This document is a specification for a Vertical Tilt-Frame Bandsaw to be procured by the Defense Logistics Agency (DLA) Maritime Puget Sound Naval Shipyard/TRF Bangor. The key details include:
The specification outlines the requirements for a complete "turn-key" Vertical Tilt-Frame Bandsaw system, including design, manufacture, testing, installation, and training. The system must meet detailed technical specifications such as cutting capacity, blade drive, tilting column, feed force, coolant system, and programmable controls. The contractor is responsible for demolition/removal of the existing bandsaw, installation and set-up of the new system, and providing training for operators and maintenance personnel. The government will provide access, utilities, and storage space to support the contractor's work. The equipment must be delivered and installed within 180 days of contract award, and will be subject to inspection, testing, and final acceptance by the government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPMYM2-24-Q-2206.pdf | ||
| SOLE SOURCE.pdf | ||
| EXHIBIT B CDRL.pdf | ||
| EXHIBIT A CDRL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification for a Vertical Tilt-Frame Bandsaw
Project # 229-310 16 Jul 24
1 SCOPE
This specification reflects those characteristics that are essential to the minimum needs of the government for a Vertical Tilt-Frame Bandsaw. The scope of work shall include the “Turn-Key” set-up, operational testing and training of the equipment as specified herein. It is the government’s intent that a single (primary) contractor be awarded this contract and be responsible for the accomplishment of all work detailed by this specification.
2 APPLICABLE DOCUMENTS
The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on the date of an invitation for bids or a request for proposals shall apply.
2.1 SAFETY REQUIREMENTS
• Safety Requirements For TRIDENT Refit Facility (TRF), Bangor
A copy of this document is attached to this specification (See Enclosure 1).
2.2 ADDITIONAL SAFETY REQUIREMENTS In addition to the safety requirements specified in Paragraph 2.1, the following is requisite:
2.2.1 The equipment and its component parts shall be in compliance with applicable Code of Federal Regulations (CFR) Title 29, Part 1910. By definition, any equipment will be deemed acceptable and approved by TRF, Bangor, if it meets specific Occupational Safety and Health Administration (OSHA) conditions outlined in CFR Title 29, Part 1910; Subparts "O" and "S". Specifically, equipment will be "Accepted" by TRF, Bangor, if it has been inspected and found by a Nationally Recognized Testing Laboratory (NRTL) to conform to specified plans or procedures of applicable codes. The equipment (as a whole system) shall be Nationally Recognized Testing Laboratory (NRTL) inspected and certified (by an OSHA authorized third party). Two (2) “hard” copies of the NRTL certification report shall be provided. If the equipment type/model has already been NRTL inspected and certified, a certification report (two (2) ”hard” copies) or documentation mounted on the equipment, (which acknowledges it is NRTL certified), shall be provided.
3 GENERAL REQUIREMENTS
3.1 ENVIRONMENTAL COMPLIANCE REQUIREMENTS - The contractor shall inform the NBK Environmental Division of proposed air emissions changes or additions of plant equipment or processes so that a review of the equipment and processes can be made to ensure the changes are within the existing permits, or make application for a revised or new permit. This includes any proposed discharges of industrial wastewater to the sanitary sewer system.
3.2 HAZARDOUS MATERIAL CONTROL shall include the following:
3.2.1 The Contractor shall submit a Contractor Hazardous Material Inventory Log to NBK Environmental that lists all hazardous materials being used on the installation for the project and an estimated quantity of each amount being used. The CHMI shall be accompanied by all relevant SDSs. Once approved by NBK Environmental, the hazardous material is authorized for use on the installation. The contractor must keep the CHMI and associated SDSs with them onsite where the work is being performed. All containers of hazardous material shall be resealed, placed in a secure area while on base, and transported off base for reuse of material at other contractor projects.
CHMI Log can be found at the following link:
https://www.wbdg.org/FFC/NAVGRAPH/01%2057%2019_hazardous_material_inventory_log.pdf
In addition to the materials (for example, paints, lacquers, thinners, adhesives, sealants, cleaners) required in the Contractor Hazardous Material Inventory Log, include the following materials:
3.2.1.1 If performing abrasive blasting operations, denote blast grit usage, blast nozzle throughput in tons, and blasting unit efficiency.
3.2.1.2 If performing welding, denote welding rod usage and welding rod type (for example, aluminum, carbon steel).
3.2.2 Contractor shall not use Hazardous Material (HM) composed of any of the following chemicals or substances: Leads, chromium, mercury, phenols, trichloroethylene, chlorofluorocarbons, halon, PCBs, asbestos, silica sand (for use as blasting agent), Class I and II Ozone Depleting Substances (ODS), radioactive materials or instruments capable of producing ionizing radiation, and chemicals listed in 40 CFR 355.50 Appendix B.
3.2.3 Hazardous Waste Control shall include the following:
3.2.3.1 The government shall determine if waste is hazardous or non-hazardous. A WIS will be completed for each hazardous waste prior to start of work.
3.2.3.2 A trained individual from the government shop with a current Waste Originator certification must be present for each shift that hazardous waste is produced.
3.2.3.3 Disposal Of Hazardous Waste – TRF, Bangor Site is the owner of all hazardous waste generated within its facilities. This includes hazardous waste generated by contractor personnel while working at TRIDENT Refit Facility. All hazardous waste generated by this contract shall be turned over to the activity for disposal prior to the end of the work shift. The shop shall submit completed NBK Bangor Waste Information Specification (WIS) forms for all hazardous waste expected to be encountered during the course of this project (prior to the start of work). The BEO will provide final waste designation along with WIS instructions. If additional wastes are produced after this plan is approved, waste is encountered that was not identified, or changes occur to waste streams that have already been assigned a WIS number, a new or updated WIS for each waste stream must be submitted to the BEO for designation.
3.2.3.4 A hazardous waste label must be affixed to the appropriate container upon the first addition of waste. If more than 55 gallons of Dangerous Waste (DW) or 1 quart of Extremely Hazardous Waste (EHW) is produced, the date must be filled in on the label. All containers must be under the control of the shop and located in the same area the waste is generated.
3.3 OTHER CLEAN AIR ACT COMPLIANCE REQUIREMENTS
3.3.1 Emission Standards: Opacity from Contractor equipment and operations must be in compliance with PSCAA Regulation I, Section 9.03, including but not limited to Visual Emissions (Opacity), Odor, Fugitive Dust, Spray Coating, Crushing, and Maintenance of Equipment.
3.3.2 Volatile Organic Compound Emission Control: Do not leave containers of paint, epoxy, or solvent open to the atmosphere unless they are being used. Secure containers at the end of each shift. Do not use evaporation as a means of minimizing or disposing of hazardous waste.
3.4 GENERAL DESCRIPTION OF SYSTEM - The following shall meet the minimum government requirements for a Vertical Tilt-Frame Bandsaw:
3.4.1 WORK INCLUDED - The Contractor shall be responsible for the following:
• Design, manufacture, test and groom all equipment required to provide a complete system and in accordance with the requirements specified herein.
• All shipping, crating, and rigging costs associated with the transport and delivery of the equipment specified herein.
• Complete documentation and organization of all technical data which applies to the operation, maintenance, repair and testing of the specific equipment.
• Installation in our facility of the specified equipment with the features identified in this specification.
This includes connection of the equipment to required available utilities.
• Removal and disposal of the existing bandsaw.
• Provide training to personnel on the proper operation and maintenance of the installed equipment and its component parts.
3.4.2 WORK NOT INCLUDED - The government/receiving activity will provide:
• Air, electrical and other utilities services (within 100 feet) as required for the proper operation of the equipment unless otherwise stated herein.
3.6 CONDITIONS OF SERVICE AND PERFORMANCE - The following service and operational conditions shall apply to the equipment delivered under this specification.
3.6.1 Environmental Conditions - The unit shall be designed to operate in a non-air conditioned manufacturing building in an industrial environment, with the following conditions:
• Temperature Range: 15 to 110 oF
• Relative Humidity: up to 100% Non-Condensing
3.6.2 Electrical - The proposed system shall not require more than 60 AMPS (48 Amps computed FLA) of 460 VAC, 3-phase, 60 Hz electrical power, in its fully configured and operational state.
3.6.3 Compressed Air - Compressed air available for air-actuated mechanisms is 90 pounds per square inch gage and 100 cubic feet per minute (nominal). If the proposed system requires more air than indicated above, the excess capacity shall be provided as part of the equipment. Any proposed compressed air system shall include a regulator(s) and a filter(s) with an automatic drain.
3.7 GENERAL EQUIPMENT REQUIREMENTS:
3.7.1 Standard, Off The Shelf Components - All materials and parts comprising the system shall be new, of current design and manufacture, and shall not have been in prior service except as required for factory testing.
Standard, off the shelf components with proven reliability shall be used wherever possible to increase performance reliability and reduce costs. The system components shall be one of the manufacturer’s current production models which, on the day this solicitation is issued, has been designed, engineered and sold, or is being offered for sale through advertisements or manufacturer’s published catalogs or brochures. System components such as a prototype unit, pre-production model, or experimental unit DO NOT qualify as meeting this requirement. The system shall be complete, so that when connected to the utilities identified herein, it can be used for the function for which it is designed and constructed.
3.7.2 Painting - All surfaces shall be painted in conformance with the manufacturer’s standard practices and good workmanship. Painting shall result in a highly wear-resistant finish, which guarantees continued protection to the surfaces covered against the specified environment under all service conditions. The manufacturer’s standard color shall be provided. Lead base or chromium base paints are prohibited.
3.7.3 Caution - Warning Plates - Corrosion resistant “Caution” or “Warning” plates shall be securely attached to system components in visible locations, with any safety precautions to be observed by the operator or maintenance personnel permanently marked on the plates.
3.7.4 Identification Plate - An identification plate shall be furnished with the system. A nameplate shall be affixed to each major component of the system showing the manufacturer’s name, equipment model, year of manufacture, and any other pertinent information for identifying the part as a unique component of the system.
3.7.5 Emergency Stop Button - The equipment specified herein shall each be provided with an emergency stop button at the operator’s station. This stop button shall be the mushroom type, shall be colored red, and shall be labeled as such. When activated, the emergency stop button shall disconnect all electrical power to the equipment such that the all operations or functions will immediately stop or cease.
3.7.6 All Electrical Components including motors, starters, relays, switches, and wiring shall conform to and be located in accordance with the applicable NFPA, NEMA, and ANSI standards for the intended application.
3.7.6.1 Motors - Motors (if required) shall be rated for continuous duty. Motors shall be equipped with ball bearings of the sealed and permanently lubricated type. All electrical motors shall meet NEMA-MG1 requirements.
3.7.6.2 Power Disconnect Box - A new lockable power disconnect box (that can be locked out with a lock utilizing a key), shall be provided and installed on the equipment. The disconnect box shall have a proper sized fused device (i.e. following the NEC, etc.), that shall protect the machine from a power surge, etc. The contactor shall mark the disconnect box with a “fed from power panel” identification label and mark the power panel schedule with a “fed to” identification label.
3.7.7 Asbestos – No asbestos products/materials shall be used in any components (i.e. gaskets, etc.) of the equipment. The equipment shall be asbestos free.
3.7.8 New Developments - The contractor shall identify any new developments that would improve the efficiency, accuracy or productivity of the equipment or would decrease its operating costs. The contractor shall notify the Contracting Officer and technical POC in order that the new developments may, at the Government's option, be included in the equipment. Reports of such developments shall be addressed to the Contracting Officer.
3.8 EQUIPMENT TO BE PROVIDED - One (1) Vertical Tilt-Frame Band Saw/ Metal Cutting Band Saw (Machine and Methods Inc., Amanda Machinery American, Inc, Product #VT50635W/ 2150APCS (or equal) with automatic indexing, heavy-duty, hydraulic, metal cutting, high speed bandsaw with programmable control and servo shuttle, to include the following minimum (or equal) features:
3.8.1 Material Cutting Capability:
3.8.1.1 Nominal - Rectangles: 20" x 25" (508 mm x 635 mm); Rounds: 20" (508 mm)
3.8.1.2 Blade at 45°- Rectangles: 20" x 17" (508 mm x 432 mm); Rounds: 17" (432 mm)
3.8.1.3 Blade at 60°- Rectangles: 20" x 11.25" (508 mm x 285 mm); Rounds: 11.25" (285 mm)
3.8.2 Blade Drive - Electric with sensor less vector control for smooth acceleration and full torque
3.8.3 Table Height - 40” Table work height
3.8.4 Speed Range - Infinitely variable: 500 FPM (9 to 152 m/min), 10 HP Standard. Blade speed can be automatically set when material is selected
3.8.5 Tilting Column - For miter cutting up to 60o left and right of vertical. Electronic tilt- The column is electrically powered, chain driven, with encoder feedback and AMADA MARVELPC3 touch screen controller for precision miter positioning
3.8.6 3° Canted Column - Standard 3-degree forward approach angle for increased efficiency in cutting of structural materials
3.8.7 Feed Force - Direct Force Sensing Electric Ball Screw Feed 0 – 350 lbs. (1560 N); column travels on recirculating linear ball ways. Feed pressure can be automatically set when material is selected
3.8.8 Blade - 18' 2" (5537 mm) long x 1.5" (41 mm) wide, .05" (1.27 mm). One Welded-Edge Band is furnished with each machine as part of standard start-up supplies
3.8.9 Blade Guides - Rotating Easy Load Combination Carbide and Ball Bearing Roller guides with self-tensioning design
3.8.10 Blade Tension -Hydraulically controlled, 45,000 psi. max. (310 MPa). Machine equipped with automatic blade break/blade stall shut-off switch.
3.8.11 Upper Blade Guide Arm - Hydraulically positioned and locking, controlled by selector switch at operator's station
3.8.12 Vises -Hydraulic, full stroking with 9-1/2” high x 15” wide 60° faceplates, with optional variable vise pressure (Option Code: M9A)
3.8.13 Coolant System - Built-in with Flood system (60 Gallon Capacity), with Drop Lubrication system (requires compressed air connection) (Option Code ML2), including chip pan with chip removal ramp, with power Chip Conveyor Option Code: M8)
3.8.14 Work-Rest Rollers - Two turned ball bearing rollers, one on the entry side and one on the discharge side of the machine bed
3.8.15 Flushing Hose - Washes away chips from hard-to-get-at places reducing clean-up time
3.8.16 Automatic Bar Feed - The Automatic Bar Feed design features a 48” stroke length with indexing speeds of up to 60 ft./min., and creep speeds of 33 in. /min. The bar feed vise is servo driven with encoder feedback and combines precision double ball screws with preloaded recirculating linear guides, resulting in positioning accuracy of +/- .005” per index. The vise itself is hydraulically clamped to prevent material slippage. Optional outboard and second machine vises are available (must specify right- or left-hand machine configuration at the time of order (Option Codes: F3 & F4)
3.8.17 Amada Machinery PC3 Programmable Control® - Provides a Programmable Logic Control Unit with a 12” color, touch screen display. The control features graphical part programming with memory for up to 500 jobs and parts, as well as a material selection chart and customizable material library. Both blade speed and feed force are automatically blade set according to material type for optimal cutting performance. Job programming consists of setting the cut-off length, angle and number of pieces to be cut. Additional features include Inch/Metric capability, out-of-stock shut down device, a fast cut job option and expanded memory storage using removable media. Also shall include Jammed Blade Protection that senses resistance as the column returns and stops to prevent blade damage.
Material shall also be fed through the machine manually in both directions using the hydraulic shuttle vise. Blade can be stopped with all other power functions operative.
3.8.18 Standard Left-to-Right Work Entry
3.8.19 Motors - Main Drive: 10 H.P., 1800 RPM, totally enclosed, fan cooled, ball bearing; Coolant Pump: 1/8 H.P. (.1 kW), I.P. 54 Rating, totally enclosed motor built-in integrally; Hydraulic Pump: 5 H.P. (3.7 kW), 1800 RPM, totally enclosed fan cooled, ball bearing, system pressure 900 psi (6.2 MPa)
3.8.20 Controls - IEC fused disconnect switch and magnetic motor starters with overload and low-voltage protection. Power supply provides low voltage (24 volts DC) control to all push buttons at operator's control panel and machine lighting circuits. PLC control and drives mounted in moisture tight compartment with vibration isolation mountings. Electrical Equipment conforms to National Electrical Code NFPA 79. The Electrical Control Panel is U.L. Labeled
3.8.21 Work-Lift Roller on Right Side of Machine Bed - Eccentric type, manually controlled, hydraulically operated to raise roller slightly above machine table to facilitate the passage of material over the surface of the worktable
3.8.22 Work-Lift Roller on Left Side of Machine Bed - Eccentric type, manually controlled, hydraulically operated to raise roller slightly above machine table to facilitate the passage of material over the surface of the worktable
3.7.23 Table Height - 40”
3.7.24 Standard Machine Color
3.7.25 Shipping Weight - 8,300 lbs (3,727 kg) base machine & index table.
3.8 ACCESSORIES/SERVICES TO BE PROVIDED – For One (1) Vertical Tilt-Frame Band Saw/ Metal Cutting Band Saw (Machine and Methods Inc., Amanda Machinery American, Inc, Product #VT50635W/ 2150APCS (or equal) to include the following minimum (or equal) features (all accessories/services shall be for a Left-To-Right Work Entry capacity):
3.8.1 Powered Chip Conveyor (Amanda Machinery American, Inc, Product #M8/ Part #2125DA00342).
Automatic motorized “scraper type” chip conveyor shall be provided (in place of standard chip ramp). Shall include drive motor with gear reduction and automatic shut off.
3.8.2 Variable Vise Pressure (Amanda Machinery American, Inc, Product #M9A/ Part #2125AB00332). Shall enable hydraulic pressure of work holding vises that can be adjusted as required. Shall include hydraulic pressure gauge and operator control
3.8.3 Second Machine Vise - Complete (Amanda Machinery American, Inc, Product #F4. For clamping work on both sides of the blade, permitting trim cuts on both ends of the work piece. Shall include hydraulic cylinder, front and rear jaw and fittings.
3.8.4 Hydraulic Hold-Down – Machine (Amanda Machinery American, Inc, Product #F8. (Nest clamp) mounted on the machine table. For vertical clamping of structural shapes, or multiple bar work. Capacity 20” (508
mm) horizontal, x 21” (533 mm) vertical and shall include all extension bars
3.8.5 Hydraulic Hold-Downs – Shuttle – Standard for use with 48” Shuttle (Amanda Machinery American, Inc, Product #F8A. (Nest clamps) one mounted on index table. For vertical clamping of structural shapes or multiple bar work. Capacity 20” (508 mm) horizontal, 21” (533 mm) vertical. For use with the standard 48-inch automatic index table and shall include all extension bars
3.8.6 Mist Lube - Automatic (Amanda Machinery American, Inc, Product #ML2. Drop Lubrication system, with use with a compressed air connection
3.8.7 Smart Guide Arm (Amanda Machinery American, Inc, Product #SGA1. Shall automatically position the guide arm to the part material and shall prevent guide arm contact with the vises. During an automatic cut-cycle the guide arm shall be raised or lowered automatically for each step of a job
3.8.8 Bullet Nose Cutting (Amanda Machinery American, Inc, Product #PC3SBN). This optional feature shall allow the automatic cutting of multiple angles on the end of an incoming work piece. The desired angles shall be easily programmed into the Amada MarvelPC3S control using our intuitive graphical interface. Following the initial cut in a multi-angle program, the bar feed table shall automatically advance the work piece far enough to clear the cutoff piece from the work area. It shall then repositions the work piece as required for the subsequent cuts. The ability to program and run parts of this type automatically shall saves time by eliminating the need for additional handling and secondary set ups
3.8.9 Outboard Vise on Shuttle (Amanda Machinery American, Inc, Product #F3/ 2125FD00351). A second bar feed vise shall be mounted in fixed position beyond shuttle vise for additional clamping of incoming work (to clamp in conjunction with Machine Vise). Shall allow for use of “pusher” bar for continuous cutting from one bar to the next
3.8.10 45º Vise Jaw Faceplates (Amanda Machinery American, Inc, Product #F5/ 2125SF5). One set of 12” high x 16-1/2” wide faceplates. Shall be interchangeable with the standard 60° vise jaw faceplates
3.8.11 Unist Coolube 2210 (one gallon) (Amanda Machinery American, Inc, Product #CL2210). Unist Coolube 2210 cutting oil and lubricant (for the mist drop lubrication system). It shall be formulated as a metal cutting oil and lubricant for metals, wood, rubber, and most plastics. It shall be 100% natural, non-toxic, non-staining, and shall not oxidize (become sticky or leave a residue). Coolube 2210 cutting fluid shall not contain any ingredients currently recognized as hazardous by OSHA, IARC or NIP. Coolube 2210 machining oil shall never cause dermatitis and shall be formulated from cosmetic grade raw materials, which makes it entirely worker and environmentally safe.
Coolube 2210 shall be a USDA certified biobased product
3.8.12 Laser Alignment Light (Amanda Machinery American, Inc, Product #LAL/ 2125A01459 or 00046). A laser shall project for quick spotting of the cut to be made
3.8.13 First Section Dead Roller Table, 10’ 0”/ 3048 mm Long (Amanda Machinery American, Inc, Product #F106). Six Ball Bearing Idler Rollers, 3.5” (89 mm) diameter, spaced on 20” (508 mm) centers; (6 Flush Plates, Discharge side only), and Coolant Pan.
3.8.14 Extension Dead Roller Table 5’ 0”/ 1524 mm Long (Amanda Machinery American, Inc, Product #X053/ 2125FK19129). Three Ball Bearing rollers, Coolant Pan, no Flush Plates. For use with and as an extension to F106 (and/or in combination with other extension sections, live or dead).
3.9 CONTRACTOR DEMOLITION/REMOVAL SERVICES TO BE PROVIDED - The specified equipment and all associated equipment shall be demolished/removed by the contractor, from the current area(s) designated for this equipment by the Receiving Activity Point of Contact. The contractor shall provide all personnel, and supplies necessary for the complete demolition/removal of the existing old Marvel Saw Model 2125A-PC60, NID #: 68438G0506 (except as noted elsewhere in this specifications).
3.9.1 The contractor shall provide credit in the solicitation bid for system components that have a trade-in value.
3.9.2 Demolition/removal includes proper disconnection/capping of existing utilities (i.e. electrical), and all other items required to remove the existing equipment.
3.9.3 The contractor shall properly dispose (via recycling if possible) existing non-hazardous demolition materials.
3.9.4 The contractor shall properly patch the flooring of equipment that had been mounted to the floor.
3.9.5 The government shall determine if waste is hazardous or non-hazardous. A WIS will be completed for each hazardous waste prior to start of work.
3.9.5.1 Demolition Hazardous Waste Disposal - Please see Section 3.2.3.
3.9.5.2 Demolition Non-Hazardous Waste Disposal - The contractor shall properly be responsible for and dispose of all non-hazardous waste products produced during the removal/installation of contractor provided services for this project.
3.10 CONTRACTOR INSTALLATION AND SET-UP SERVICES TO BE PROVIDED - The specified equipment and all associated equipment shall be assembled, installed, set-up and tested by the contractor in the area(s) designated as its functional work area by the Receiving Activity Point of Contact. The contractor shall provide all personnel, and supplies necessary for the complete installation and set-up of the proposed system (except as noted elsewhere in this specifications).
3.10.1 Installation of the new equipment includes connecting available utilities (i.e. power), and other work required to properly install the equipment. This includes running proper sized wiring (if needed to meet NEC), from an existing power panel, to the new equipment location. If required, this includes providing and installing a new appropriately sized breaker(s), as well as removing an existing breaker(s) and/or power panel blanks(s). Utilities installation shall include the contractor requesting each necessary utility outage(s) – if needed. Existing wiring, breakers, etc. may be re-utilized (if in proper condition and meet NEC). The contractor shall complete and submit an outage request form (for each required utility outage), and pay a nominal outage fee (for each outage) to the local Base Operating Services Contractor (BOSC) (who will secure/re-energize the utility source). The contractor shall coordinate all outages with the BOSC.
3.10.2 Installation also includes properly mounting the equipment to the existing concrete pad (with anchor bolts).
3.10.3 Coordination - The Contractor shall contact the Receiving Activity Point of Contact with a proposed installation schedule (at least one week before the installation starts). The installation schedule shall be reviewed and approved of the Receiving Activity Point of Contact. The Contractor shall coordinate the site preparation and the delivery of the equipment/materials in a manner which causes minimum disruption/interference with the activity’s normal business routine.
3.10.5 Work Process - The Contractor shall provide a field supervisor to direct set up and testing. The field supervisor shall have full authority to implement his field decisions in an expeditious manner. No work shall be accomplished when the field supervisor is not in the immediate work area.
3.10.6 Lifting And Rigger Services - The contractor shall provide all material handling equipment necessary to unload the specified equipment, transport it to the installation site and any other equipment (such as forklifts, man-lifts, etc.) necessary for continuous support of the removal, transportation and installation of the specified equipment, and shall provide qualified personnel to operate it by the contractor. No cranes shall be used.
3.10.7 Crane/Weight Handling Equipment (When Used as a Crane) Services - All weight handling evolutions where a load is suspended from any type of weight handling equipment shall conform to the requirements of NAVFAC P-307 (June 2016) Management of Weight Handling Equipment. Applicable sections of P-307 include “Contractor Operated Cranes”, “Operator Licensing”, “Rigging Gear and Miscellaneous Equipment”, and “Appendix P – Contractor Crane (or Alternate Machine Used To Lift Suspended Load) and Rigging Gear Requirements”. The contractor shall prepare the “Certificate of Compliance” and the “Contractor Crane or Rigging Operation Checklist” in P-307 Appendix P. Each lift shall require the submission of a Lift Plan, and approved by the receiving activity’s weight handling engineering department. The Lift Plan shall meet the requirements listed in the NAVFAC P-307. Additional site specific requirements may be found in the attachments to this document.
3.10.8 Contractor Site Visit - The contractor may request to make a site visit to the facility prior to submitting a bid. This shall include viewing the existing facility, utilities, etc. The contractor shall have a complete understanding of the requirements for the installation of the specified equipment (prior to bidding on this project).
3.10.9 Installation Hazardous Waste Disposal - See Section 3.2.3.
3.10.10 Installation Non-Hazardous Waste Disposal - The contractor shall properly be responsible for and dispose of all non-hazardous waste products produced during the removal/installation of contractor provided services for this project.
3.10.11 Start-Up Supplies – The contractor shall be required to furnish start-up supplies necessary for the proper operation of the specified equipment.
3.11 INSTALLATION SUPPORT SERVICES PROVIDED BY THE GOVERNMENT - The activity will provide the following in support of the installation:
3.11.1 Receiving Activity Point Of Contact - Upon contract award, the receiving activity (TRIDENT Refit Facility, Bangor) shall designate a Receiving Activity Point of Contact who shall be responsible for appropriate surveillance and coordination of all services to be performed under this contract. The Receiving Activity Point of Contact shall serve as the contractor’s primary contact for all interaction with government activities.
3.11.2 Utilities - Reasonable amounts of water, shop air (80-90 psi) and electricity shall be made available adjacent (within 50 feet) to the assembly site at no cost to the contractor (for temporary use during the installation of the specified equipment). The Contractor shall be responsible for any costs incurred in connecting, converting and transferring the utilities to the work site.
3.11.3 Storage - Lay-down area will be provided within the vicinity of installation site for storage of Contractor materials and tools. The government does not accept responsibility for security of Contractor’s materials or tools.
The area must be kept clean and orderly, free of rags, paper and other debris. Failure to maintain area in a clean condition may result in the loss of the area. The Contractor shall be responsible to restore the storage area to original condition after use.
3.12 ON-SITE PERSONNEL TRAINING SERVICES TO BE PROVIDED - Within five (5) working days after satisfactory completion of acceptance testing of the system, the services of a qualified representative(s) shall be provided for specialized training to familiarize receiving activity personnel with the equipment and to help ensure reliable performance and maximum service life, during normal usage. All training shall be provided by a factory authorized distributer. Training services shall be rendered at TRF, Bangor. Training shall be scheduled by mutual agreement between the Contractor and the Receiving Activity Point of Contact. Two (2) weeks prior to the start of any training, the contractor shall provide a course outline for government review and comment. Training sessions shall be provided separately for each group/type of government personnel. The contractor shall provide all training manuals and guides. The government shall provide classroom space in close proximity to the equipment/shop (if needed). The entire contractor cost of providing the training (including travel, per diem, etc.) shall be covered by this contract. The training shall apply to personnel as follows:
3.12.1 Operator Personnel – Training shall be provided for personnel for a total period of two (2) hours, minimum). This training shall include preparation of equipment for operation and actual, safe operation of the equipment.
3.12.2 Maintenance Personnel (Mechanical/Pneumatic/Electrical/Electronic) - Training shall be provided for personnel at a journeyman mechanic level for a period of one (1) hour minimum. This training shall include trouble-shooting and methods of correction if the equipment malfunctions, with particular emphasis on minimizing equipment down time.
3.15 TECHNICAL DATA TO BE PROVIDED
3.15.1 Operator / Maintenance / Repair Manuals - The equipment shall be furnished with two (2) hard copies of the manufacturer’s standard Operation, Maintenance, and Repair Manual(s), bound in durable three ring binder(s). The manuals shall include all mechanical and electrical schematics showing discrete components/block diagrams/wiring diagrams with inputs and outputs identified/system electrical interface documents and drawings for the specific model of all machine equipment/drives/controls supplied. The information contained in the manual(s) shall reflect the unit and its components in the “as built” configuration. The information contained in the manual(s) shall be adequate to permit trouble shooting and repair of the equipment by journeymen level personnel. The information contained in the manual(s) shall be in the English language. The information contained in the manual(s) shall be in imperial units of measure. The vendor shall provide a “no asbestos used” statement, certifying that all products/materials (i.e. gaskets, etc.) used in the components of the equipment does not contain asbestos, as outlined in paragraph 3.7.7. The contractor shall provide a list of recommended consumable spare parts and possible sources for procurement. The contractor shall provide a warranty statement (The warranty period shall be for one (1) year minimum. The warranty period shall commence from the date of acceptance. All warranty work shall be provided by a factory authorized distributer.)
3.15.2 NRTL Certification Report - As outlined in paragraph 2.2.1
4 QUALITY ASSURANCE PROVISIONS
4.1 RESPONSIBILITY FOR INSPECTION - The Contractor shall be responsible for the performance of all inspection requirements (examinations and tests) as specified herein. The government reserves the right to perform any of the inspections set forth in this specification, where such inspections are deemed necessary to assure supplies and services conform to the prescribed requirements.
4.2 RESPONSIBILITY FOR COMPLIANCE - All items shall meet all requirements of this specification.
The inspection(s) set forth in this specification shall become part of the contractor’s overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the government for acceptance comply with all requirements of the contract. Sampling inspections, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements; however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the government to accept defective material.
4.3 INSPECTION/TESTING AT ORIGIN - Basic performance tests (prior to shipment) shall be conducted by the manufacturer on the primary equipment and all associated equipment to the extent practicable, to demonstrate functionality, to ensure contract requirements are being met. The tests may be performed by the contractor, either by personnel of their service organization directly, or by an independent testing agency. The contractor shall contact the government a minimum of two (2) weeks (NOTE: Longer on complex projects) before the completion of the manufacturing of the specified equipment. This shall allow the government the option of sending their technical representative(s) to witness the tests, and to ensure contract requirements are being met, prior to shipment of the unit to the government.
4.4 INSPECTION/TESTING AT DESTINATION
4.4.1 Initial Test And Grooming - The equipment delivered with the system shall be inspected by the government for mechanical and electrical integrity as follows: All welds shall be inspected for integrity and appearance. Surfaces shall be examined for sharp edges and burrs. Fasteners shall be checked for tightness and if fixed to prevent loosening due to vibration. Paint will be checked for flaking and blistering. Electrical requirements shall be examined for compliance to the National Electrical Code, (NFPA 70/79). The fit of parts shall be observed, with particular reference to the interchangeability of those that are likely to require replacement. Faults will be duly recorded and presented to the contractor for rectification.
4.4.2 Operational Tests - Upon satisfactory completion of the tests above, the equipment shall be set up for an operational test and evaluation. The contractor shall demonstrate the ability of the equipment to perform as required in this specification. All equipment functions shall be exercised to the extent necessary to prove proper operation in accordance with specification requirements. The system shall function, without failure, for the duration of this test period. If a failure occurs during the test period, repairs shall be immediately affected by the Contractor, and the tests shall be restarted from the first test. Three failures without completion of the test period shall be considered cause for rejection of the system. For the purpose of this test, a “failure” is defined as any equipment malfunction, which requires remedial action to restore the system to full operation in accordance with contract specifications.
4.5 PROVISIONS FOR REPAIR AND RETEST - In the event of a test failure, the contractor, at their discretion, may elect to correct the failed condition and request a retest of the system (vs. shipping the equipment back to the manufacturer for repairs).
4.6 FINAL ACCEPTANCE - Final acceptance shall be upon satisfactory completion of installation, inspection and testing of the system (as outlined in this specification).
5 DELIVERY
5.1 It is required that all equipment, goods and services (including final acceptance outlined in paragraph 4.6) identified in this specification, shall be completed prior to 180 days post contract award.
5.2 The Receiving Activity Officer shall be notified no less than one week prior to the arrival at the site of the specified equipment and/or contractor personnel.
5.3 Material transportation from the manufacturer’s facility to the work site shall be the responsibility of the contractor. Limited secured storage areas at the facility will not permit the government to store material for extended periods of time. Early shipment of materials, without the permission of the receiving activity shall be refused.
5.4 Packing Material - The use of shredded paper, whether newspaper, office scrap, computer sheets, or wax paper, in packing material for shipment to Navy activities, is prohibited.
5.5 It is the government’s intent that the Contractor delivers a fully operational and functional system meeting the requirements stated herein prior to acceptance by the receiving activity and final payment by the government.
Delivery of this system shall occur when all deliverable items of this contract have been received, installed and made operational and the contractor has demonstrated and the receiving activity has confirmed that the system meets or exceeds the requirements set forth in this specification and is ready for government use.
6 GENERAL NOTES
6.1 RESPONSE TO REQUEST - As a part of the response to this request, descriptive literature shall be furnished in sufficient detail to show that the proposed design will meet these specifications. Vendor submittals shall include brochures of the model being submitted, assembly sketches with critical dimensions, sketches (with dimensions) of all tooling provided, statements of compliance with specification, and performance statements with special attention to the key performance criteria stated herein.
6.2 ADMITTANCE TO THE WORK SITE:
6.2.1 Upon contract award, employees or representatives of the Contractor who require access to the Receiving Activity's facility at Naval Base Kitsap, Bangor (NBK, Bangor) shall be admitted to the work site only after they have been issued an appropriate Naval Region NW visitor security badge which is obtained at NBK, Bangor Pass & ID Office (located outside the NBK, Bangor Trident/ Main Gate).
6.2.2 Navy Region NW badge is required to gain access through the Operational Area Gate, or Waterfront Restricted Area, and is obtained through the on-line Base Authorization and Visit Request (BAVR) computer system. The prime contractor will need to submit all badge requests for their personal and for sub-contractor personnel. To request a Navy Region NW badge, use Internet Explorer or Microsoft Edge browsers, and go on line to "https://www.bavr.cnic.navy.mil, and submit a request for a badge, a minimum of five (5) business days prior to arrival. All requested information highlighted in red is mandatory. Type N/A for “Driver’s License Information”.
The "Command you are visiting" is: “Trident Refit Facility (TRF)”. The “Company Name or Command” and “Work Phone” is your company/command information. The “Originating Command Security Officer Information” should be left blank. The "Sponsor E-Mail" for an on-line badge should be aaron.k.peal1@navy.mil (Aaron Peal, 360-471-8624). In the "Purpose of Visit" box, please explain in detail the purpose of your visit, and include the Contract Number, the Receiving Activity Point of Contact (name and telephone number) and ALL the buildings/areas/piers you are visiting. The “Start Date” is the day you expect to pick up your badge (you cannot pick it up early, even if approvals are completed). The “End Date” is the last date of your visit. Also send a copy of the contract (or contract modification if the delivery date has been changed) to Dana Spangler at the e-mail address listed above. You will be notified at the e-mail address you provided, when all approvals have been completed. If BAVR doesn’t work contact the Receiving Activity Point of Contact or our security manager, Dana Spangler, 360- 689-8791to schedule a visit(s), and shall provide the following information:
* Full Legal Name
* US Citizen Status
* All Company Contact Information
* Contract Number
6.2.3 Visitors must show proof of US Citizenship (at the NBK Bangor Pass & ID Office, located outside Bangor’s Main Gate (Trident Boulevard), by having an original active US Passport, an "Enhanced Driver's License", or an unlamented official birth certificate.
6.2.4 Truck delivery personnel only need to show their Bill of Lading and show proof of US Citizenship (at the NBK Bangor Pass & ID Office) by having an original active US Passport, Enhanced Driver's License, or an unlamented official birth certificate. All deliveries must pass through the base Truck Inspection Station. All delivery vehicles are subject to inspection. Drivers should expect delays due to heightened security.
6.2.5 Contractor's vehicles requiring NBK Bangor Delta Pier/Waterfront Restricted Area access shall provide the following data to the Receiving Activity Point of Contact, who shall request a Strategic Weapons Facility, Pacific (SWFPAC) Delta Pier vehicle permit. These permits are issued by SWFPAC and are picked up (by the contractor) at the SWFPAC Pass & ID building (located next to the NBK Bangor Pass & ID Office, located outside Bangor’s Main Gate (Trident Boulevard)
* Company Name (must match the vehicle's registration):
* Vehicle Make:
* Vehicle Model:
* Vehicle Year:
* License Plate #:
* License Plate Issue State:
* Access Start/End Dates:
6.2.6 Notice: Persons who are currently on probation or parole from a felony conviction cannot qualify for security clearances, and will be denied access to the activity.
6.2.7 It shall be the Contractor's responsibility to collect, account for all identification passes issued to their personnel at the expiration of the contract or when access is no longer required. All NBK Bangor Pass & ID Office issued badges and identification passes must be returned back to the NBK Bangor Pass & ID Office no later than the expiration date.
6.2.8 Foreign Nationals or Affiliations - Foreign Nationals (non-U.S. Citizens) or persons affiliated with, or employed by, a foreign, or foreign owned company will not be granted access without proper NBK Bangor Commanding Officer's written approval. Please note that All NBK Bangor Command Foreign Nationals or Affiliations visit request must be submitted sixty (60) days prior to a requested visit date.
6.2.9 Identification. All Contractors shall clearly identify themselves as contactor personnel.
6.3 RESTRICTIONS:
6.3.1 Parking - Vehicles and equipment required by the Contractor to complete this contract must be registered with Security. Forms for obtaining vehicle passes and permits may be obtained from the Receiving Activity Point of Contact. Parking is available at or near the work site or at other authorized areas on the station. Contractor vehicles must be marked on the outside with the company name or logo or both. Failure to comply will result in ticketing and/or loss of vehicle privileges.
6.3.2 Regular Working Hours - All work is to be performed during TRF, Bangor's regular work hours from 6:30 a.m. to 3:00 p.m., Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturdays, Sundays, holidays, or outside the regular or specified hours/days, the Contractor shall submit a request to the Receiving Activity Point of Contact, for approval a minimum of two (2) working days prior to the anticipated work date. In no event shall a Contractor carry on work outside the hours and days specified in the contract without prior approval.
6.3.3 Restricted Colors - TRF, Bangor uses the colors magenta and yellow to identify specially controlled materials. The Contractor is specifically prohibited from using magenta and yellow colored plastic wrapping materials or bags, tape, or other covering materials.
6.3.4 Radio Restrictions - Operation of privately owned citizens band or amateur radio equipment (receive and transmit) within the geographic limits of the activity is prohibited. All radio equipment installed in privately owned motor vehicles must be turned off upon entering the premises.
6.3.5 Contractor Electronic Devices – Use of such devices, including cell phones, and computers shall not be capable of photography or digital recording by contractor personnel at TRF, Bangor can be restricted. This includes personally owned Portable Electronic Devices (PEDs) that are used for storing data, including but not limited to removable storage devices (e.g. memory sticks rewriteable CDs and DVDs, Zip and floppy disks). Contractors requiring such devices in the performance of this contract shall have the equipment inspected and approved by the TRF, Bangor site POCs. If this equipment is needed, it must comply with the photography regulations. Please contact Receiving Activity Point of Contact to make a request. Please allow at least 5 business days for required electronic devices to be approved.
6.3.6 Photography/Recording - Contractor personnel are prohibited from having personal reproduction equipment of any kind, including but not limited to photocopying, copying, and/or recording devices. This includes photographic equipment, tape recorders, or other recording devices in their possession while inside the Operations Area (OA). Contractors requiring the use of photographic equipment in TRF, Bangor spaces must request authorization through the TRF, Bangor security office. Please contact the Receiving Activity Point of Contact to make a request.
6.3.7 Prohibited Items - The items listed below are prohibited (and includes any other item, which the possession of is prohibited by Federal, State or municipal law, Department of Defense or Department of Navy instruction directive or policy).
6.3.7.1 Weapons or other dangerous materials of any kind, including by not limited to firearms, ammunition, knives (blades longer than 3-inches), explosives, incendiaries, personal defense aerosols/sprays.
6.3.7.2 Alcoholic Beverages of any kind and illegal to include marijuana.
7 PERSONAL HEALTH AND SAFETY
7.1 The Contractor shall provide their employees with all necessary safety equipment during the performance of work on this contract, and ensure their employees follow safe work practices. All contractor personnel shall have in their possession and shall properly wear OSHA approved personnel protective safety equipment (PPE) (i.e. hard-hats, safety shoes, safety glasses with permanently attached side shields, face protection and hearing protection; In addition, any special PPE required for the task or process, including the required training for the particular PPE).
The Contractor shall provide all appropriate safety barricades, signs, and signal lights required to properly isolate the area of work.
7.2 All Contractors shall clearly identify themselves as contactor personnel.
7.3 Medical Treatment. Government emergency vehicles and medical personnel shall only be used in emergency situations affecting contractor personnel whose life may be in danger or who are seriously injured.
Government facilities may be used in these instances as the first point of treatment. Transfer to a non-government medical treatment facility shall be made as soon as possible and as determined by attending medical authorities.
8 WORK SITE INFORMATION
8.1 Regular Working Hours/Shifts. Regular working hours is normally 8 hours (6:30 am to 3:00 pm), with a 30-minute lunch break, Monday through Friday. Working hour variations may be requested by contractor personnel, and approved by the Receiving Activity Point of Contact.
8.2 Holidays and Shutdown Periods. All shutdown periods, when directed by the Commanding Officer, are normally associated with holidays or inclement weather. Naval Base Kitsap policy is to continue operations during adverse weather.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .