SPE7M218Q0431.PDF
PDF 425 KB Posted
- Attached to
- LEVER, REMOTE CONTRO Federal contract opportunity
- Solicitation number
- SPE7M218Q0431
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
4. CERT.FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5. ISSUED BY
7. DELIVERY
9. DESTINATION
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5 ON OR
BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (See Continuation Sheets)
12. DISCOUNT FOR PROMPT PAYMENT
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
16. SIGNER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not useable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
1. REQUEST NO.
SPE7M2-18-Q-0431
2. DATE ISSUED
2018 SEP 24
3. REQUISITION/PURCHASE REQUEST NO.
0075125180
RATING
DO-C9
DLA LAND AND MARITIME
VALVES HARDWARE DIVISION
PO BOX 3990
COLUMBUS OH 43218-3990
USA
Buyer: Susan Lupo PMCMBB3 Tel: 614-692-1198 Fax: 614-692-6923 Email: Susan.Lupo@dla.mil
6. DELIVER BY (Date)
SEE SCHEDULE
8. TO:
c. CITY
d. STATE
b. STREET ADDRESS
a. NAME OF CONSIGNEE
e. ZIP CODE
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS
15. DATE OF QUOTATION
a. NAME (Type or Print)
AREA CODE
c. TITLE (Type or Print)d. CITY
c. COUNTY
b. STREET ADDRESS
e. STATE f. ZIP CODE
See Schedule
2018 OCT 05
NUMBER
FOB DESTINATION
OTHER
(See Schedule)
CAGE
b. TELEPHONE
See attached schedule to complete quote information.
Quoter must also complete the following:
a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .
b. Prices quoted are:
___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .
___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.
___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;
___ Customer ________________________.
___ Other (provide basis) ______________________________________ _______________________________________ .
c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .
d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.
e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:
f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 27 PAGES
SPE7M2-18-Q-0431
CONTINUED ON NEXT PAGE
*************PLEASE READ THE FOLLOWING CAREFULLY****************
*******NOTE TO CONTRACTORS********
****THIS IS AN AIRCRAFT LAUNCH RECOVERY EQUIPMENT (ALRE) ITEM****
****CRITICAL APPLICATION ITEM (CAI)****
NSN# 3040-00-239-7238
NOMENCLATURE LEVER, REMOTE CONTROL
NAVAIR PART NUMBER: 616971-1
FOB: ORIGIN
INSPECTION: ORIGIN
ACCEPTANCE: ORIGIN
TDR USED FOR THIS ALRE SOLICITATION IS 12-1211
*******************************NOTE************************************
PLEASE NOTE IN THE SOLICITATION THERE ARE ADDITIONAL LINE ITEMS BEGINNING WITH “S0…”. THESE LINES COINCIDE WITH THE “CONTRACT DATA REQUIREMENTS LIST” (CDRLS) FOUND IN THE TECH DOC BIDSET DOWNLOADABLE FROM DIBBS.
THE CDRLS WILL BECOME DELIVERABLES AT TIME OF AWARD AND WILL BE ATTACHED BY THE BUYER.
THE TECHNICAL DOCUMENTS FOR THIS SOLICITATION MUST BE DOWNLOADED AND REVIEWED PRIOR TO SUBMISSION OF QUOTES/OFFERS. A
POST AWARD SURVEY MAY BE REQUIRED FOR UNDERSTANDING OF THE REQUIREMENTS.
CLIN 0002 – S00000053 – CONTRACTOR FIRST ARTICLE TESTING (FAT) (CDRL)
CLIN 0003 – S00000046 – PRODUCTION TEST & INSPECTION REPORT (PTI) (CDRL)
CLIN 000 4 – S00000046 – CERTIFICATE OF QUALITY COMPLIANCE (COQC) (CDRL)
DLAD PROCUREMENT NOTES INCORPORATED BY REFERENCE
This solicitation incorporates one or more DLAD Procurement Notes by reference, with the same force and effect as if they were given in full text. The full text of a DLAD Procurement Note may be accessed electronically at http://www.
dla.mil/HQ/Acquisition/Offers/eProcurement.aspx and via 'References' on the DIBBS homepage.
(End of Text)
UCF SECTION E – FIRST ARTICLE – CONTRACTOR TESTING – DCMA DELEGATION
(1) Notice to Contractor: The Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) is delegated the authority to approve/disapprove the First Article Test Report submitted in accordance with the requirements in this contract. Any reference to the Contracting Officer as it relates to submission of and approval/ disapproval of the FAT Report shall be deemed to mean the DCMA ACO.
(2) Notice to ACO: The DCMA ACO shall forward a copy of the First Article Test Report and the DCMA ACO’s letter of approval/disapproval to the Contracting Officer at the buying activity and to the address identified in FAR Clause 52.209-3(b).
(End of Text)
UCF SECTION E – NOTE TO CONTRACTOR FOR INSPECTION – ALRE
Because of the critical nature of this material, a representative of the Naval Air Warfare Center (NAWC) Lakehurst is available to furnish technical assistance on Quality Assurance (QA) matters and shall have the option of conducting QA surveillance for the first lot produced under this contract (and subsequent lots if necessary).
This requirement will be performed in conjunction with the Quality Assurance Representative (QAR) of the cognizant Defense Contract Management Agency (DCMA) Contract Management Office and does not abrogate the authority of responsibility of the DCMA QAR. The Contractor agrees to notify, in writing, the supervisor of the Quality Assurance (QA) Section, Code 4.8.8.8, Lakehurst NJ 08733-5025, when the material is scheduled to be presented to the DCMA QAR for Government inspection and acceptance.
This notice shall afford the NAWC Lakehurst QA Representative the option of being present during the inspection.
Notification may be provided via telephone (732) 323-2834 immediately followed by written confirmation, or via facsimile transmission to (732) 323-1381. A minimum of fourteen (14) working days after receipt of notification is required to arrange such a visit.
Note: Advise the Procuring Contracting Officer (PCO) listed in the order by facsimile or email at the same time notice is given to NAWC Lakehurst.
(End of Text)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 27 PAGES
NAVAIR finds the following quality programs acceptable to meeting the requirement of FAR Higher Level Quality clause 52.246-11:
ISO9000:1994
ISO9001:2000
ISO9001:2008
ISO9001:2008 Tailored
ISO9001:2015
AQS AC7004
AS9003
AS9100
MIL-I-45208
MIL-Q-9858 and equivalent
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 27 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLIES/SERVICES: 3040-00-239-7238
ITEM DESCRIPTION:
CRANK ASSEMBLY.
82N ALRE CAI
THE FOLLOWING DRAWINGS/DOCUMENTS APPLY TO THIS NSN:
DWG 616971(REV T)
DWG-CN002397238
SQAP002397238CFAT
SQAP002397238QA
CDRL-15-12111
REF DOC# TDR-15-12111
ITEM NOTE: DIMENSIONS ON DRAWING ARE TO BE MET PRIOR TO FINISHING THE
PART IN CCORDANCE WITH MPR 1222. AS PER THE DRAWING AND MPR 1222, NO
FINISHING SHALL BE APPLIED ON KEYWAYS, BEARING AREAS, OR ANY SURFACES
CALLED OUT ON NAVAIR DWG 616971.
SERIALIZATION: Serialization is required for this ALRE CAI part as well as the packaging for traceability. Contractor technical documentation shall reflect the appropriate marking scheme. All serialized and lot numbered CAI parts shall be accounted for; to include material scrapped during manufacturing. Re-branding by suppliers which obscures the original marking (part number, serial number, CAGE) of the OEM of ALRE CAI parts is prohibited.
Please notify DLA Contracting Officer at time of quote if serialization is not practical due to size, material property, unreasonable or excessive cost.
RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR
SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON
REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
The following Contract Data Requirements Lists (CDRLs), DD Form 1423s, apply to this procurement. Review the Technical Data Package (TDP) for additional information.
-First Article Testing Report -Production Test and Inspection Report -Certificate of Quality Compliance If this NSN provides Contract Data Requirement Lists (CDRLs) as part of the Technical Data Package, the line items from this solicitation are not to be separately priced. Offerors must factor into the end item unit price all costs associated with the preparation and delivery of the data deliverables in the contract.
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 27 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 3040-00-239-7238 CONT'D
NON-MANUFACTURERS)
ISO9000:1994, ISO9001:2000, ISO9001:2008, ISO9001:2015, AQS AC7004,
AS9003, AS9100, MIL-I-45208, MIL-Q-9858 and equivalent are acceptable Quality Management Programs for NAVAIR/NAVSUP ALRE TDR approved sources.
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND
REQUIRES ENGINEERING SOURCE APPROVAL BY THE
GOVERNMENT DESIGN CONTROL ACTIVITY.
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
THIS MATERIAL MUST MEET NAVAIR AIRCRAFT LAUNCH &
RECOVERY EQUIPMENT TRACEABILITY REQUIREMENTS. BARE
ITEM MARKINGS SHALL BE IAW THE TECHNICAL DATA
DRAWINGS PROVIDED.
BARE ITEM MATERIAL SHALL BE MARKED WITH CONTRACT
NUMBER, NAWC CAGE, AND PART NUMBER UNLESS OTHERWISE
SPECIFICIED ON ASSOCIATED DRAWING. IF A CONFLICT
EXISTS WITH MARKING REQUIREMENTS OF THIS 82N ALRE/SE
ITEM, THE ASSOCIATED DRAWING REQUIREMENTS SHALL APPLY.
BARE ITEM MARKINGS SHALL BE WITH NAWC CAGE (80020) AND NAWC PART NUMBER
(####) AND CONTRACT #.
IF THE ITEMS DO NOT MEET THESE BARE MARKING REQUIREMENTS, THEY ARE NOT
ACCEPTABLE.
THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO
EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA AND
ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED THROUGH
JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE DEPARTMENTS OF
STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO INTERNATIONAL
AGREEMENTS.
TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, MILITARY CRITICAL
TECHNICAL DATA AGREEMENT, FORM IS AVAILABLE AT THE WORLD WIDE WEB
ADDRESS:
https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/defaul t.aspx
OR BY WRITING TO:
DLA LOGISTICS INFORMATION SERVICE
FEDERAL CENTER
74 WASHINGTON AVE., NORTH
BATTLE CREEK, MI 49037-3084
TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A
CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT,
DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY
THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN
EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 EXEMPTIONS OF
GENERAL APPLICABILITY, AND/OR EAR PART 740 ARE APPLICABLE.
NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL DATA ARE
REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN APPLICABLE AGREEMENT
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 27 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 3040-00-239-7238 CONT'D
OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO RECEIVE A COPY OF THE
EXPORT CONTROLLED TECHNICAL DATA.
NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO
THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA
UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY
PERMITTED BY DODD 5230.25.
JCP applies to all manufactures, dealers, distributors, or suppliers.
The Government Procuring Activity has determined that Surplus is not Acceptable for this NSN.
(End of TQ Requirement)
AIRCRAFT LAUNCH AND RECOVERY EQUIPMENT (ALRE) CRITICAL APPLICATION ITEM
SOURCE APPROVAL - TO BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION, AN
OFFEROR MUST BE AN APPROVED SOURCE OR PROVIDE THE PRODUCT OF AN APPROVED
SOURCE AS DETERMINED BY THE ENGINEERING SUPPORT ACTIVITY, NAVAL AIR
WARFARE CENTER (NAWC) AIRCRAFT DIVISION LAKEHURST. THE CRITERIA AND
PROCEDURES FOR SOURCE APPROVAL ARE CONTAINED IN PART I OF THE NAVAL
INVENTORY CONTROL POINT (NAVICP) PHILADELPHIA BROCHURE ENTITLED "SOURCE
APPROVAL INFORMATION BROCHURE FOR SPARES". THE LATEST VERSION OF THIS
BROCHURE MAY BE OBTAINED BY ACCESSING NAVICP'S WEBSITE:
HTTPS://WWW.NAVSUP.NAVY.MIL, OUR TEAM, NAVICP, BUSINESS OPPORTUNITIES,
COMMODITIES, SOURCE APPROVAL REQUEST (SAR) BROCHURE SPARES
TO ASSIST IN THE DETERMINATION OF SOURCE APPROVAL, THE OFFEROR MAY BE
REQUIRED TO SUBMIT TO A SURVEY PRIOR TO AWARD IN WHICH NAWC LAKEHURST
MAY PARTICIPATE.
IN ADDITION, THE OFFEROR MUST PROVIDE THE FOLLOWING INFORMATION, WHICH
MAY BE CONSIDERED IN DETERMINING WHETHER THE OFFEROR IS AN APPROVED
SOURCE:
(1) A SOURCE APPROVAL LETTER FROM NAVICP'S ENGINEERING AND PRODUCT
SUPPORT DIRECTORATE; OR;
(2) OTHER EVIDENCE INDICATING THAT THE OFFEROR MEETS THE SOURCE APPROVAL
CRITERIA.
ALL REQUESTS FOR WAIVERS OR DEVIATIONS CLASSIFIED AS CRITICAL, MAJOR, OR
MINOR MUST BE FORWARDED TO THE DSC CONTRACTING OFFICER FOR REVIEW AND
APPROVAL.
ALL ITEMS OF SUPPLY SHALL BE MARKED IAW MIL-STD-129. IN ADDITION, EACH
UNIT PACK WILL BE MARKED WITH LOT AND SERIAL NUMBER (IF AVAILABLE),
CONTRACTOR'S CAGE CODE, ACTUAL MANUFACTURER'S CAGE CODE AND PART NUMBER.
(February 2016)
IUID not required: Exempted by Military Services.
CRITICAL APPLICATION ITEM
Precision Custom Components, LLC 1P555 P/N 616971-1 Hamill Manufacturing Company DBA 17661 P/N 616971-1 Entwistle Company, The 20722 P/N 616971-1
PENN STATE TOOL DIE CORPORATION 58974 P/N 616971-1
LEE PRECISION MACHINE SHOP, INC. 9N498 P/N 616971-1
IAW REFERENCE DRAWING NR 80020 MPR26
REVISION NR A DTD 09/19/2006
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 80020 MPR1223
REVISION NR B DTD 11/25/1991
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 80020 MPR1222
REVISION NR DTD 09/22/2006
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 80020 616971
REVISION NR T DTD 06/03/2014
PART PIECE NUMBER: 616971-1
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 27 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 3040-00-239-7238 CONT'D
IAW REFERENCE DRAWING NR 16236 CN002397238
REVISION NR DTD 12/17/2015
PART PIECE NUMBER:
IAW REFERENCE QAP 16236 SQAP002397238CFAT
REVISION NR DTD 12/17/2015
PART PIECE NUMBER:
IAW REFERENCE QAP 16236 SQAP002397238QA
REVISION NR DTD 12/23/2015
PART PIECE NUMBER:
IAW REFERENCE QAP 80020 CDRL-15-12111
REVISION NR DTD 11/09/2015
PART PIECE NUMBER:
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 3040-00-239-7238 32.000 EA $ ________________ $ ________________
LEVER,REMOTE
CONTRO
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: ORIGIN DELIVERY DATE: 515 DAYS ADO
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP:001 PRES MTHD:20 CLNG/DRY:1 PRESV MAT:02
WRAP MAT:GC CUSH/DUNN MAT:AD CUSH/DUNN THKNESS:K
UNIT CONT:FK OPI:M
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008
EACH UNIT PACKAGE WILL BE MARKED WITH THE NSN,
CONTRACT NUMBER, LOT NUMBER, CONTRACTOR CAGE
CODE, MANUFACTURER CAGE CODE, AND PART NUMBER.
PARCEL POST ADDRESS:
SW3117
DLA DISTRIBUTION NORFOLK VA
RECEIVING OFFICER DDNV P
1968 GILBERT ST BLDG W143 DWY 9
NORFOLK VA 23511-0001
US
FOR TRANSPORTATION ASSISTANCE SEE DLAD 52.247-9034. FOR FIRST DESTINATION TRANSPORTATION (FDT) AWARDS SEE DLAD
52.247-9059 AND CONTRACT INSTRUCTIONS INSTEAD.
FREIGHT SHIPPING ADDRESS:
SW3117
DLA DISTRIBUTION NORFOLK VA
RECEIVING OFFICER DDNV P
1968 GILBERT ST BLDG W143 DWY 17
NORFOLK VA 23511-0001
US
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 27 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 0001-S00000053 CONT'D
Contractor First Article Test Contractor First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-3 for the actual quantity required to be tested.
0002 0001 - S00000053 1.000 EA $ ________________ $ ________________
FOB: DELIVERY DATE: 200 DAYS ADO
PREP FOR DELIVERY:
Not Applicable
Miscellaneous
0003 0001 - S00000046 1.000 EA $ ________________ $ ________________
ACCEPTANCE POINT: ORIGIN
FOB: ORIGIN DELIVERY DATE: 515 DAYS ADO
Miscellaneous
0004 0001 - S00000046 1.000 EA $ ________________ $ ________________
ACCEPTANCE POINT: ORIGIN
FOB: ORIGIN DELIVERY DATE: 515 DAYS ADO
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 0075125180 0001 N/A N/A N/A 11/25/2019
0002 N/A N/A N/A N/A N/A N/A
0003 N/A N/A N/A N/A 9999 N/A
0004 N/A N/A N/A N/A 9999 N/A
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 27 PAGES
SECTION A - SOLICITATION/CONTRACT FORM
TECHNICAL REQUIREMENTS
THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN `R' OR AN `I' NUMBER IN SECTION B) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE
WEB AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-
ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016) FAR
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (SEP 2016)
C16 FIRST DESTINATION TRANSPORTATION PROGRAM, GOVERNMENT ARRANGED TRANSPORTATION FOR MANUAL AWARDS
(AUG 2017)
SECTION D - PACKAGING AND MARKING
252.211-7006 PASSIVE RADIO FREQUENCY IDENTIFICATION (JUN 2016) DFARS
As prescribed in 211.275-3, use the following clause:
(a) Definitions. As used in this clause --
“Advance shipment notice” means an electronic notification used to list the contents of a shipment of goods as well as additional information relating to the shipment, such as passive radio frequency identification (RFID) or item unique identification (IUID) information, order information, product description, physical characteristics, type of packaging, marking, carrier information, and configuration of goods within the transportation equipment.
“Bulk commodities” means the following commodities, when shipped in rail tank cars, tanker trucks, trailers, other bulk wheeled conveyances, or pipelines:
(1) Sand.
(2) Gravel.
(3) Bulk liquids (water, chemicals, or petroleum products).
(4) Ready-mix concrete or similar construction materials.
(5) Coal or combustibles such as firewood.
(6) Agricultural products such as seeds, grains, or animal feed.
“Case” means either a MIL-STD-129 defined exterior container within a palletized unit load or a MIL-STD-129 defined individual shipping container.
“Electronic Product Code™ (EPC)” means an identification scheme for universally identifying physical objects via RFID tags and other means.
The standardized EPC data consists of an EPC (or EPC identifier) that uniquely identifies an individual object, as well as an optional filter value when judged to be necessary to enable effective and efficient reading of the EPC tags. In addition to this standardized data, certain classes of EPC tags will allow user-defined data. The EPC Tag Data Standards will define the length and position of this data, without defining its content.
“EPCglobal®” means a subscriber-driven organization comprised of industry leaders and organizations focused on creating global standards for the adoption of passive RFID technology.
“Exterior container” means a MIL-STD-129 defined container, bundle, or assembly that is sufficient by reason of material, design, and file:///C:/Users/RJ30041/AppData/Local/Temp/
Temp2_dfars_html%20(1).zip/dfars_html/211_2.htm
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 27 PAGES
SECTION D - PACKAGING AND MARKING (CONTINUED)
CONTINUED ON NEXT PAGE
construction to protect unit packs and intermediate containers and their contents during shipment and storage. It can be a unit pack or a container with a combination of unit packs or intermediate containers. An exterior container may or may not be used as a shipping container.
“Palletized unit load” means a MIL-STD-129 defined quantity of items, packed or unpacked, arranged on a pallet in a specified manner and secured, strapped, or fastened on the pallet so that the whole palletized load is handled as a single unit. A palletized or skidded load is not considered to be a shipping container. A loaded 463L System pallet is not considered to be a palletized unit load. Refer to the Defense Transportation Regulation, DoD 4500.9-R, Part II, Chapter 203, for marking of 463L System pallets.
“Passive RFID tag” means a tag that reflects energy from the reader/interrogator or that receives and temporarily stores a small amount of energy from the reader/interrogator signal in order to generate the tag response. The only acceptable tags are EPC Class 1 passive RFID tags that meet the EPCglobal™ Class 1 Generation 2 standard.
“Radio frequency identification (RFID)” means an automatic identification and data capture technology comprising one or more reader/ interrogators and one or more radio frequency transponders in which data transfer is achieved by means of suitably modulated inductive or radiating electromagnetic carriers.
“Shipping container” means a MIL-STD-129 defined exterior container that meets carrier regulations and is of sufficient strength, by reason of material, design, and construction, to be shipped safely without further packing (e.g., wooden boxes or crates, fiber and metal drums, and corrugated and solid fiberboard boxes).
(b)(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall affix passive RFID tags, at the case- and palletized-unit-load packaging levels, for shipments of items that --
(i) Are in any of the following classes of supply, as defined in DoD 4140.1-R, DoD Supply Chain Materiel Management Regulation, AP1.1.11:
(A) Subclass of Class I - Packaged operational rations.
(B) Class II - Clothing, individual equipment, tentage, organizational tool kits, hand tools, and administrative and housekeeping supplies and equipment.
(C) Class IIIP - Packaged petroleum, lubricants, oils, preservatives, chemicals, and additives.
(D) Class IV - Construction and barrier materials.
(E) Class VI - Personal demand items (non-military sales items).
(F) Subclass of Class VIII - Medical materials (excluding pharmaceuticals, biologicals, and reagents - suppliers should limit the mixing of excluded and non-excluded materials).
(G) Class IX - Repair parts and components including kits, assemblies and subassemblies, reparable and consumable items required for maintenance support of all equipment, excluding medical-peculiar repair parts; and
(ii) Are being shipped to one of the locations listed at http://www.acq.osd.mil/log/sci/RFID_ship-to_locations.html or to --
(A) A location outside the contiguous United States when the shipment has been assigned Transportation Priority 1, or to --
(B) The following location(s) deemed necessary by the requiring activity:
Contract Line, Subline, or Exhibit Line Item Number Location Name City State DoDAAC
(2) The following are excluded from the requirements of paragraph (b)(1) of this clause:
(i) Shipments of bulk commodities.
(ii) Shipments to locations other than Defense Distribution Depots when the contract includes the clause at FAR 52.213-1, Fast Payment Procedures.
(c) The Contractor shall --
(1) Ensure that the data encoded on each passive RFID tag are globally unique (i.e., the tag ID is never repeated across two or more RFID tags and conforms to the requirements in paragraph (d) of this clause;
(2) Use passive tags that are readable; and http://www.acq.osd.mil/log/sci/RFID_ship-to_locations.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 27 PAGES
SECTION D - PACKAGING AND MARKING (CONTINUED)
CONTINUED ON NEXT PAGE
(3) Ensure that the passive tag is affixed at the appropriate location on the specific level of packaging, in accordance with MIL-STD-129 (Section 4.9.2) tag placement specifications.
(d) Data syntax and standards. The Contractor shall encode an approved RFID tag using the instructions provided in the EPC™ Tag Data Standards in effect at the time of contract award. The EPC™ Tag Data Standards are available at http://www.epcglobalinc.org/standards/.
(1) If the Contractor is an EPCglobal™ subscriber and possesses a unique EPC™ company prefix, the Contractor may use any of the identifiers and encoding instructions described in the most recent EPC™ Tag Data Standards document to encode tags.
(2) If the Contractor chooses to employ the DoD identifier, the Contractor shall use its previously assigned Commercial and Government Entity (CAGE) code and shall encode the tags in accordance with the tag identifier details located in the DoD Suppliers' Passive RFID Information Guide at http://www.acq.osd.mil/log/sci/ait.html. If the Contractor uses a third-party packaging house to encode its tags, the CAGE code of the third-party packaging house is acceptable.
(3) Regardless of the selected encoding scheme, the Contractor with which the Department holds the contract is responsible for ensuring that the tag ID encoded on each passive RFID tag is globally unique, per the requirements in paragraph (c)(1).
(e) Advance shipment notice. The Contractor shall use Wide Area WorkFlow (WAWF), as required by DFARS 252.232-7003, Electronic Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph (d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/.
(End of clause)
SECTION E - INSPECTION AND ACCEPTANCE
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) FAR
As prescribed in 46.311, insert the following clause:
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring
SEE REMARKS PROVIDE QUALITY
SYSTEM
TO THE BUYER
[Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.
(End of Clause)
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008) DFARS
E05 PRODUCT VERIFICATION TESTING (JUN 2018)
(1) Product verification testing (PVT) may be invoked at contract award or after contract award. If PVT is invoked at contract award, the contract will explicitly state this testing requirement and a QALI will be generated. If PVT is invoked after contract award, a QALI will be created and the DCMA quality assurance representative (QAR) will notify the contractor that testing will be performed. The PVT testing will be performed at a Government-designated testing laboratory.
(a) The contractor shall not ship or deliver any material unless directed to do so in writing by the contracting officer or until notified of http://www.epcglobalinc.org/standards/ http://www.acq.osd.mil/log/sci/ait.html file:///C:/Users/RJ30041/AppData/Local/Temp/
Temp2_dfars_html%20(1).zip/dfars_html/252232.htm https://wawf.eb.mil/ http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/46.htm
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 27 PAGES
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
CONTINUED ON NEXT PAGE
acceptable PVT results.
(b) PVT results will be provided in 20 working days after receipt at the Government testing facility, unless otherwise specified in writing by the Government.
(2) The QAR will select a random sample from the contractor's production lot. Selected PVT samples are to be shipped by the contractor with a copy of the Department of Defense DD Form 250 and the completed DD Form 1222. The packaging will be marked “Product Verification Test Samples, Contract number , lot/item number ."
(3) Test results will indicate one of the following:
(a) Samples that pass testing and are not destroyed during evaluation will be returned to the contractor at the Government's expense and will be included as part of the total contract quantity. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. Samples that pass testing and are not returned to the contractor will be considered part of the contract quantity for payment and delivery. The contractor will deliver the remaining lot quantity minus sample units.
(b) If samples fail testing, such failure will result in rejection of the entire contract lot from which the samples were taken. At the Government's discretion, parts failing any test criteria may be retained and not be returned to the contractor.
E06 INSPECTION AND ACCEPTANCE AT SOURCE (JUN 2018)
Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.
The contractor shall indicate the location where supplies will be inspected, if different from the production location:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line item numbers(s) (CLIN(s)):
The contractor shall indicate the location where packaging will be inspected, if different from the production location:
[ ] Same as for supplies OR
CAGE code:
Address:
Applicable to CLIN(s):
The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line item numbers(s) (CLIN(s)):
SECTION F - DELIVERIES OR PERFORMANCE
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989) FAR
52.242-15 STOP-WORK ORDER (AUG 1989) FAR
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H03 SUPPLEMENTAL FIRST ARTICLE TESTING REQUIREMENTS (SEP 2016)
252.223-7001 HAZARD WARNING LABELS (DEC 1991) DFARS
(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labelled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 27 PAGES
SECTION H - SPECIAL CONTRACT REQUIREMENTS (CONTINUED)
CONTINUED ON NEXT PAGE
Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.
MATERIAL (If None, Insert “None”)
ACT
SECTION I - CONTRACT CLAUSES
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
FAR
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (OCT 2016) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013) DFARS
252.203-7995 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS (NOV 2016) DFARS
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016) FAR
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016) FAR
52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (OCT 2016) FAR
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016) FAR
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) FAR
52.204-20 PREDECESSOR OF OFFEROR (JUL 2016) FAR
As prescribed in 4.1804(d), insert the following provision:
(a) Definitions. As used in this provision -
“Commercial and Government Entity (CAGE) code” means -
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.
“Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%204_18.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 27 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
(b) The Offeror represents that it [ ] is or [ ] is not a successor to a predecessor that held a Federal contract or grant within the last three years.
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code:
Predecessor legal name:
(Do not use a “doing business as” name)
(End of provision)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY
KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018) FAR
As prescribed in 4.2004, insert the following clause:
(a) Definitions. As used in this clause --
Covered article means any hardware, software, or service that --
(1) Is developed or provided by a covered entity;
(2) Includes any hardware, software, or service developed or provided in whole or in part by a covered entity; or
(3) Contains components using any hardware or software developed in whole or in part by a covered entity.
Covered entity means --
(1) Kaspersky Lab;
(2) Any successor entity to Kaspersky Lab;
(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or
(4) Any entity of which Kaspersky Lab has a majority ownership.
(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits Government use of any covered article. The Contractor is prohibited from --
(1) Providing any covered article that the Government will use on or after October 1, 2018; and
(2) Using any covered article on or after October 1, 2018, in the development of data or deliverables first produced in the performance of the contract.
(c) Reporting requirement. (1) In the event the Contractor identifies a covered article provided to the Government during contract performance, or the Contractor is notified of such by a subcontractor at any tier or any other source, the Contractor shall report, in writing, to the Contracting Officer or, in the case of the Department of Defense, to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (c)(1) of this clause:
(i) Within 1 business day from the date of such identification or notification: The contract number; the order number(s), if applicable;
supplier name; brand; model number (Original Equipment Manufacturer (OEM) number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the report pursuant to paragraph (c)(1) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of a covered article, any reasons that led to the use or submission of the covered article, and any additional efforts that will be incorporated to prevent future use or submission of covered articles.
(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts, including subcontracts for the acquisition of commercial items.
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS
252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR REPORTED CYBER INCIDENT
INFORMATION (OCT 2016) DFARS
https://dibnet.dod.mil https://dibnet.dod.mil
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 27 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016) DFARS
52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (SEP 1989) FAR
As prescribed in 9.308-1(a) and (b), insert the following clause:
[Contracting Officer shall insert details]
(a) The Contractor shall test 1 unit(s) of Lot/Item as specified in this contract. At least 10 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 200 calendar days from the date of this contract to DLA MARITIME
FMSE ATT: JOHN STOVER P.O. BOX 3990 COLUMBUS, OHIO 43218 maritime.fat.monitor@dla.mil and john.stover@DLA.mil [insert address of the Government activity to receive the report] marked “First Article Test Report: Contract No. , Lot/Item No. ” Within 60 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval.
The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The
Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (SEP 1989), ALT I (JAN 1997) FAR https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%209_3.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 16 OF 27 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR SUSPENSION (OCT 2015) FAR
52.211-5 MATERIAL REQUIREMENTS (AUG 2000) FAR
252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS (NOV 2005) DFARS As prescribed in 211.273-4, use the following clause:
(a) Definition. “SPI process,” as used in this clause, means a management or manufacturing process that has been accepted previously by the Department of Defense under the Single Process Initiative (SPI) for use in lieu of a specific military or Federal specification or standard at specific facilities. Under SPI, these processes are reviewed and accepted by a Management Council, which includes representatives of the Contractor, the Defense Contract Management Agency, the Defense Contract Audit Agency, and the military departments.
(b) Offerors are encouraged to propose SPI processes in lieu of military or Federal specifications and standards cited in the solicitation. A listing of SPI processes accepted at specific facilities is available via the Internet at http://guidebook.dcma.mil/20/guidebook_process.htm (paragraph 4.2).
(c) An offeror proposing to use an SPI process in lieu of military or Federal specifications or standards cited in the solicitation shall
(1) Identify the specific military or Federal specification or standard for which the SPI process has been accepted;
(2) Identify each facility at which the offeror proposes to use the specific SPI process in lieu of military or Federal specifications or standards cited in the solicitation;
(3) Identify the contract line items, subline items, components, or elements affected by the SPI process; and
(4) If the proposed SPI process has been accepted at the facility at which it is proposed for use, but is not yet listed at the Internet site specified in paragraph (b) of this clause, submit documentation of Department of Defense acceptance of the SPI process.
(d) Absent a determination that an SPI process is not acceptable for this procurement, the Contractor shall use the following SPI processes in lieu of military or Federal specifications or standards:
(Offeror insert information for each SPI process)
SPI Process:
Facility:
Military or Federal Specification or Standard:
Affected Contract Line Item Number, Subline Item Number, Component, or Element:
(e) If a prospective offeror wishes to obtain, prior to the time specified for receipt of offers, verification that an SPI process is an acceptable replacement for military or Federal specifications or standards required by the solicitation, the prospective offeror
(1) May submit the information required by paragraph (d) of this clause to the Contracting Officer prior to submission of an offer; but
(2) Must submit the information to the Contracting Officer at least 10 working days prior to the date specified for receipt of offers.
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997) FAR
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) FAR
52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) FAR
As prescribed in 19.309(c), insert the following clause:
(a) Definitions. As used in this clause.
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2019_3.html https://www.acquisition.gov/sites/default/files/current/far/html/52_217_221.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 17 OF 27 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts.
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.