SPI_EH0C0187EH.pdf
PDF 1 MB Posted
- Attached to
- Pump, Hydraulic Federal contract opportunity
- Solicitation number
- SPRDL1-20-R-0131
About this file
This Special Packaging Instruction provides detailed requirements for packaging Hydraulic Pump part number 12577842 for shipment. Specific materials and quantities are listed for sealing, preserving, cushioning, blocking, wrapping, bagging, and containerizing the pump. Dimensions and assembly instructions are provided for fabricating packaging components. Quality assurance and marking requirements are also outlined.
Solicitation SPRDL1-20-R-0131 requires offers by 31 July 2020 for 42 each Hydraulic Pumps, part number 12577842, with an option for 100 additional units. The pumps will be shipped FOB Destination to the Defense Logistics Agency Land and Maritime. The Technical Data Package is controlled by Bosch-Rexroth Industrial Hydraulics Division, and approved sources must meet its specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL1-20-R-0131.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PACKAGING INSTRUCTION
Form Approved OMB No. 0704-0188
-BM
JS
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
4320-01-661-9782 April 3, 2017
7. QUP 8. ICQ 9. UNIT PACK WT (LB.) 10. UNIT PACK CU (CU. FT.) 11. UNIT PACK SIZE (INCHES)
1 EACH NONE 157.1
7.471 22.5 X 22.5 X 25.5
12. MILITARY PRESERVATION 18.
STEPS
19.
REQD
20.
DESCRIPTION
MIL-STD-2073-1, METHOD 42
1-B CAPS/PLUGS NAS 847
MIL-STD-2073-1 2-C PRESERVATIVE: MIL-PRF-21260, GRADE 10
14. DRYING 3-D 1 WRAP: MIL-PRF-121, TY II, CLASS 2, SIZE 56 X 32
MIL-STD-2073-1
15. PACKING
4-E CUSHIONING AND BLOCKING: SEE NOTES
a. LEVEL A 5-F 1 CONTAINER: ASTM D5118, ST RSC, TY CF, CL DOM, MIL-STD-2073-1 & NOTE I VAR DW, GR 350, SIZE: 18-1/2 X 18-1/2 X 17-1/2
b. LEVEL B 6 1 BAG: MIL-DTL-117,TY I, CL E, ST 1, SIZE 44 X 46
NOT APPLICABLE 7-G 1 WRAP: A-A-3174, 4 MIL, SIZE 80 X 48 QTY 1
16. MARKING 8-H 1 CONTAINER: ASTM D6251, TY III, CL 2, ST A,
MIL-STD-129 AND NOTE J SIZE: 20 X 20 X 19-1/2 (MODIFIED)
17. NOTES/DRAWING
A. QUALITY ASSURANCE PROVISIONS:
1. INSPECT PRESERVATION AND UNIT PACK IN ACCORDANCE WITH MIL-STD-2073-1.
2. INSPECT THE PACKING IN ACCORDANCE WITH MIL-STD-1186 AND THE APPLICABLE CONTAINER
SPECIFICATION.
B. SEAL ALL OPENINGS TO THE INTERIOR OF THE HYDRAULIC PUMP WITH CAPS/PLUG OF THE
APPROPRIATE SIZE IAW THE ITEM DRAWING.
C. APPLY PRESERVATIVE TO ALL BARE METAL SURFACES.
D. APPLY A SINGLE WRAP TO HYDRAULIC PUMP AND SECURE WITH TAPE.
E. FABRICATE ITEMS “A” THROUGH “J” IN CHART AND AS INSTRUCTED IN THE COMMENTS SECTION OF
THE CHART ON PAGE 2.
FABRICATE PAD ASSEMBLY “3” USING MATERIALS FROM THE CHART ON PAGE 2 AND AS SHOWN IN
SKETCH ON PAGE 6 USING WATER PROOF GLUE.
FABRICATE PAD ASSEMBLY “4” USING MATERIALS FROM THE CHART ON PAGE 2 AND AS SHOWN IN
SKETCH ON PAGE 8 USING WATERPROOF GLUE.
F. CONTAINER CLOSURE SHALL BE IN ACCORDANCE WITH CLOSURE 2B6, OF ASTM D1974
G. APPLY WRAP OVER BAGGED ITEM TO PREVENT PUNCTURE TO THE BARRIER MATERIAL.
SECURE WITH TAPE.
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
4320-01-661-9782 April 3, 2017
17. NOTES/DRAWING
H. CONTAINER IS CONSTRUCTED OF ALL 1/2 INCH THICK PLYWOOD AND 1 INCH THICK NOMINAL LUMBER
AND IS MODIFIED TO INCLUDE BEVELED SKIDS. SIZE AND APPLICATION OF SKIDS ARE IN ACCORDANCE WITH ASTM D6251. TOP OF CONTAINER SHALL BE SECURED TO SIDES AND ENDS WITH WOOD SCREWS.
I. THE UNIT CONTAINER IS THE SHIPPING CONTAINER.
J. IN ADDITION TO MIL-STD-129 MARKINGS, THE UNIT CONTAINER SHALL BE MARKED ON THE TOP AND ONE
SIDE WITH MINIMUM 1/2 INCH HIGH BLACK LETTERS "REUSABLE CONTAINER AND CUSHIONING, DO NOT DESTROY". IN ADDITION, THE TOP, ENDS AND SIDES SHALL BE MARKED "REMOVE LAG BOLTS/SCREWS TO
OPEN CONTAINER" USING MINIMUM 1 INCH HIGH BLACK LETTERS.
BLOCK
DESCRIPTION
QTY
COMMENTS
A A-A-59136, CLASS 1 OR 4, GR A, TY I,
SIZE: 18-1/4 X 5-3/8 X 1
B A-A-59136, CLASS 1 OR 4, GR A, TY I,
SIZE: 18-1/4 X 9-3/8 X 1
C A-A-59136, CLASS 1 OR 4, GR A, TY I,
SIZE: 18-1/4 X 18-1/4 X 2
D A-A-59136, CLASS 1 OR 4, GR A, TY I,
SIZE: 18-1/4 X 18-1/4 X 1
E A-A-59136, CLASS 1 OR 4, GR A, TY I,
SIZE: 18-1/4 X 18-1/4 X 7
FABRICATE AS SHOWN ON PAGE 4
USING TEMPLATE ON PAGE 5.
F A-A-59136, CLASS 1 OR 4, GR A, TY I,
SIZE: 18-1/4 X 6-3/4 X 2
FABRICATE AS SHOWN ON PAGE 7
G A-A-59136, CLASS 1 OR 4, GR A, TY I,
SIZE: 18-1/4 X 6 X 2
H A-A-59136, CLASS 1 OR 4, GR A, TY I,
SIZE: 3-1/2 X 3-3/8 X 2-1/2
I NOTE: “I” IS NOT USED.
J A-A-59136, CLASS 1 OR 4, GR A, TY I,
SIZE: 18-1/4 X 9-3/4 X 2
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
4320-01-661-9782 April 3, 2017
17. NOTES/DRAWING
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 7 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 8 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 9 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 10 of 11 Pages
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
12577842 (19207) PUMP, HYDRAULIC 19207 AK16619782
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 11 of 11 Pages
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
| SPECIAL PACKAGING INSTRUCTION |
File details come from the government source that posted it. Updated .