Specifications.pdf
PDF 235 KB Posted
- Attached to
- 3. 5 mm Microwave Airline Calibration Kit Federal contract opportunity
- Solicitation number
- NB6720102302124
About this file
This document outlines requirements for a 3.5 mm Microwave Airline Calibration Kit solicitation. The National Institute of Standards and Technology requires one 3.5 mm Microwave Airline Calibration Kit containing specified female to male airline standards ranging in length from 3.94 to 15 cm, with dimensional measurements and a torque wrench. The kit must meet IEEE specifications for 3.5 mm connectors and include gold-coated surfaces. Delivery is required to NIST in Boulder, Colorado by the specified date. The related pre-solicitation, numbered NB6720102302124, is being conducted by the Department of Commerce National Institute of Standards and Technology to procure this 3.5 mm Microwave Airline Calibration Kit.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: 3.5 mm Microwave Airline Calibration Kit
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Radio Frequency Technology Division Guided Wave Electromagnetics Group (672.01)
General Statement of Need:
The National Institute of Standards and Technology (NIST), CTL/RFT, in Boulder, CO has a requirement to produce broadband electrical calibration artifacts as part of its calibration service for scattering parameter traceability up to 33 GHz. Precision manufactured calibration artifacts are required to maintain accurate traceable calibrations for internal and external customers.
Development in coaxial connector technology has been made allowing production of higher precision airline calibration artifacts in the 3.5 mm connector type. To calibrate the scattering parameters of passive microwave electronics to 33 GHz, a metrology grade 3.5 mm airline kit is required.
Item Specifications and Quantities:
Item 1: 3.5 mm Microwave Airline Calibration Kit Quantity: 1 EACH Specifications: 1.1 Calibration artifacts shall meet the IEEE specification for
Laboratory Precision Connectors for 3.5 mm connectors.
1.2 Airline calibration artifacts shall be beadless and surfaces involved in electromagnetic transmission and reflection shall be gold coated.
1.3 Female collets shall be slotless.
1.4 Contain the following standards:
1. 3.5 mm Female to Male airlines (3.94 cm)
2. 3.5 mm Female to Male airline (4.53 cm)
3. 3.5 mm Female to Male airline (4.94 cm)
4. 3.5 mm Female to Male airlines (7.0 cm)
5. 3.5 mm Female to Male airlines (5 cm)
6. 3.5 mm Female to Male airlines (5.3cm)
7. 3.5 mm Female to Male airlines (6cm)
8. 3.5 mm Female to Male airlines (7.5cm)
9. 3.5 mm Female to Male airlines (10cm)
10. 3.5 mm Female to Male airlines (15cm)
1.5 Contain a 8 in-lbs torque wrench, and any necessary software and documentation.
1.6 Dimensional measurements of conductor diameters and lengths shall be provided
Procurement Support Information and Ancillary Services:
Section Requirements/Specifications
Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
Mail Stop: 672.02 325 Broadway Boulder, CO 80305
Shipping Criteria:
☒ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock
Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☐ Delivery Shall Be Competed No Later Than:
Click or tap to enter a date.
☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☒ N/A
[Enter Electronic Media Requirements by Item.]
☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details] NOTE: TPOC shall be the coordination POC.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site
☐ Acceptance Expected to Not to Exceed 7 Business Days
☒ Acceptance Expected to Exceed 7 Business Days:
30 Days
Training
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other ☐ [Enter Other Scope of Training
Requirements] Location: [Enter Location(s)]
Training Materials to be Provided by Government:
[Choose Answer]
Scope of Training Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: TPOC shall be coordination POC.
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable or Warranty Length: 1-Year
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
Calibration ☐ N/A
Dimensional measurements of airline component conductor diameters and lengths Calibration Plan Length: [i.e. 3 - Years] What is Included?
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] 2 Option Periods ☐ 3 Option Periods 4 Option Periods (Maximum)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods ☐ 3 Option Periods ☐ ☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
Maintenance ☒ N/A
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period Length: [i.e. 1 – Year / 6 - Months]
2 Option Periods ☐ 3 Option Periods 4 Option Periods (Maximum)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ Samples for Testing ☐ Equipment which will leave Government Site ☐ Description:
Serial Number:
NIST Property Number:
File details come from the government source that posted it. Updated .