Specifications .pdf

PDF 231 KB Posted

Attached to
High Power Broadband RF Amplifiers Federal contract opportunity
Solicitation number
NB6720102502215
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This Requirements/Specification Document details a solicitation by the National Institute of Standards and Technology (NIST) for two High Power Broadband RF Amplifiers with matching heatsink assemblies for the Communications Technology Laboratory's Radio Frequency Technology Division. The amplifiers must operate across 0.2 GHz to 35 GHz with >42 dB typical small signal gain, >33 dBm saturated power, and have specific technical requirements including 50 Ohm input/output impedance, female 2.92 mm RF connectors, and a sealed metal package measuring 300 mm x 200 mm x 55 mm. Each amplifier requires a matching heatsink assembly with an aluminum or copper design, attached fan, and capability to dissipate 100 W of heat.

The solicitation specifies delivery shall be completed no later than 10/1/2025, with shipping to NIST-Boulder at 325 Broadway, Boulder, CO 80305. The procurement includes two amplifier units and two corresponding heatsink assemblies. Vendors are expected to provide new equipment with manufacturer performance checks, and NIST anticipates acceptance within 7 business days. The base manufacturer warranty is acceptable, and no additional installation, training, calibration, or maintenance services are currently required. The solicitation number is NB6720102502215, with questions to be directed to lia.arthofer@nist.gov within five days of posting.

View the file

Other files for this federal contract opportunity

Other files attached to High Power Broadband RF Amplifiers, newest first.
File Type Posted
RFQ NB6720102502215.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: High Power Broadband RF Amplifiers

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division Guided Wave Electromagnetics Group (672.01)

General Statement of Need:

The National Institute of Standards and Technology (NIST)/Communications Technology Laboratory (CTL) needs to amplify swept continuous wave signals from a vector network analyzer for nonlinear measurements with high power and high dynamic range. The amplifiers must provide >33dBm saturated power with >40 dB gain for frequencies from 0.2 GHz to 35 GHz.

Item Specifications and Quantities:

Item 1: Solid State Power Amplifier Quantity: 2 EACH Specifications: 1.1 0.2 GHz to 35 GHz frequency range of operation

1.2 >=42 dB typical small signal gain over frequency range

1.3 1 dB compression point >32 dBm typical from 0.2 GHz to 32

GHz

1.4 Stable operation across all operating conditions with 10 dB minimum return loss (50 Ohm reference impedance) termination connected to the RF output and input

1.5 50 Ohm input and output RF impedance

1.6 24 V, 3 A DC max power supply required

1.7 Female 2.92 mm input and output RF connectors

1.8 Sealed metal package with mounting holes to match

heatsink (item 2) for room temperature lab operation

1.9 300 mm x 200 mm x 55 mm maximum package dimensions

1.10 New equipment with performance checked by the

manufacturer before shipment

Item 2: Heatsink Assembly Matched to Item 1 Quantity: 2 EACH Specifications: 2.1 Aluminum or copper heatsink with attached fan

2.2 Tapped mounting holes matching Item 1 mounting hole

pattern

2.3 100 W typical heat dissipation power without exceeding working temperature of item 1 or item 2 (room temperature ambient environment)

2.4 24 V, 3 A DC max power supply required

2.5 300 mm x 200 mm x 55 mm maximum package dimensions

2.6 New equipment with performance checked by the

manufacturer before shipment

[List any additional item(s) or service requirements using the same format.]

Procurement Support Information and Ancillary Services:

[Provide input for each section Below or Mark Not Applicable (N/A)]

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN: Bryan Bosworth Mail Stop: 672.01 325 Broadway Boulder, CO 80305

☐ NIST-Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address] Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock

Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☒ Delivery Shall Be Competed No Later Than:

10/1/2025 ☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:

[Enter Details] NOTE: SME shall be the coordination POC.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available

Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

☒ Acceptance Not Expected to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

[Duration]

☐ Inspection and Acceptance Plan:

[Explanation]

[Enter Other Requirements]

Training

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials] ☐ Training Materials to be Provided by Vendor:

[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other [Enter Other Requirements]

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government Furnished Material / Equipment ☒ N/A

List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

[Enter Other Requirements]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .