Amendment_0005.pdf
PDF 88 KB Posted
- Attached to
- SPE7MX15R0053 Federal contract opportunity
- Solicitation number
- SPE7MX15R0053
About this file
Amendment 0005 to the solicitation
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE7MX 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE7MX15R0053
X
2015 APR 06
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).X
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA LAND AND MARITIME
SMSG DIV
PO BOX 3990
COLUMBUS OH 43218-3990
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
7/10/2015
3. EFFECTIVE DATE
Opening/Closing Date Changed to:
2015 APR 06 / 2015 JUL 24
TIME 1:00 PM
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUED ON NEXT PAGE
Amendment 0005 is issued to re-open solicitation SPE7MX-15-R-0053 to all offers through July 24, 2015 at 1:00 p.m. EST. PLEASE DISREGARD PAGE 7 OF THIS AMENDMENT. Due to system limitations, it could not be removed and does not apply to this amendment.
This amendment incorporates an updated item description as listed below.
PLEASE NOTE THE FOLLOWING IS THE OLD ITEM DESCRIPTION LISTED IN THE SOLICITATION THAT POSTED TO DIBBS:
FILTER ELEMENT, FLUID.
PERMANENT-TYPE SEPERATOR, 24 IN. NOM. LENGTH.
OUTSIDE TO INSIDE FLOW.
THIS NSN IS LISTED AS A PRIMARY QPL OR QML
THEREFORE THE QUALIFIED PRODUCTS LIST OR
QUALIFIED MANUFACTURERS LIST IS APPLICABLE.
CLASS I OZONE DEPLETINGCHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALLSPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVALUNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BEINTENTIONALLY ADDED TO,OR COME IN DIRECT
CONTACT WITH,ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONALMERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSISREAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF ANDCONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
IAW BASIC SPEC NRMIL-PRF-32148 NOT 1
REVISION NR DTD 10/02/2006
PART PIECE NUMBER:
IAW REFERENCE SPEC NR MIL-PRF-15618H
REVISION NR H DTD10/02/2006
PART PIECE NUMBER:
SHALL BE PACKAGED STANDARD COMMERCIAL IN ACCORDANCE WITH ASTM D 3951.
Markings Paragraph When ASTM D3951, Commercial Packaging isspecified, the following apply:
•,,All Section “D” Packaging and Marking Clauses take precedence over
ASTM D3951.
•,,In addition torequirements in MIL-STD-129, when Commercial Packaging is used, the Method of Preservation for all MIL-STD-129 marking and labeling shall be “CP” Commercial Pack.
•,,The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) as specified in the contract takeprecedence over QUP in ASTM D3951.
PLEASE NOTE THAT THE FOLLOWING IS THE NEW ITEM DESCRIPTION AS DESCRIBED EARLIER IN THIS AMENDMENT. THIS ITEM
PAGE 2 OF 7 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE7MX15R0053-0005
DESCRIPTION NOW APPLIES TO THE SOLICITATION.
NEW ITEM DESCRIPTION:
*** LTC PID Packaging Consolidated Text *** PLEASE SEE GLOSSARY AT THE END OF THE DOCUMENT FOR FULL TEXT OF THE ITEM DESCRIPTION
AND PACKAGING REFERENCE NUMBERS CALLED OUT FOR EACH NSN.
NSN:009733909
FILTER ELEMENT, FLUID.
24 IN. SEPERATOR ELEMENT OUTSIDE TO INSIDE FLOW
QPL APPROVED SOURCE:
PECOFACET CAGE 87405 AND 3R165, PN SS424Z IAW MIL-PRF-32148
REFERENCE NUMBER:ZD071
REFERENCE NUMBER:ZD025
REFERENCE NUMBER:CS046
REFERENCE NUMBER:CS187
CRITICAL APPLICATION ITEM
IAW BASIC SPEC NR MIL-PRF-32148 NOT 2
REVISION NR DTD 10/02/2006
PART PIECE NUMBER: 24 INCH SEPARATOR ELEMENT
PREP FOR DELIVERY
LINE ITEM 00001 TYPE OF COVERAGE: DLA DIRECT, CONUS
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP:001 PRES MTHD:31 CLNG/DRY:1 PRESV MAT:00
WRAP MAT:EA CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0
UNIT CONT:D3 OPI:O
INTRMDTE CONT:DO INTRMDTE CONT QTY:AAA
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:00 -00 No special marking
PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008
GLOSSARY
PAGE 3 OF 7 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PACKAGING TEXT
THE FOLLOWING PARAGRAPH APPLIES TO ALL PACKAGING CALLED OUT IN THIS DOCUMENT:
ITEM DESCRIPTION TEXT
REFERENCE NUMBER ZD071
Configuration Change Management - Engineering Change Proposal, Requests for Variance (Deviation or Waiver) February 2015
1. Requirements A. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for Configuration Control of material purchased under this contract.
B. Furnished item(s) shall conform to the approved configuration requirements/revision specified, unless a Pre-Production Request for Variance (deviation) or a Post-Production Request for Variance (waiver), is processed and approved as provided by Paragraph 3. in this Standard Text Object (STO). Hereafter, the term #Request for Variance (RFV)# will also include Requests for Deviations and Waivers.
2. The definitions from EIA-649-1 apply to items being procured under this solicitation/contract, with the following clarification of Deviation & Waiver:
A. Pre-Production RFV (previously known as deviation) requests permission to produce a product that does not conform to contract requirements/documentation for a limited amount of time and for specified effectivity. (A deviation differs from an engineering change in that an approved engineering change requires corresponding revision of the item's current approved configuration documentation, whereas a deviation does not.).
B. Post-Production RFV (previously known as waiver) requests approval of product found during manufacture, or after having been submitted for Government inspection or acceptance, that departs from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method.
3. Contractor responsibilities.
A. An Engineering Change Proposal (ECP) is used to make permanent changes in the Government technical data package (TDP). Pending approval of an ECP, contractual relief should be requested in writing by the Contractor using a RFV.
B. Refer to FAR Part 48 Value Engineering for cost saving improvements to the Technical Data Package (TDP).
C. All ECPs submitted by the Contractor will be deemed routine.
If the Contractor considers an ECP as an emergency or urgent; they shall include in their ECP submittal an explanation and all applicable supporting documentation. All ECPs will be reviewed for a determination on criticality, and, if concurred to be an emergency, the appropriate processing time-frame negotiated with the ESAs will be followed and the Contractor will be notified of anticipated response time.
D. For ECPs, Specification Change Notices (SCNs) or RFV, the Contractor must submit the applicable documentation listed in
PAGE 4 OF 7 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
sub-paragraphs D.(1) through D.(4)to the Administrative Contracting Officer(ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV without processing.
(1) Documentation listed in Paragraph 3.3.1 (for ECPs), 3.3.2 (RFV), 3.3.3 (for SCNs) or 3.3.4 (for Notices of Revision (NORs)) of the latest revision of EIA-649-1.
(2) DD Form 1692 (current revision) for ECP.
(3) DD Form 1694 (current revision) for RFV.
(4) DD Form 1695 (current revision) for NOR.
4. DLA#s responsibilities:
A. Upon receipt of the ECP or RFV, the PCO will ensure that the applicable product specialist receives the copy from DCMA.
B. Within five (5) working days from the date of receipt of the Contractor's ECP or RFV from DCMA, the PS must submit the requests and any supporting documentation via a 339 to the appropriate Engineering Support Activity (ESA), when applicable.
C. Routine ECPs will be processed within 90 days from receipt by the ESA. RFVs will be evaluated and processed within 30 days from receipt by the ESA or as negotiated with the ESA.
(1) The contractor will be notified in writing of approval by the return of an approved copy of the ECP or RFV. Approval will be reflected by signature of the contracting activity or a review activity specifically identified in the contract.
(2) The contractor will be notified in writing of disapproval including reason(s) for disapproval.
5. For an approved RFV or an approved ECP, when the request affects the Contract, a modification will be issued to the contract incorporating the applicable requirement changes. Only a Contracting Officer is authorized to issue a modification incorporating the approved RFV and/or
ECP.
6. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO.
7. The submission of an ECP or RFV by the Contractor does not affect the required delivery date of the contract. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract.
8. The period of time for evaluation and approval/disapproval of an ECP and/or a RFV, as specified in Paragraph 4. C., shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract. (End)
REFERENCE NUMBER ZD025
PAGE 5 OF 7 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO,OR COME IN DIRECT
CONTACT WITH,ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
REFERENCE NUMBER CS046
THIS NSN IS LISTED AS A PRIMARY QPL OR QML
THEREFORE THE QUALIFIED PRODUCTS LIST OR
QUALIFIED MANUFACTURERS LIST IS APPLICABLE.
REFERENCE NUMBER CS187
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
Please have a dully authorized representative complete blocks 15A, 15B, and 15C and return 1 with your offer to Brandi Scott at brandi.scott@dla.mil
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
PAGE 6 OF 7 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
SPE7MX-15-R-0053
SECTION E, I AND M
Clause Continuation
LINE
ITEM NSN
Clause 52-246-7000
PLACE OF
INSPECTION/
ACCEPTANCE
Clause 52.216-19(a)
Delivery Order
Minimum
Clause 52.216-19(b)
Delivery Order
Maximum
Clause 52.216.9009
Est Total Qty
Clause 52.216-
9010(a)(1) Contract Minimum
Clause 52.216-
9010(a)(2) Contract Maximum
Provision 52.213-2001 Estimated number of orders issued over entire term of contract
0001 4330-00-973-3909 Origin 342 1,026 5,480 $24,747.68 $3,093,460.00 20
Offered Materials and Unit Pricing
252.217-7026 OFFEROR FILL-IN Delivery Schedule (52.211-9069)
LINE
ITEM NSN
U ni t o f
Is su e CAGE
OFFERED
ITEM
OFFERED
STATE OF THE
PART #
ACTUAL
MFGR / CAGE
GOVERNMENT
REQUIRED
DELIVERY
DAYS
OFFERED
DELIVERY
DAYS
0001 4330-00-973-3909 EA ____________ _____________ _____________ 120 _____________
Offered Materials and Unit Pricing
LINE
ITEM NSN
Qty Range 1 1st Qty Break Price Qty Range 2 2nd Qty Break
Price Qty Range 3 3rd Qty Break Price Qty Range 4 4th Qty
Break Price
0001 4330-00-973-3909 342 to 684 __________ 685 to 2055 __________ 2056 to 3425 _________ 3426 to 16440 __________
PAGE 7 OF 7 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
| Word Bookmarks |
| B |
File details come from the government source that posted it. Updated .