About this file

This document is a justification for other than full and open competition for solicitation SPE7M8-21-R-0011 from the Defense Logistics Agency Land and Maritime. The solicitation is for switch, flow part number 5930-01-159-0437, which requires engineering source approval to maintain quality as the design data and manufacturing knowledge are held exclusively by Curtiss-Wright, Honeywell, and Ontic. These three sources are the only ones qualified by the design control activity to produce the item. The agency conducted market research including a sources sought notice on SAM.gov and a synopsis on FBO.gov to identify additional sources, but found none. The anticipated award date is August 31, 2021 through solicitation SPE7M821C0006. Price will be determined fair and reasonable without certified cost data due to the estimated contract value being under $2 million.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

SOLICITATION SPE7M8-21-R-0011

PR: 0088327386

NSN: 5930-01-159-0437

DLA Land & Maritime Justification for Other Than Full & Open Competition (Jan May 2018)

[X] AMC 3. Acquire, for the second or subsequent time, directly from the manufacturer.

The use of the authority cited is based on:

[X] AMSC C. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s). The approved source(s) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. If one source is approved, AMCs 3, 4, or 5 are valid. If at least two sources are approved or if data is adequate for an alternate source to qualify in accordance with the design control activity's procedures, AMCs 1 or 2 are valid.

March 1st, 2021, and has certified that the information provided is correct and accurate. The Product Specialist stated that the AM 3 C is correct. No drawings or data package are available to the Government, and

. -Wright (03972) and Ontic (45934) remains the only approved sources for this procurement at this time. Honeywell, Curtiss-Wright and Ontic are currently the only sources known to possess the requisite data to manufacture this item. These sources are approved by the design control activity. Any alternate source must qualify in accordance with the design control activity’s procedures, as approved by the cognizant government engineering activity.

Efforts to ensure that offers are solicited from as many sources as practicable are:

[X] A Sources Sought notice was posted on beta.SAM.gov 2021 for 7 days.

[X] The acquisition was synopsized on for 17 days. At the completion of the synopsis period, this PR will be solicited on the internet for 30 days via the DLA Internet Bid Board System (DIBBS).

t they are interested in thi nity as they are a distributor for Honeywell. I will provide them with a link to the solicitation once it is issued.

7. I hereby determine that the anticipated cost to the Government will be fair and reasonable.

Certified Cost or Pricing Data will not be required because the current estimated contract price is under the price threshold of $2,000,000 (FAR 15.403- Offerors may be required to provide additional information for determining reasonableness of price. The buyer only intends to award this NSN when a fair and reasonable price determination can be made. The Contracting Officer will conduct price analysis by reviewing historical pricing, usage of the Producer Price Index (PPI), and learning curve analysis. The acquisition specialist may ask for assistance from the DLA Land and Maritime pricing office if necessary. Negotiations may take place in an effort to comply with DoD Material Cost Reduction Initiative. An option quantity will not be used for this

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

SOLICITATION SPE7M8-21-R-0011

PR: 0088327386

NSN: 5930-01-159-0437

DLA Land & Maritime Justification for Other Than Full & Open Competition (Jan May 2018)

12. Prior J&A from Solicitation Number SPE7M8-17-R-003 is included in the stack for review.

I hereby certify that the information contained in this justification is accurate and complete to the best of my knowledge and belief. If not exceeding $750,000, this signature serves as the approval.

_________________________________________ May 13, 2021 Contracting Officer Date

APPROVAL/CERTIFICATION

I have reviewed and approve this justification:

Competition Advocate Signature Date

APPROVAL REQUIREMENTS

[ ] Up to $750,000 Contracting Officer

[X] $750,000 to $15,000,000 Competition Advocate

Attachments:

1. Product Specialist J&A E-mail response

2. Prior J&A – SPE7M8-17-R-

3. Past Procurement History

MAXWELL.BRIAN.ST

EPHEN.1230183828

Digitally signed by

MAXWELL.BRIAN.STEPHEN.12301

83828

Date: 2021.05.13 12:21:31 -04'00'

SHEARER.MARY.E.1250

702449

Digitally signed by

SHEARER.MARY.E.1250702449

Date: 2021.05.18 14:07:09 -04'00'

File details come from the government source that posted it. Updated .