the Contracting Officer. Yes__ No__
(d) The Offeror agrees that in the event of award and notwithstanding the provisions of the solicitation, inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection.
(e) The Offeror has attached or forwarded to the Contracting Officer one of the following, to demonstrate that the material being offered was previously owned by the Government (Offeror check which one applies):
___ For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA Disposition Services Form 1427, Notice of Award, Statement and Release Document.
___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material.
___ For DLA Disposition Services Recycling Control Point (RCP) term sales, the statement of account or billing document.
___ For property sold under the exchange or sale regulation, conducted by sealed bid, auction or retail methods, a solicitation/invitation for bid and corresponding DLA Disposition Services form 1427.
___ When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and
Government entity (CAGE) code and part number, and original contract number. (This information has already been provided in paragraph (c)(6) of this clause. Yes __ No __.)
___ When none of the above are available, other information to demonstrate that the offered material was previously owned by the Government. Describe and/or attach.
(f) This clause only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer’s overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the provision at 52.217-9002.
(g) Offers of critical safety items must comply with the additional requirements in 52.211-9005.
(h) If requested by the Contracting Officer, the Offeror shall furnish sample units, in the number specified, to the Contracting Officer or to another location specified by the Contracting Officer, within 10 days after the
Contracting Officer's request. The samples will be furnished at no cost to the Government. All such samples not destroyed in evaluation will be returned at the Offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used. End items furnished under any contract award to the Offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the Offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted insofar as specific performance tests have been made by the Government and the results thereof furnished to the Offeror.
(i) In the event of award, the Contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order, whether or not the Contractor has possession of applicable drawings or specifications, and despite the fact that the Government is unable to conduct in-process inspection. The Contractor’s responsibility to perform is not diminished by compliance with the requirement to demonstrate that the offered material was previously owned by the Government. The material to be furnished must meet the requirements of the current contract or order, whether or not the material met Government requirements in existence at the time the material was initially manufactured or sold to the Government. The Government has the right to cancel any resulting purchase order or terminate any resulting contract for default if unacceptable material is tendered.
(j) If higher level quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract.
CONTRACTOR RETENTION OF TRACEABILITY DOCUMENTATION
(a) This clause applies whenever the Contractor is not the manufacturer of the item(s) to be furnished.
(b)(1) The Contractor shall retain evidence to document that items furnished under this contract conform to contract requirements. Evidence will generally include information tracing the items back to the manufacturing source or its authorized distributor. At a minimum, evidence shall be sufficient to establish the identity of the item, its manufacturing source, and conformance to the item description.
(2) Examples of traceability documentation include, but are not limited to, the following:
(i) Purchase order(s)/invoice(s) between manufacturer(s)/distributor(s), identifying part number
(and/or technical data package (TDP) with revision level) and quantities;
(ii) Original equipment manufacturer (OEM) or approved/qualified source’s packing slips, identifying part number (and/or TDP with revision level) and quantities;
(iii) OEM or approved/qualified source’s certification, identifying part number (and/or TDP with revision level) and quantities; and/or
(iv) OEM or approved/qualified source’s identifiable standard packaging, with part number (and/or
TDP with revision level) cited on the package.
(3) The Contractor shall be responsible for the assurance of type, kind, count, and condition. Preservation, packing, packaging, and marking shall be in accordance with contractual requirements.
(4) The Contractor shall provide documentation of traceability for review—
(i) Upon request by the Contracting Officer at any time prior to or after award;
(ii) At time of Government source inspection, if applicable; and/or
(iii) During random or directed post-award audits.
(5) The Contractor shall retain documentation in accordance with this clause for 5 years after final payment under this contract.
c) The Offeror/Contractor shall provide documentation of traceability for review—
(1) Upon request by the Contracting Officer at any time prior to or after award;
(2) At time of Government source inspection, if applicable; and/or
(3) During random or directed post-award audits.
(d) Traceability documentation shall, at a minimum, include the following:
(1) If the Offeror/Contractor is an authorized dealer/distributor for an approved source for the specific item being procured by the Government, the following requirements apply:
(i) The Offeror/Contractor shall maintain at least one of the following:
(A) A copy of its current dealer/distributorship agreement;
(B) A letter of authorization from the approved source; or
(C) A link to an official website maintained by the approved source, which shall clearly identify the Offeror as an authorized dealer/distributor.
(ii) By submission of documentation described in subparagraph (d)(1)(i) of this clause, the
Offeror/Contractor represents that:
(A) The dealer/distributor relationship with the approved source applies to the specific item being procured by the Government; and
(B) If the Contractor’s dealer/distributor status with the approved source changes after award, the
Contractor shall promptly notify the Contracting Officer. Failure to provide such notification is grounds for cancellation of award or termination for default/cause, as applicable.
(2) If the Offeror/Contractor is not an authorized dealer/distributor for an approved source for the specific item being procured by the Government, the following requirements apply:
(i) If the Offeror/Contractor identified the offered item as “not in stock/not currently owned by the
Offeror" or "not yet manufactured," the Offeror/Contractor shall—
(A) Maintain a verifiable quotation from the approved source, or from an authorized dealer/distributor for the approved source.
(B) Include the following information in its quotation:
(1) The item part number or designation, which shall be provided in sufficient detail to document that the item being quoted is the same as the item being procured by the Government;
(2) The quantity, which shall be sufficient to satisfy the solicitation requirement;
(3) The unit price quoted by the approved source, or by the authorized dealer/distributor for the approved source;
(4) The date of the quotation; and
(5) The name and phone number of the representative of the approved source, or of the authorized dealer/distributor for the approved source.
(C) The quotation shall be on the letterhead of the approved source, or of an authorized dealer/distributor for the approved source; or an electronic quotation, which shall be clearly identifiable as coming to the Offeror/Contractor from the approved source, or from an authorized dealer/distributor for the approved source.
(D) If the offered items are obtained from an authorized dealer/distributor for the approved source, the Offeror/Contractor shall maintain the information described in subparagraph (d)(1)(i) of this clause to document the authorized dealer/distributor arrangement; and the terms in subparagraph (d)(1)(ii) of this clause shall apply.
(ii) If the Offeror/Contractor identified the offered item as “shipped” or “in stock/currently owned by the Offeror,” the following requirements apply:
(A) The Offeror/Contractor shall maintain one of the following documents:
(1) The invoice received by the Offeror/Contractor from the approved source, or from an authorized dealer/distributor for the approved source; or
(2) The packing slip that accompanied the shipment to the Offeror/ Contractor from the approved source, or from an authorized dealer/distributor for the approved source. The packing slip shall include a packing slip number. (If no packing slip number was provided, the Offeror/Contractor shall obtain and maintain written documentation from the approved source, or from the authorized dealer/distributor for the approved source, verifying the packing slip number. Such documentation shall include the name and address of the approved source, or of the authorized dealer/distributor for the approved source; the date of the correspondence; and the name and phone number of the representative of the approved source, or of the authorized dealer/distributor for the approved source, who provided the information.)
(B) The documentation furnished in accordance with subparagraph (c)(2)(ii)(A) of this clause shall include the following:
(1) Date;
(2) the name and address of the approved source, or of the authorized dealer/distributor for the approved source;
(3) the name and phone number of the representative of the approved source, or of the authorized dealer/distributor for the approved source;
(4) the item part number or designation, which shall be provided in sufficient detail to document that the item provided to the Contractor is the same as the item being procured by the Government;
(5) the quantity, which shall be sufficient to satisfy the solicitation requirement;
(6) the unit price charged by the approved source, or by the authorized dealer/distributor for the approved source; and
(7) the Offeror’s/Contractor’s name and address.
(C) If the offered items are obtained directly from an authorized dealer or distributor, the
Offeror/Contractor shall maintain the information described in subparagraph (d)(1)(i) of this clause to document the authorized dealer/distributor arrangement; and the terms in subparagraph (d)(1)(ii) of this clause shall apply.
(3) If the offered items are not obtained directly from an approved source, or from an authorized dealer/distributor of an approved source, the Offeror/Contractor shall maintain documentation, as described in subparagraph (d)(2) of this clause, sufficient to establish the complete line of ownership or distribution from the approved source, or from an authorized dealer/distributor for the approved source, to the Offeror/Contractor.
(e) The Contracting Officer determines the acceptability and sufficiency of documentation or other evidence, at his or her sole discretion. If the Contracting Officer finds the evidence to be unacceptable, or if the Contractor fails to retain or provide the requested evidence, the award may be cancelled or contract may be terminated for cause/default, as applicable.
(f) At the Contracting Officer’s discretion, documentation of traceability provided by the Contractor, in accordance with provisions in the solicitation and/or clauses included in this contract, may be used to determine the acceptability of documentation retained in accordance with this clause.
(g) Notwithstanding any documentation provided by the Offeror prior to purchase order issuance/contract award, the Government reserves the right to require additional documentation attesting to the authenticity of the material at any time before or after contract delivery.
(h) If the solicitation states inspection and acceptance shall take place at destination, the Government reserves the right to change the place of inspection and acceptance to origin and to invoke 52.246-9004, Product Verification
Testing, at time of award, with no increase in the awarded unit price.
(i) The Contractor shall be responsible for the assurance of type, kind, count, and condition. Preservation, packing, packaging, and marking shall be in accordance with contractual requirements.
(j) The Contractor shall retain documentation in accordance with this clause for 5 years after final payment under this contract.
(End of Clause)
PROHIBITED PACKING MATERIALS (DLA MARITIME-NORFOLK AND PUGET SOUND)
The following packing materials are prohibited: asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material), and loose fill polystyrene.
In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material.
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1. Technical capability of the items offered meet the Government’s requirements (Vendors shall provide descriptive literature.)
2. PRICE
3. PAST PERFORMANCE – PPIRS-SR
The relative importance of the evaluation factors are in descending order.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
52.212-4 CONTRACT TERMS AND CONDITIONS-- COMMERCIAL ITEMS (OCT 2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights (1) within a reasonable time after the defect was discovered or should have been discovered; and
(2) before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes'', as amended (41 U.S.C. 601-613).
Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR
52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the
Contracting Officer in writing as soon as it is reasonably possible after the commencement or any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on
Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award
Management, or 52.232-34, Payment by Electronic
Funds Transfer--Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of
Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any
United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the
Contractor is reasonably notified of such claims and proceedings.
(i) Payment.--
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C.
3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate
EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the
Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall--
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the--
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C.
7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if--
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer
(see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on--
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the
Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b.
destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The
Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the
Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all…