SPE7M218Q0230.PDF
PDF 466 KB Posted
- Attached to
- NUT, UNION Federal contract opportunity
- Solicitation number
- SPE7M218Q0230
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
4. CERT.FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5. ISSUED BY
7. DELIVERY
9. DESTINATION
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5 ON OR
BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (See Continuation Sheets)
12. DISCOUNT FOR PROMPT PAYMENT
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
16. SIGNER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not useable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
1. REQUEST NO.
SPE7M2-18-Q-0230
2. DATE ISSUED
2018 MAY 17
3. REQUISITION/PURCHASE REQUEST NO.
0074384473
RATING
DO-C9
DLA LAND AND MARITIME
VALVES HARDWARE DIVISION
PO BOX 3990
COLUMBUS OH 43218-3990
USA
Buyer: Kyle Barr PMCMBBZ Tel: 614-692-1243 Fax: 614-692-6923 Email: Kyle.Barr@dla.mil
6. DELIVER BY (Date)
SEE SCHEDULE
8. TO:
c. CITY
d. STATE
b. STREET ADDRESS
a. NAME OF CONSIGNEE
e. ZIP CODE
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS
15. DATE OF QUOTATION
a. NAME (Type or Print)
AREA CODE
c. TITLE (Type or Print)d. CITY
c. COUNTY
b. STREET ADDRESS
e. STATE f. ZIP CODE
See Schedule
2018 MAY 24
NUMBER
FOB DESTINATION
OTHER
(See Schedule)
CAGE
b. TELEPHONE
See attached schedule to complete quote information.
Quoter must also complete the following:
a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .
b. Prices quoted are:
___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .
___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.
___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;
___ Customer ________________________.
___ Other (provide basis) ______________________________________ _______________________________________ .
c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .
d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.
e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:
f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 32 PAGES
SPE7M2-18-Q-0230
CONTINUED ON NEXT PAGE
*************PLEASE READ THE FOLLOWING CAREFULLY****************
****THIS IS AN ALRE CRITICAL SAFETY ITEM (CSI)****
AIRCRAFT LAUNCH AND RECOVERY EQUIPMENT
NSN# 4730-01-437-5301
PART NUMBER: 524433-8
IN SUPPORT AND PREPARATION OF THIS SOLICITATION FOR THIS ALRE ITEM, TDR NO. 17-12151 WAS USED.
*******************************NOTE*************************************
PLEASE NOTE IN THE SOLICITATION THERE ARE ADDITIONAL LINE ITEMS BEGINNING WITH “S0…”. THESE LINES COINCIDE WITH THE “CONTRACT DATA REQUIREMENTS LIST” (CDRLS) FOUND IN THE TECH DOC BIDSET DOWNLOADABLE FROM DIBBS.
THE CDRLS WILL BECOME DELIVERABLES AT TIME OF AWARD AND WILL BE ATTACHED BY THE BUYER.
THE TECHNICAL DOCUMENTS FOR THIS SOLICITATION MUST BE DOWNLOADED AND REVIEWED PRIOR TO SUBMISSION OF QUOTES/OFFERS.
IT IS MANDATED BY THE NAVY THAT A POST AWARD CONFERENCE BE HELD WITH NAVAIR, THE POST AWARD CONTRACTING OFFICER AND THE AWARDEE. THE CONFERENCE IS HELD TO CLARIFY THE REQUIREMENTS OF THE RESULTING CONTRACT.
CLIN 0002 – S00000052 – GOVERNMENT FIRST ARTICLE TESTING (FAT) (CDRL)
CLIN 0003 – S00000046 – PRODUCTION TEST & INSPECTION REPORT (PTI) (CDRL)
CLIN 0004 – S00000046 – CERTIFICATE OF QUALITY COMPLIANCE (COQC) (CDRL)
FIRST ARTICLE TESTING: GOVERNMENT
FOB POINT: DESTINATION
INSPECTION AND ACCEPTANCE POINT:
1. Preliminary Inspection Point: SOURCE
2. Acceptance Point: DESTINATION
RECEIPT CERTIFICATION INSPECTION (Material Receipt Inspection – MRI):
***P/N: 524433-8: Part shall be Receipt inspected and certified at Lakehurst
Contractor shall provide tracking information of the shipment for the final production quantity shipped to NAVAIR Lakehurst to the PCO so receipt can be verified.
After inspection and acceptance of material at Lakehurst, the material will be shipped to the DLA stock location.
Lakehurst will be responsible for the shipment of the material to the DLA depot location.
Traceability to Approved Sources listed in this solicitation and authorized OEM distributor designation is required on all CSI purchases.
Sources that are not approved for this NSN are required to submit a Full Source Approval Request (SAR) to DSCC by the closing date of this solicitation. The data package will be submitted to the Source Approval Authority and they will determine if the source is acceptable. $200 Local Evaluation Cost and $1,500 ESA Evaluation cost added to alternate offers before submission of data package is considered. Due to criticality and time required for ESA evaluation of alternate offers, it may not be possible to consider alternate offers for current award, but those meeting evaluation criteria will be considered for future procurements if approved by ESA after SAR evaluation.
-COC IS NOT AUTHORIZED FOR CSI ALRE ITEMS
-GOVERNMENT SURPLUS IS NOT ACCEPTABLE FOR CSI ALRE ITEMS
DLAD PROCUREMENT NOTES INCORPORATED BY REFERENCE
This solicitation incorporates one or more DLAD Procurement Notes by reference, with the same force and effect as if they were given in full text. The full text of a DLAD Procurement Note may be accessed electronically at http://www.
dla.mil/HQ/Acquisition/Offers/eProcurement.aspx and via 'References' on the DIBBS homepage.
(End of Text)
UCF SECTION E – FIRST ARTICLE – CONTRACTOR TESTING – DCMA DELEGATION
(1) Notice to Contractor: The Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) is delegated the authority to approve/disapprove the First Article Test Report submitted in accordance with the requirements in this contract. Any reference to the Contracting Officer as it relates to submission of and approval/ disapproval of the FAT Report shall be deemed to mean the DCMA ACO.
(2) Notice to ACO: The DCMA ACO shall forward a copy of the First Article Test Report and the DCMA ACO’s letter of approval/disapproval to the Contracting Officer at the buying activity and to the address identified in FAR Clause 52.209-3(b).
(End of Text)
UCF SECTION E – NOTE TO CONTRACTOR FOR INSPECTION – ALRE
Because of the critical nature of this material, a representative of the Naval Air Warfare Center (NAWC) Lakehurst is available to furnish technical assistance on Quality Assurance (QA) matters and shall have the option of conducting QA surveillance for the first lot produced under this contract (and subsequent lots if necessary).
This requirement will be performed in conjunction with the Quality Assurance Representative (QAR) of the cognizant Defense Contract Management Agency (DCMA) Contract Management Office and does not abrogate the authority of responsibility of the DCMA QAR. The Contractor agrees to notify, in writing, the supervisor of the Quality Assurance (QA) Section, Code 4.8.8.8, Lakehurst NJ 08733-5025, when the material is scheduled to be presented to the DCMA QAR for Government inspection and acceptance.
This notice shall afford the NAWC Lakehurst QA Representative the option of being present during the inspection.
Notification may be provided via telephone (732) 323-2834 immediately followed by written confirmation, or via facsimile transmission to (732) 323-1381. A minimum of fourteen (14) working days after receipt of notification is required to arrange such a visit.
Note: Advise the Procuring Contracting Officer (PCO) listed in the order by facsimile or email at the same time notice is given to NAWC Lakehurst.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 32 PAGES
CONTINUED ON NEXT PAGE
(End of Text)
UCF SECTION F – PRODUCTION FACILITY CHANGES
(a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided:
(1) Performance by small business or in labor surplus areas as required by the contract will not be changed;
(2) The change will not cause a delay in delivery or necessitate a change in the purchase description;
(3) The free on board (f.o.b.) point is not changed; and
(4) Each request is supported by a price reduction of $250 to cover the administrative costs to process the change.
(b) The Government reserves the right to deny approval even if these four elements are met.
(End of Text) UCF SECTION M – FIRST ARTICLE EVALUATION FACTORS (LOGISTICS COMMAND (LOGCOM) DEPOT LEVEL REPAIRABLE (DLR), DLA LAND
AND MARITIME)
(SELF DELETING ON AWARD)
Insert paragraphs (a) and (b) for depot level repairable items managed by LOGCOM with FAT.
(a) In the event the offeror does not qualify for waiver of first article testing under provisions set forth elsewhere in this solicitation, the costs of first article testing shall be a factor in evaluating offers.
(b) If the offeror fails to furnish a separate offered price for the first article line item in section “b”, the bid or proposal shall be evaluated under the presumption that there is no separate charge for first article testing, and the offeror agrees to perform such tests in accordance with terms of the resulting contract at no additional cost to the Government.
(End of Basic Text) Add paragraphs (c) and (d) when the FAT will be performed by the Government.
(c) It is estimated that Government costs incidental to first article test/evaluation will be (DOLLAR VALUE FOUND IN TDR IN FAT PARAGRAPH) For purposes of evaluation only, this amount will be added to those bids/proposals which do not qualify for waiver of first article under provisions set forth elsewhere in this solicitation.
(d) If a first article is disapproved and resubmission is authorized, the Government costs of $ (TO BE DETERMINED BY POST AWARD ADMIN POC) --- related to additional approval tests will be deducted from the contract amount for each submittal in accordance with Federal Acquisition Regulation (FAR) clause 52.209-4(c). This amount is in addition to any consideration flowing to the Government for extension, if such applies.
(End of Text)
NAVAIR finds the following quality programs acceptable to meeting the requirement of FAR Higher Level Quality clause 52.246-11:
ISO9000:1994
ISO9001:2000
ISO9001:2008
ISO9001:2015
AQS AC7004
AS9003
AS9100
MIL-I-45208
MIL-Q-9858 and equivalent
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 32 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLIES/SERVICES: 4730-01-437-5301
ITEM DESCRIPTION:
NUT,UNION
ALRE CSI
THE FOLLOWING DRAWINGS/DOCUMENTS APPLY TO THIS NSN:
524433(REV E)
CN014375301 (REV A)
SQAP014375301GFAT (REV A)
SQAP014375301QA (REV A)
CDRL-17-12151
REF DOC: TDR-17-12151 (GOVT ONLY/EXP: 10/18/2018)
***MRI INSPECTION REQUIRED***
This NSN requires MATERIAL RECEIPT INSPECTION (MRI) at NAVAIR LKE prior to Final Delivery.
Please Include Production Testing Inspection Report and required material certification package with parts.
If parts must be shipped individually, please Include Production Testing Inspection Report and required material certification package with each part.
Please ship parts to:
NAVAIR
CODE 4.8.8.8 / BLDG. 148-1
HWY 547
JOINT BASE MDL, NJ 08733
ATTN: Paul Campos MRI Inspection Required for this contract.
SERIALIZATION: Serialization is required for this ALRE CSI part as well as the packaging for traceability. Contractor technical documentation shall reflect the appropriate marking scheme. All serialized and lot numbered CSI parts shall be accounted for; to include material scrapped during manufacturing. Re-branding by suppliers which obscures the original marking (part number, serial number, CAGE) of the OEM of ALRE CSI parts is prohibited.
Please notify DLA Contracting Officer at time of quote if serialization is not practical due to size, material property, unreasonable or excessive cost.
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR
SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON
REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND
NON-MANUFACTURERS)
ISO9000:1994, ISO9001:2000, ISO9001:2008, ISO9001:2015, AQS AC7004,
AS9003, AS9100, MIL-I-45208, MIL-Q-9858 and equivalent are acceptable Quality Management Programs for NAVAIR/NAVSUP ALRE TDR approved sources.
RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 32 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 4730-01-437-5301 CONT'D
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
The Government Procuring Activity has determined that Surplus is not Acceptable for this NSN.
(End of TQ Requirement)
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
AIRCRAFT LAUNCH AND RECOVERY EQUIPMENT (ALRE) CRITICAL APPLICATION ITEM
SOURCE APPROVAL - TO BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION, AN
OFFEROR MUST BE AN APPROVED SOURCE OR PROVIDE THE PRODUCT OF AN APPROVED
SOURCE AS DETERMINED BY THE ENGINEERING SUPPORT ACTIVITY, NAVAL AIR
WARFARE CENTER (NAWC) AIRCRAFT DIVISION LAKEHURST. THE CRITERIA AND
PROCEDURES FOR SOURCE APPROVAL ARE CONTAINED IN PART I OF THE NAVAL
INVENTORY CONTROL POINT (NAVICP) PHILADELPHIA BROCHURE ENTITLED "SOURCE
APPROVAL INFORMATION BROCHURE FOR SPARES". THE LATEST VERSION OF THIS
BROCHURE MAY BE OBTAINED BY ACCESSING NAVICP'S WEBSITE:
HTTPS://WWW.NAVSUP.NAVY.MIL, OUR TEAM, NAVICP, BUSINESS OPPORTUNITIES,
COMMODITIES, SOURCE APPROVAL REQUEST (SAR) BROCHURE SPARES
TO ASSIST IN THE DETERMINATION OF SOURCE APPROVAL, THE OFFEROR MAY BE
REQUIRED TO SUBMIT TO A SURVEY PRIOR TO AWARD IN WHICH NAWC LAKEHURST
MAY PARTICIPATE.
IN ADDITION, THE OFFEROR MUST PROVIDE THE FOLLOWING INFORMATION, WHICH
MAY BE CONSIDERED IN DETERMINING WHETHER THE OFFEROR IS AN APPROVED
SOURCE:
(1) A SOURCE APPROVAL LETTER FROM NAVICP'S ENGINEERING AND PRODUCT
SUPPORT DIRECTORATE; OR;
(2) OTHER EVIDENCE INDICATING THAT THE OFFEROR MEETS THE SOURCE APPROVAL
CRITERIA.
ALL REQUESTS FOR WAIVERS OR DEVIATIONS CLASSIFIED AS CRITICAL, MAJOR, OR
MINOR MUST BE FORWARDED TO THE DSC CONTRACTING OFFICER FOR REVIEW AND
APPROVAL.
ALL ITEMS OF SUPPLY SHALL BE MARKED IAW MIL-STD-129. IN ADDITION, EACH
UNIT PACK WILL BE MARKED WITH LOT AND SERIAL NUMBER (IF AVAILABLE),
CONTRACTOR'S CAGE CODE, ACTUAL MANUFACTURER'S CAGE CODE AND PART NUMBER.
(February 2016)
THIS MATERIAL MUST MEET NAVAIR AIRCRAFT LAUNCH &
RECOVERY EQUIPMENT TRACEABILITY REQUIREMENTS. BARE
ITEM MARKINGS SHALL BE IAW THE TECHNICAL DATA
DRAWINGS PROVIDED.
BARE ITEM MATERIAL SHALL BE MARKED WITH CONTRACT
NUMBER, NAWC CAGE, AND PART NUMBER UNLESS OTHERWISE
SPECIFICIED ON ASSOCIATED DRAWING. IF A CONFLICT
EXISTS WITH MARKING REQUIREMENTS OF THIS 82N ALRE/SE
ITEM, THE ASSOCIATED DRAWING REQUIREMENTS SHALL APPLY.
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 32 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 4730-01-437-5301 CONT'D
REQUIRES ENGINEERING SOURCE APPROVAL BY THE
GOVERNMENT DESIGN CONTROL ACTIVITY.
The following Contract Data Requirements Lists (CDRLs), DD Form 1423s, apply to this procurement. Review the Technical Data Package (TDP) for additional information.
-First Article Testing Report -Production Test and Inspection Report -Certificate of Quality Compliance
If this NSN provides Contract Data Requirement Lists (CDRLs) as part of the Technical Data Package, the line items from this solicitation are not to be separately priced. Offerors must factor into the end item unit price all costs associated with the preparation and delivery of the data deliverables in the contract.
CLAUSE 52.246-15, CERTIFICATE OF CONFORMANCE, IS
NOT AUTHORIZED FOR THIS NSN.
IUID not required: Exempted by Military Services.
CRITICAL APPLICATION ITEM
KROBACH MFG. CORP. 30828 P/N 524433-8
DUHADAWAY TOOL AND DIE SHOP, INC. 1V517 P/N 524433-8
Nassau Tool Works, Inc. 2M490 P/N 524433-8
PRE-MACH, INC. 5S946 P/N 524433-8
COMPUTA-BASE-MACHINING, INC. 0A396 P/N 524433-8
COSTA PRECISION MANUFACTURING 9X175 P/N 524433-8
IAW REFERENCE DRAWING NR 80020 524433
REVISION NR E DTD 09/13/2016
PART PIECE NUMBER: 524433-8
IAW REFERENCE QAP 16236 SQAP014375301QA
REVISION NR A DTD 03/26/2018
PART PIECE NUMBER:
IAW REFERENCE QAP 16236 SQAP014375301GFAT
REVISION NR A DTD 03/26/2018
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 16236 CN014375301
REVISION NR A DTD 04/02/2018
PART PIECE NUMBER:
IAW REFERENCE QAP 16236 CDRL-17-12151
REVISION NR DTD 10/18/2017
PART PIECE NUMBER:
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 4730-01-437-5301 170.000 EA $ ________________ $ ________________
NUT,UNION
PRICING TERMS: Firm Fixed Price
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: DESTINATION DELIVERY DATE: 300 DAYS ADO
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP:001 PRES MTHD:31 CLNG/DRY:1 PRESV MAT:00
WRAP MAT:00 CUSH/DUNN MAT:NA CUSH/DUNN THKNESS:A
UNIT CONT:D3 OPI:O
INTRMDTE CONT:DO INTRMDTE CONT QTY:AAA
PACK CODE:U
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 32 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 4730-01-437-5301 CONT'D
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008
EACH UNIT PACKAGE WILL BE MARKED WITH THE NSN,
CONTRACT NUMBER, LOT NUMBER, CONTRACTOR CAGE
CODE, MANUFACTURER CAGE CODE, AND PART NUMBER.
PARCEL POST ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
FOR TRANSPORTATION ASSISTANCE SEE DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION (FDT) AWARDS SEE DLAD PROC
NOTE C20 AND
CONTRACT INSTRUCTIONS.
FREIGHT SHIPPING ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
Government First Article Test Government First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-4 for the actual quantity required to be tested.
0002 0001 - S00000052 1.000 EA $ ________________ $ ________________
FOB: DELIVERY DATE: 150 DAYS ADO
PREP FOR DELIVERY:
Not Applicable
Miscellaneous
0003 0001 - S00000046 1.000 EA $ ________________ $ ________________
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: DESTINATION DELIVERY DATE: 300 DAYS ADO
Miscellaneous
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 32 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 0001-S00000046 CONT'D
0004 0001 - S00000046 1.000 EA $ ________________ $ ________________
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: DESTINATION DELIVERY DATE: 300 DAYS ADO
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 0074384473 0001 N/A N/A N/A 02/12/2020
0002 N/A N/A N/A N/A N/A N/A
0003 N/A N/A N/A N/A 9999 N/A
0004 N/A N/A N/A N/A 9999 N/A
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 32 PAGES
CONTINUED ON NEXT PAGE
SECTION A - SOLICITATION/CONTRACT FORM
TECHNICAL REQUIREMENTS
THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN `R' OR AN `I' NUMBER IN SECTION B) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE
WEB AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-
ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016) FAR
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (SEP 2016)
C01 SUPERSEDED PART NUMBERED ITEMS (SEP 2016)
C14 REPACKAGING OR RELABELING TO CORRECT DEFICIENCIES (AUG 2017)
SECTION D - PACKAGING AND MARKING
252.211-7006 PASSIVE RADIO FREQUENCY IDENTIFICATION (JUN 2016) DFARS
As prescribed in 211.275-3, use the following clause:
(a) Definitions. As used in this clause --
“Advance shipment notice” means an electronic notification used to list the contents of a shipment of goods as well as additional information relating to the shipment, such as passive radio frequency identification (RFID) or item unique identification (IUID) information, order information, product description, physical characteristics, type of packaging, marking, carrier information, and configuration of goods within the transportation equipment.
“Bulk commodities” means the following commodities, when shipped in rail tank cars, tanker trucks, trailers, other bulk wheeled conveyances, or pipelines:
(1) Sand.
(2) Gravel.
(3) Bulk liquids (water, chemicals, or petroleum products).
(4) Ready-mix concrete or similar construction materials.
(5) Coal or combustibles such as firewood.
(6) Agricultural products such as seeds, grains, or animal feed.
“Case” means either a MIL-STD-129 defined exterior container within a palletized unit load or a MIL-STD-129 defined individual shipping container.
“Electronic Product Code™ (EPC)” means an identification scheme for universally identifying physical objects via RFID tags and other means.
The standardized EPC data consists of an EPC (or EPC identifier) that uniquely identifies an individual object, as well as an optional filter value when judged to be necessary to enable effective and efficient reading of the EPC tags. In addition to this standardized data, certain classes of EPC tags will allow user-defined data. The EPC Tag Data Standards will define the length and position of this data, without defining its content.
“EPCglobal®” means a subscriber-driven organization comprised of industry leaders and organizations focused on creating global standards for the adoption of passive RFID technology.
file:///C:/Users/RJ30041/AppData/Local/Temp/
Temp2_dfars_html%20(1).zip/dfars_html/211_2.htm
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 32 PAGES
SECTION D - PACKAGING AND MARKING (CONTINUED)
CONTINUED ON NEXT PAGE
“Exterior container” means a MIL-STD-129 defined container, bundle, or assembly that is sufficient by reason of material, design, and construction to protect unit packs and intermediate containers and their contents during shipment and storage. It can be a unit pack or a container with a combination of unit packs or intermediate containers. An exterior container may or may not be used as a shipping container.
“Palletized unit load” means a MIL-STD-129 defined quantity of items, packed or unpacked, arranged on a pallet in a specified manner and secured, strapped, or fastened on the pallet so that the whole palletized load is handled as a single unit. A palletized or skidded load is not considered to be a shipping container. A loaded 463L System pallet is not considered to be a palletized unit load. Refer to the Defense Transportation Regulation, DoD 4500.9-R, Part II, Chapter 203, for marking of 463L System pallets.
“Passive RFID tag” means a tag that reflects energy from the reader/interrogator or that receives and temporarily stores a small amount of energy from the reader/interrogator signal in order to generate the tag response. The only acceptable tags are EPC Class 1 passive RFID tags that meet the EPCglobal™ Class 1 Generation 2 standard.
“Radio frequency identification (RFID)” means an automatic identification and data capture technology comprising one or more reader/ interrogators and one or more radio frequency transponders in which data transfer is achieved by means of suitably modulated inductive or radiating electromagnetic carriers.
“Shipping container” means a MIL-STD-129 defined exterior container that meets carrier regulations and is of sufficient strength, by reason of material, design, and construction, to be shipped safely without further packing (e.g., wooden boxes or crates, fiber and metal drums, and corrugated and solid fiberboard boxes).
(b)(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall affix passive RFID tags, at the case- and palletized-unit-load packaging levels, for shipments of items that --
(i) Are in any of the following classes of supply, as defined in DoD 4140.1-R, DoD Supply Chain Materiel Management Regulation, AP1.1.11:
(A) Subclass of Class I - Packaged operational rations.
(B) Class II - Clothing, individual equipment, tentage, organizational tool kits, hand tools, and administrative and housekeeping supplies and equipment.
(C) Class IIIP - Packaged petroleum, lubricants, oils, preservatives, chemicals, and additives.
(D) Class IV - Construction and barrier materials.
(E) Class VI - Personal demand items (non-military sales items).
(F) Subclass of Class VIII - Medical materials (excluding pharmaceuticals, biologicals, and reagents - suppliers should limit the mixing of excluded and non-excluded materials).
(G) Class IX - Repair parts and components including kits, assemblies and subassemblies, reparable and consumable items required for maintenance support of all equipment, excluding medical-peculiar repair parts; and
(ii) Are being shipped to one of the locations listed at http://www.acq.osd.mil/log/sci/RFID_ship-to_locations.html or to --
(A) A location outside the contiguous United States when the shipment has been assigned Transportation Priority 1, or to --
(B) The following location(s) deemed necessary by the requiring activity:
Contract Line, Subline, or Exhibit Line Item Number Location Name City State DoDAAC
(2) The following are excluded from the requirements of paragraph (b)(1) of this clause:
(i) Shipments of bulk commodities.
(ii) Shipments to locations other than Defense Distribution Depots when the contract includes the clause at FAR 52.213-1, Fast Payment Procedures.
(c) The Contractor shall --
(1) Ensure that the data encoded on each passive RFID tag are globally unique (i.e., the tag ID is never repeated across two or more RFID tags and conforms to the requirements in paragraph (d) of this clause;
http://www.acq.osd.mil/log/sci/RFID_ship-to_locations.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 32 PAGES
SECTION D - PACKAGING AND MARKING (CONTINUED)
CONTINUED ON NEXT PAGE
(2) Use passive tags that are readable; and
(3) Ensure that the passive tag is affixed at the appropriate location on the specific level of packaging, in accordance with MIL-STD-129 (Section 4.9.2) tag placement specifications.
(d) Data syntax and standards. The Contractor shall encode an approved RFID tag using the instructions provided in the EPC™ Tag Data Standards in effect at the time of contract award. The EPC™ Tag Data Standards are available at http://www.epcglobalinc.org/standards/.
(1) If the Contractor is an EPCglobal™ subscriber and possesses a unique EPC™ company prefix, the Contractor may use any of the identifiers and encoding instructions described in the most recent EPC™ Tag Data Standards document to encode tags.
(2) If the Contractor chooses to employ the DoD identifier, the Contractor shall use its previously assigned Commercial and Government Entity (CAGE) code and shall encode the tags in accordance with the tag identifier details located in the DoD Suppliers' Passive RFID Information Guide at http://www.acq.osd.mil/log/sci/ait.html. If the Contractor uses a third-party packaging house to encode its tags, the CAGE code of the third-party packaging house is acceptable.
(3) Regardless of the selected encoding scheme, the Contractor with which the Department holds the contract is responsible for ensuring that the tag ID encoded on each passive RFID tag is globally unique, per the requirements in paragraph (c)(1).
(e) Advance shipment notice. The Contractor shall use Wide Area WorkFlow (WAWF), as required by DFARS 252.232-7003, Electronic Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph (d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/.
(End of clause)
SECTION E - INSPECTION AND ACCEPTANCE
E02 SUPPLEMENTAL FIRST ARTICLE EXHIBIT DISPOSITION – GOVERNMENT MAINTAINED (SEP 2016)
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) FAR
As prescribed in 46.311, insert the following clause:
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring
[Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.
(End of Clause)
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008) DFARS
E05 PRODUCT VERIFICATION TESTING (SEP 2016)
(1) When PVT is invoked, the QAR will notify the contractor that testing will be performed. The product verification testing (PVT) will be performed at a Government-designated testing laboratory.
(a) The contractor shall not ship or deliver any material unless directed to do so in writing by the contracting officer or until notified of http://www.epcglobalinc.org/standards/ http://www.acq.osd.mil/log/sci/ait.html file:///C:/Users/RJ30041/AppData/Local/Temp/
Temp2_dfars_html%20(1).zip/dfars_html/252232.htm https://wawf.eb.mil/ http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/46.htm
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 32 PAGES
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
CONTINUED ON NEXT PAGE
acceptable PVT results.
(b) PVT results will be provided in 20 working days after receipt at the Government testing facility.
(2) The QAR will select a random sample from the contractor's production lot. Selected PVT samples are to be shipped by the contractor at Government expense with a copy of the Department of Defense DD
Form 250 and a DD Form 1222. The packaging will be marked “Product Verification Test Samples, Contract Number Lot/Item Number ."
(3) Test results will indicate one of the following:
(a) Samples that pass testing and are not destroyed during evaluation will be returned to the contractor at the Government's expense and will be included as part of the total contract quantity. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. These samples will be considered part of the contract quantity. Samples that pass testing and are not returned to the contractor will be considered part of the contract quantity for payment and delivery. The contractor will deliver the remaining lot quantity minus sample units.
(b) If samples fail testing, such failure will result in rejection of the entire contract lot from which the samples were taken. At the Government's discretion, parts failing any test criteria may be retained and not be returned to the contractor.
E06 INSPECTION AND ACCEPTANCE AT ORIGIN (SEP 2016)
The contractor shall indicate the location where supplies will be inspected:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line-item numbers(s) (CLIN(s)):
The contractor shall indicate the location where packaging will be inspected:
[ ] Same as for supplies OR
CAGE code:
Address:
Applicable to CLIN(s):
SECTION F - DELIVERIES OR PERFORMANCE
52.211-8 TIME OF DELIVERY (JUN 1997) FAR
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER
DATE OF CONTRACT
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 32 PAGES
SECTION F - DELIVERIES OR PERFORMANCE (CONTINUED)
CONTINUED ON NEXT PAGE
ITEM NO. QUANTITY WITHIN DAYS AFTER
DATE OF CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989) FAR
52.242-15 STOP-WORK ORDER (AUG 1989) FAR
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
52.247-34 F.O.B. DESTINATION (NOV 1991) FAR
52.247-48 F.O.B. DESTINATION - EVIDENCE OF SHIPMENT (FEB 1999) FAR
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H03 SUPPLEMENTAL FIRST ARTICLE TESTING REQUIREMENTS (SEP 2016)
SECTION I - CONTRACT CLAUSES
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
FAR
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (OCT 2016) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013) DFARS
252.203-7995 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS (NOV 2016) DFARS
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016) FAR
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016) FAR
52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (OCT 2016) FAR
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 32 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016) FAR
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) FAR
52.204-20 PREDECESSOR OF OFFEROR (JUL 2016) FAR
As prescribed in 4.1804(d), insert the following provision:
(a) Definitions. As used in this provision -
“Commercial and Government Entity (CAGE) code” means -
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.
“Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
(b) The Offeror represents that it [ ] is or [ ] is not a successor to a predecessor that held a Federal contract or grant within the last three years.
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code:
Predecessor legal name:
(Do not use a “doing business as” name)
(End of provision)
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016) FAR
252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013) DFARS
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS
252.204-7004 ALTERNATE A, SYSTEM FOR AWRD MANAGEMENT (FEB 2014) DFARS
Standard Element ZB_204_7009 has no Title
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016) DFARS
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (MAY 2016) DFARS
52.209-4 FIRST ARTICLE APPROVAL - GOVERNMENT TESTING (SEP 1989) FAR
As prescribed in 9.308-2(a) and (b), insert the following clause:
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%204_18.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%209_3.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 32 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
[Contracting Officer shall insert details]
(a) The Contractor shall deliver 1 unit(s) of Lot/Item within 120 calendar days from the date of this contract to the Government at
NAVAL AIR WARFARE CENTER, Cage: 80020 Code 4.8.8.6 Bldg. 148-1 HIGHWAY 547 JBMDL, NJ 08733 Attn: Paul Campos [insert name and address of the testing facility] for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 45 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the
Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing.
All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The
Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the
Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor -
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
52.209-4 FIRST ARTICLE APPROVAL - GOVERNMENT TESTING (SEP 1989), ALT I (JAN 1997) FAR
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR SUSPENSION (OCT 2015) FAR
52.211-5 MATERIAL REQUIREMENTS (AUG 2000) FAR
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 16 OF 32 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008) FAR
252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS (NOV 2005) DFARS As prescribed in 211.273-4, use the following clause:
(a) Definition. “SPI process,” as used in this clause, means a management or manufacturing process that has been accepted previously by the Department of Defense under the Single Process Initiative (SPI) for use in lieu of a specific military or Federal specification or standard at specific facilities. Under SPI, these processes are reviewed and accepted by a Management Council, which includes representatives of the Contractor, the Defense Contract Management Agency, the Defense Contract Audit Agency, and the military departments.
(b) Offerors are encouraged to propose SPI processes in lieu of military or Federal specifications and standards cited in the solicitation. A listing of SPI processes accepted at specific facilities is available via the Internet at http://guidebook.dcma.mil/20/guidebook_process.htm (paragraph 4.2).
(c) An offeror proposing to use an SPI process in lieu of military or Federal specifications or standards cited in the solicitation shall
(1) Identify the specific military or Federal specification or standard for which the SPI process has been accepted;
(2) Identify each facility at which the offeror proposes to use the specific SPI process in lieu of military or Federal specifications or standards cited in the solicitation;
(3) Identify the contract line items, subline items, components, or elements affected by the SPI process; and
(4) If the proposed SPI process has been accepted at the facility at which it is proposed for use, but is not yet listed at the Internet site specified in paragraph (b) of this clause, submit documentation of Department of Defense acceptance of the SPI process.
(d) Absent a determination that an SPI process is not acceptable for this procurement, the Contractor shall use the following SPI processes in lieu of military or Federal specifications or standards:
(Offeror insert information for each SPI process)
SPI Process:
Facility:
Military or Federal Specification or Standard:
Affected Contract Line Item Number, Subline Item Number, Component, or Element:
(e) If a prospective offeror wishes to obtain, prior to the time specified for receipt of offers, verification that an SPI process is an acceptable replacement for military or Federal specifications or standards required by the solicitation, the prospective offeror
(1) May submit the information required by paragraph (d) of this clause to the Contracting Officer prior to submission of an offer; but
(2) Must submit the information to the Contracting Officer at least 10 working days prior to the date specified for receipt of offers.
52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL ITEMS) (JAN 2018) FAR As prescribed in 13.302-5(d), insert the following clause:
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.222-3, Convict Labor (Jun 2003) (E.O. 11755).
(iii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(iv) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(v) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(vi) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2013_3.html https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html https://www.acquisition.gov/sites/default/files/current/far/html/52_233_240.html http://uscode.house.gov
/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 17 OF 32 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
(vii) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.