BID SCHEDULE
LED HIGH BAY LIGHTS
BID ITEM LIST
| ITEM |
| DESCRIPTION |
| QUANTITY |
| U/M |
| U/P |
| AMOUNT |
| 0001 |
| LED High Bay Light |
| 84 |
| EA |
| $ |
| $ |
| 0002 |
| NEMA Locking Plug |
| 84 |
| EA |
| $ |
| $ |
| Total |
| $ |
TECHNICAL SPECIFICATIONS
LED HIGH BAY LIGHTS
1.0 Summary of Scope
To furnish LED light fixtures to replace inadequate light fixtures in the Power house. These new light fixtures will benefit the project in the fact that power consumption will be greatly reduced by using new LED technology, maintenance cost will be reduced by the lack of maintenance required for these light fixtures, and fixture life operational hours for this type of lighting is greatly increased due to the lack of moving parts and older technology. These fixtures shall be supplied in accordance with the following specifications for the U.S. Army Corps of Engineers, Walla Walla District at Ice Harbor Lock and Dam, Burbank, Washington.
The vendor shall supply new LED High Bay light fixtures, NEMA L8-20P cord ends, and must be delivered in new condition while meeting the requirements of the Buy American Act.
2.0 Specifications
2.1 LED High Bay light
· Fixture must be UL listed suitable for wet location
· The housing must be made of copper free aluminum alloy
· The housing finish must be epoxy powder coated Gray for corrosion resistance
· The optical lens must use tempered glass.
· The operating voltage must be 480VAC
· Light must have a power factor greater than 90%
· Light must have dimming control included and integral to the fixture
· Normal operating temperature must be between -40C to 65C ambient.
· Open circuit surge protection must be 6kV/3kA per IEEE C62.41 line-ground and line-line
· Normal operating illumination hours must be equal to or greater than 120,000
· The LED light must have at least 61,000 lumens at the fixture.
· Light must draw 430 watts or less at 480VAC.
· Light color must be 5,000K / cool white
· Light must be covered by a 10 year full operational warranty which includes the driver and LED assembly.
· Light must have a mounting hook included with the light fixture.
· Light must have a 3 Meter power cable included with the light fixture.
· Light must not exceed 10.3” in height due to mounting restrictions.
· Light must not exceed 24.5” in diameter due to mounting restrictions.
· Dial light Vigilant LED high Bay H7U7NCDNDHNWNGN or approved equal
2.2 NEMA locking plug
· Plug must be NEMA configuration L8-20P
· 2 pole 3 wire
· Non-Shrouded
· Industrial Grade
· Nylon construction material
· Cord size range 0.36” to 0.93”
3.0 SCHEDULE
All components shall be delivered no later than One hundred twenty (120) days after the receipt of contract award. Contractor shall make prior arrangements with the Government personnel at site to receive and unload the equipment.
4.0 Submittals and Requirements
4.1 Vendor Product Sheet and Drawings
The vendor shall provide cut sheets with the dimensions, drawings, etc., with the quote for the Government to review for technical acceptability. All quoted information shall be sent to the Contracting Officer. All quotes shall be of sufficient in detail to show conformance to the specifications. Failure to provide acceptable proof of conformance or failure to meet the requirement of the specifications may result in disqualification
5.0 DELIVERY
All items shall be delivered F.O.B. Destination to Ice Harbor Project. The contractor is responsible for packing and shipping components in a manner that will ensure undamaged and complete arrival to Ice Harbor Dam. Normal working hours at Ice Harbor Dam are 6:30 a.m. to 5:00 p.m., Monday through Thursday, excluding holidays. The delivery shall arrive between 7:00 a.m. and 3:00 p.m. during normal working days. Delivery made outside of this time slot will not be accepted. This is to allow for unloading and inspection. The delivery shall be made to the south side of the dam. The delivery address is as follows:
Ice Harbor Dam 2763 Monument Drive Burbank, Washington 99323
Contractor shall make prior arrangements with the Government personnel at site to deliver and unload the equipment.