Specifications (Items) .pdf

PDF 254 KB Posted

Attached to
Ultrasound Transducers Federal contract opportunity
Solicitation number
NB6720102102121
Issued by
Department of Commerce National Institute of Standards and Technology

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: Ultrasound Transducers

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division Radio Frequency Electronics Group (672.01)

General Statement of Need:

The National Institute of Standards and Technology (NIST), CTL/RFT, in Boulder, CO has a project funded by the Innovations in Measurement Science Program to build an electric-acoustic spectrometer to measure intermolecular interactions. There is an urgent need for new strategies to develop selective separations for small batches of high-value pharmaceuticals, specialty chemicals, and catalysts, because the cost to develop a large-scale separation is too high. At the cutting edge of small-batch separations research, chemists control intermolecular interactions to improve the separation efficiency, yield, and purity of the target molecule.

The spectrometer works by applying both electric and acoustic waves to test a solution in a microfluidic channel (requires new acoustic-microwave capabilities). The key idea is that an electric signal probes the solution while an acoustic signal perturbs it, allowing us to measure a capacitance that oscillates at the acoustic frequency. The acoustic wave applies a local pressure that increases and decreases over a wavelength, changing the distribution of the ion pairs and their free energies and kinetics of formation. This change in kinetics provides selectivity since different ion-pair species require different amounts of time to form. The acoustic wave also changes the capacitance, because each ion-pair species has a different dipole moment and electrical relaxation time. We measure this time-dependent capacitance and convert it to linear and nonlinear dielectric constants (i.e., susceptibilities) to produce an electric-acoustic spectrum.

To this end, we require ultrasound transducers to provide ultrasound signals in a range of frequencies and pressures. The information from these measurements will be utilized to develop constitutive equations and models of the fluid dynamic response and the intermolecular interactions in solution.

Items and Ancillary Services:

Item 1: 10 MHz Ultrasound Transducer Quantity: 2 EACH Specifications: 1.1 Center frequency: 10 MHz

1.2 Width of transducer element: 0.231 mm

1.3 Height of transducer element: 5 mm

1.4 Kerf: 0.03 mm

1.5 Number of elements in x-direction: 32

1.6 Number of elements in y-direction: 2

1.7 Geometric focus of the element: 60 mm

1.8 Offset to plane from transducer to optimized plane : 17.2 mm

1.9 Surface pressure of at least 1.2 MPa

1.10 Needs to be able to run in CW mode for at least 10 ms

1.11 Elements need to be independently controlled for amplitude and phase

1.12 Electrical interface must be compatible with a Verasonics

Vantage system

Item 2: 1 MHz Ultrasound Transducer Quantity: 2 EACH Specifications: 2.1 Center frequency: 1 MHz

2.2 Width of transducer element: 0.77 mm

2.3 Height of transducer element: 5 mm

2.4 Kerf: 0.3 mm (this one doesn’t affect things much, so it can be changed)

2.5 Number of elements in x-direction: 18

2.6 Number of elements in y-direction: 2

2.7 Geometric focus of the element: 60 mm

2.8 Offset to plane from transducer to optimized plane : 80 mm, controlled by coupling material

2.9 Surface pressure of at least 1.5 Mpa

2.10 Needs to be able to run in CW mode for at least 10 ms

2.11 Elements need to be independently controlled for amplitude and phase

2.12 Electrical interface must be compatible with a Verasonics

Vantage system

Service Requirements / Item Specifications:

Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.] Shipping & Shipping Address:

Delivery ☐ N/A

☐ NIST-Boulder ATTN: Angela Stelson Mail Stop 672.01 325 Broadway Boulder, CO 80305

☐ [Alternate Shipping Address] Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to Building Required [Explain Need for Requirement]

☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☒ Delivery of Goods, Installation, and Training shall be competed no later than: 6 MONTHS AFTER RECEIPT OF ORDER (ARO) ☐ Delivery No Earlier Than: Click or tap to enter a date.

☐ Other: [List other shipping, delivery or special requirements.] [List Other Shipping, Delivery or Special Requirements.] Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ Email address for Software Delivery:

[Enter Address] Installation ☒ N/A

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:

[Enter Details]

NOTE:

When installation is required, TPOC shall be the coordination point.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers] ☐ Power Available Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.] ☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).] ☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.] Warranty ☐ N/A

Base Manufacturer Warranty is acceptable

[If you require an Extended Manufacturer Warranty, describe the warranty requirements per item.]

What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns ☐ Other [Enter Other Requirements] ☒ Warranty Length: 1-YEAR Training ☐ N/A

[Training Requirements (Who, When, What, Where)] ☐ On-Site

Is Travel Required: [Choose Answer]

☒ Off-Site Location: Virtual Training Acceptable ☒ Number of Trainees: 3 Scope of Training ☐ Operations ☒ Maintenance ☒ Troubleshooting ☒ Safety ☐ Other [Enter Other Scope Requirements] ☒ Training materials to be provided:

Manual with best practices for use and safety ☐ Other

[Enter Other Training Requirements] NOTE: When training is required, TPOC shall be coordinator.

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

[Inspection Requirements Per Item] ☒ Government Acceptance Expected to Not to Exceed 7 Business Days ☐ Government Acceptance Expected to Exceed 7 Business Days [Duration] ☒ Inspection and Acceptance Plan:

We will test the ultrasounds transducers on NIST’s Verasonics vantage system measuring a control material such as water or polydimethylsiloxanr. In lieu of this, the company may perform a virtual demonstration to NIST staff on an equivalent machine.

☐ Other:

[Enter Other Requirements] Maintenance ☒ N/A

[Describe Maintenance Requirements Per Item] Service Plan Length: [i.e. 3 - Years]

What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel

☐ Cost and Liability for Returns ☐ Software Updates ☐ Manuals l

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum) Government Furnished Material / Equipment ☐ N/A

[List Any Government Furnished Material / Equipment Per Item] ☒ Samples for Testing

☐ Government Equipment which will leave Government Site (TPOC must coordinate with Division Property Custodian)

Description: [Enter Description] Serial Number: [Enter Serial Number]

NIST Property Number: [Enter NIST Property Number] ☒ Other:

Government will provide the Verasonics Vantage controller equipment to validate the transducer, and a sample to demonstrate operation.

Travel ☒ N/A

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement] ☐ Other:

[Enter Other Requirements] NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .