Specifications.pdf

PDF 289 KB Posted

Attached to
Linear Power Solid State RF Amplifier 18 - 26. 5 GHz Federal contract opportunity
Solicitation number
NB672020-25-00130
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This document is a Requirements/Specifications document for a federal contract opportunity to acquire a linear, solid state RF power amplifier from 18-26.5 GHz with a minimum output of 20 Watts. The key details are:

The government is seeking 1 unit of the specified RF power amplifier with detailed technical requirements including power output, frequency range, gain, input/output, controls, and other physical and performance characteristics. The contract opportunity is a combined synopsis/solicitation under FAR 12.6 and 13.106, with the solicitation number NB672020-25-00130. Offers must be submitted electronically by the specified closing date and time. The procurement is an unrestricted competition under NAICS code 335999 with a 600-employee small business size standard. The contracting agency is the National Institute of Standards and Technology (NIST), a civilian agency within the Department of Commerce.

View the file

Other files for this federal contract opportunity

Other files attached to Linear Power Solid State RF Amplifier 18 - 26. 5 GHz, newest first.
File Type Posted
Amd 01 Qs and As.pdf PDF
RFQ NB672020-25-00130 RF Power Amplifier.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: RF Power Amplifier (18 - 26.5 GHz)

Requesting Laboratory / Division / Group:

Communications Technology Laboratory RF Technology Division Electromagnetic Fields Group 672.02

General Statement of Need:

The Electromagnetic Fields Group is in need of a linear, solid state RF power amplifier from 18 – 26.5 GHz, with continuous wave operation and an output of 20 Watts across the specified band.

Item Specifications and Quantities:

Item 1: Linear Power Solid State RF Amplifier 18 - 26.5 GHz Quantity: 1 EACH Specifications: 1.1 Power output at least 20 Watts across specified frequency range

1.2 Frequency Range: 18 – 26.5 GHz

1.3 Small signal gain +46 dB minimum

1.4 Gain Flatness +/- 4 dB maximum

1.5 Saturation power: minimum 20 W

1.6 Input VSWR 2:1 maximum

1.7 RF Input +3 dBm

1.8 Allow input signals of continuous wave, amplitude

modulation, frequency modulation, phase modulation, and pulses

1.9 Spurious signal at saturation power: -65 dBc

1.10 Input: 3.5mm or 2.92mm female

1.11 Output: WR42

1.12 Gain adjustment range: 15 dB

1.13 Weight limit: 26 lbs

1.14 Size: 483mm x 516 mm x 147mm

1.15 Front panel with RF input/output connections

1.16 Front panel digital display and controls with forward and reverse power readings, gain adjustment, ALC on/off, fault indication, standby mode

1.17 Ethernet, IEEE-488 and/or RS232 connections

1.18 Operating temperature 0 Celsius to +50 Celsius

1.19 Solid state GaN power amplifier

1.20 New unit (not used)

1.21 Warranty – 2 years (see below)

Procurement Support Information and Ancillary Services:

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN: TBA

Mail Stop:

325 Broadway Boulder, CO 80305

☐ NIST-Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address] Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock

Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement]

Delivery Date Criteria:

☒ Delivery Shall Be Competed No Later Than:

'TBD' Weeks ARO ☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software – drivers for remote control

☐ Electronic Manuals

☐ License Key

☐ Other:

[List Any Other Electronic Media Requirements]

☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation ☒ N/A

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site

☐ Rigging

☐ Uncrating / Unpackaging

☐ Removal of Packaging Material

☐ Equipment Set Up

☐ Start-Up Services

☐ Turnkey Installation

[Enter Details] NOTE: TPOC shall be the coordination POC.

Facility / Utility Considerations ☐ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☒ Power Available

Voltage: 120 (V) Maximum Current: 18 (A) Phase: Single phase

Frequency: 60 Hz NEMA Plug Type: 5-15P Environment: Common Lab / Office Environment Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

☒ Acceptance Expected to Not to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

[Duration]

☐ Inspection and Acceptance Plan:

[Explanation]

[Enter Other Requirements]

Training ☒ N/A

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials] ☐ Training Materials to be Provided by Vendor:

[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: TPOC shall be coordination POC.

Warranty ☐ N/A

Extended Warranty Required Warranty Length: 24 Months What is included?

☒ Labor ☒ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other [Enter Other Requirements]

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods

☐ 4 Option Periods (Maximum)

Calibration

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government List Any Government Furnished Material / Equipment Per Item]

Furnished Material / Equipment ☒ N/A

☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

[Enter Other Requirements]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .