Text version
PID/PACK TEXT – UPDATED 06/10/16 by J. Schmidt *** LTC PID Packaging Consolidated Text *** PLEASE SEE GLOSSARY AT THE END OF THE DOCUMENT FOR FULL TEXT OF THE ITEM DESCRIPTION
AND PACKAGING REFERENCE NUMBERS CALLED OUT FOR EACH NSN.
CLIN 0001 - NSN: 5998-01-481-6794
ELECTRONIC COMPONENTS ASSEMBLY.
REFERENCE NUMBER:ZD071
REFERENCE NUMBER:ES120
REFERENCE NUMBER:ZD059
REFERENCE NUMBER:CS001
REFERENCE NUMBER:CS187
CRITICAL APPLICATION ITEM
BAE SYSTEMS LAND ARMAMENTS L.P. 076M6 P/N 12422551-001
BAE SYSTEMS TACTICAL VEHICLE 0FW39 P/N 12422551-001
OSHKOSH DEFENSE, LLC 75Q65 P/N 12422551-001
IAW BASIC DRAWING NR 19207 12422551
REVISION NR F DTD 09/05/2013
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 19207 12422429
REVISION NR F DTD 09/05/2013
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 19207 12422551-001
REVISION NR DTD 10/15/2013
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 19207 12422551-001
REVISION NR DTD 10/22/2013
PART PIECE NUMBER:
PREP FOR DELIVERY
LINE ITEM 00001 TYPE OF COVERAGE: DLA DIRECT, CONUS
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP:001 PRES MTHD:ZZ CLNG/DRY:Z PRESV MAT:00
WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:Z
UNIT CONT:ZZ OPI:A
INTRMDTE CONT:ZZ INTRMDTE CONT QTY:ZZZ
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008
PRESERVATION, PACKAGING, AND PACKING SHALL
BE IN ACCORDANCE WITH SPECIAL PACKAGING
INSTRUCTION (SPI) AK14816794, DATED
05-31-2001.
ZZ - ADDITIONAL SPECIAL MARKING:
EXPORT CONTROLLED ITEM. SPECIAL MARKINGS
REQUIRED PER MIL-STD-129, PARAGRAPH 5.4.1.6
(PROTECTED CARGO): THE ITEM DESCRIPTION
(NOMENCLATURE) SHALL BE OMITTED FROM THE
MIL-STD-129 LABEL FOR ALL SHIPPING CONTAINERS.
40 - OMISSION OF MARKING FOR SENSITIVE,
CONTROLLED, OR PILFERABLE ITEMS PER
MIL-STD-129.
CLIN 0002 - NSN:5998-01-526-7657
ELECTRONIC COMPONENTS ASSEMBLY.
REFERENCE NUMBER:ZD087
REFERENCE NUMBER:CS120
REFERENCE NUMBER:CS187
REFERENCE NUMBER:CQC04
REFERENCE NUMBER:CS001
CRITICAL APPLICATION ITEM
BAE SYSTEMS LAND ARMAMENTS L.P. 076M6 P/N 12422551-004
BAE SYSTEMS TACTICAL VEHICLE 0FW39 P/N 12422551-004
OSHKOSH DEFENSE, LLC 75Q65 P/N 12422551-004
IAW BASIC DRAWING NR 19207 12422551
REVISION NR F DTD 09/05/2013
PART PIECE NUMBER: 12422551-004
IAW REFERENCE DRAWING NR 19207 12422551-004
REVISION NR DTD 01/08/2013
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 19207 12422429
REVISION NR F DTD 09/05/2013
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 19207 12422551
REVISION NR DTD 09/17/2012
PART PIECE NUMBER:
PREP FOR DELIVERY
LINE ITEM 00002 TYPE OF COVERAGE: DLA DIRECT, CONUS
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP:001 PRES MTHD:ZZ CLNG/DRY:1 PRESV MAT:00
WRAP MAT:00 CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0
UNIT CONT:00 OPI:A
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008
MOP ZZ: Preservation, Packaging, Packing and Marking shall be in accordance with Special Packaging Instruction 12422551, except as governed by Contract C requirements. Method of Preservation 10.
REFERENCE NUMBER:ZD017
GLOSSARY
PACKAGING TEXT
THE FOLLOWING PARAGRAPH APPLIES TO ALL PACKAGING CALLED OUT IN THIS DOCUMENT:
ITEM DESCRIPTION TEXT
REFERENCE NUMBER ZD071
Configuration Change Management - Engineering Change Proposal, Requests for Variance (Deviation or Waiver) February 2015
1. Requirements A. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for Configuration Control of material purchased under this contract.
B. Furnished item(s) shall conform to the approved configuration requirements/revision specified, unless a Pre-Production Request for Variance (deviation) or a Post-Production Request for Variance (waiver), is processed and approved as provided by Paragraph 3. in this Standard Text Object (STO). Hereafter, the term "Request for Variance (RFV)" will also include Requests for Deviations and Waivers.
2. The definitions from EIA-649-1 apply to items being procured under this solicitation/contract, with the following clarification of Deviation & Waiver:
A. Pre-Production RFV (previously known as deviation) requests permission to produce a product that does not conform to contract requirements/documentation for a limited amount of time and for specified effectivity. (A deviation differs from an engineering change in that an approved engineering change requires corresponding revision of the item's current approved configuration documentation, whereas a deviation does not.).
B. Post-Production RFV (previously known as waiver) requests approval of product found during manufacture, or after having been submitted for Government inspection or acceptance, that departs from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method.
3. Contractor responsibilities.
A. An Engineering Change Proposal (ECP) is used to make permanent changes in the Government technical data package (TDP). Pending approval of an ECP, contractual relief should be requested in writing by the Contractor using a RFV.
B. Refer to FAR Part 48 Value Engineering for cost saving improvements to the Technical Data Package (TDP).
C. All ECPs submitted by the Contractor will be deemed routine.
If the Contractor considers an ECP as an emergency or urgent; they shall include in their ECP submittal an explanation and all applicable supporting documentation. All ECPs will be reviewed for a determination on criticality, and, if concurred to be an emergency, the appropriate processing time-frame negotiated with the ESAs will be followed and the Contractor will be notified of anticipated response time.
D. For ECPs, Specification Change Notices (SCNs) or RFV, the Contractor must submit the applicable documentation listed in sub-paragraphs D.(1) through D.(4)to the Administrative Contracting Officer(ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV without processing.
(1) Documentation listed in Paragraph 3.3.1 (for ECPs), 3.3.2 (RFV), 3.3.3 (for SCNs) or 3.3.4 (for Notices of Revision (NORs)) of the latest revision of EIA-649-1.
(2) DD Form 1692 (current revision) for ECP.
(3) DD Form 1694 (current revision) for RFV.
(4) DD Form 1695 (current revision) for NOR.
4. DLA's responsibilities:
A. Upon receipt of the ECP or RFV, the PCO will ensure that the applicable product specialist receives the copy from DCMA.
B. Within five (5) working days from the date of receipt of the Contractor's ECP or RFV from DCMA, the PS must submit the requests and any supporting documentation via a 339 to the appropriate Engineering Support Activity (ESA), when applicable.
C. Routine ECPs will be processed within 90 days from receipt by the ESA. RFVs will be evaluated and processed within 30 days from receipt by the ESA or as negotiated with the ESA.
(1) The contractor will be notified in writing of approval by the return of an approved copy of the ECP or RFV. Approval will be reflected by signature of the contracting activity or a review activity specifically identified in the contract.
(2) The contractor will be notified in writing of disapproval including reason(s) for disapproval.
5. For an approved RFV or an approved ECP, when the request affects the Contract, a modification will be issued to the contract incorporating the applicable requirement changes. Only a Contracting Officer is authorized to issue a modification incorporating the approved RFV and/or
ECP.
6. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO.
7. The submission of an ECP or RFV by the Contractor does not affect the required delivery date of the contract. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract.
8. The period of time for evaluation and approval/disapproval of an ECP and/or a RFV, as specified in Paragraph 4. C., shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract. (End)
REFERENCE NUMBER ES120
NOTE: THE CITED DRAWING IS A SOURCE CONTROLLED
DRAWING AND AS OF THE DATE OF THIS SOLICITATION
ONLY THE SOURCE(S) CITED ON THE DRAWING HAVE
BEEN APPROVED. EVEN THOUGH SOURCES AND APPROVED
PART NUMBERS ARE PROVIDED, THE ITEMS
FURNISHED MUST MEET THE REQUIREMENTS OF THE
CITED DRAWING. OFFERORS WHO ARE INTERESTED
IN QUALIFYING THEIR PRODUCT FOR PURPOSE OF
FUTURE ACQUISITION MUST CONTACT THE
COGNIZANT DESIGN ACTIVITY SPECIFIED ON THE
SOURCE CONTROLLED DRAWING.
ALSO, MAY INCLUDE ADDITIONAL APPROVED SOURCES
THAT HAVE NOT BEEN REFLECTED ON THE DRAWING AT
THIS TIME.
REFERENCE NUMBER ZD059
52.246-11 Higher Level Contract Quality Requirement (Manufacturers)
FAR CLAUSE 52.246-11 APPLIES. A QUALITY MANAGEMENT PROGRAM MEETING THE
REQUIREMENTS OF ISO 9001:2008; A PROGRAM COMPARABLE TO ISO 9001:2008
(EXAMPLE SAE AS 9100), THE FOLLOWING TAILORED VERSION OF ISO 9001:2008;
OR A PROGRAM COMPARABLE TO THE TAILORED VERSION OF ISO 9001:2008
(EXAMPLE SAE AS 9003) IS REQUIRED. MIL-I-45208 AND MIL-Q-9858 ARE
OBSOLETE AND NO LONGER CONSIDERED SUITABLE WHEN HIGHER LEVEL QUALITY IS
REQUIRED. IN THE TAILORED VERSION OF THE ISO 9001:2008, ANY REFERENCES
WHICH CITE THE ENTIRE INTERNATIONAL STANDARD ARE INTERPRETED AS
EXCLUSIONS TO THIS DOCUMENT.
DLA TAILORED HIGHER LEVEL QUALITY CLAUSE FROM ISO 9001:2008
4.1 General requirements, [excluding reference to 1.2 and excluding NOTE 3 c)]
4.2.1 General, [excluding subparagraph a)]
4.2.2 Quality manual, [excluding subparagraph a)]
4.2.3 Control of documents
4.2.4 Control of records
5.1 Management commitment
5.3 Quality policy
6.2.2 Competence, training and awareness
6.4 Work environment
7.1 Planning of product realization, [excluding NOTE 2]
7.2.1 Determination of requirements related to the product
7.2.2 Review of requirements related to the product
7.2.3 Customer communication
7.3.7 Control of design and development changes
7.4.1 Purchasing process
7.4.3 Verification of purchased product
7.5.1 Control of production and service provision
7.5.3 Identification and traceability
7.5.4 Customer property
7.5.5 Preservation of product
7.6 Control of monitoring and measuring equipment
8.1 General, [excluding subparagraph b) and subparagraph c)]
8.2.2 Internal audit
8.2.4 Monitoring and measurement of product
8.3 Control of nonconforming product
8.5.2 Corrective action
8.5.3 Preventive action
REFERENCE NUMBER CS001
THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO
EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA
AND ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED
THROUGH JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE
DEPARTMENTS OF STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO
INTERNATIONAL AGREEMENTS.
TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, MILITARY
CRITICAL TECHNICAL DATA AGREEMENT, FORM IS AVAILABLE AT THE WORLD WIDE
WEB ADDRESS:
https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/defaul t.aspx
OR BY WRITING TO:
DLA LOGISTICS INFORMATION SERVICE
FEDERAL CENTER
74 WASHINGTON AVE., NORTH
BATTLE CREEK, MI 49037-3084
TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A
CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT,
DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY
THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN
EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 EXEMPTIONS OF
GENERAL APPLICABILITY, AND/OR EAR PART 740 ARE APPLICABLE.
NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL
DATA ARE REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN
APPLICABLE AGREEMENT OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO
RECEIVE A COPY OF THE EXPORT CONTROLLED TECHNICAL DATA.
NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO
THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA
UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY
PERMITTED BY DODD 5230.25.
REFERENCE NUMBER CS187
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
REFERENCE NUMBER ZD087
THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH MUST MEET QPL/QML
REQUIREMENTS. BY SUBMITTING AN OFFER, THE OFFEROR AGREES TO PROVIDE
QPL/QML COMPONENTS ONLY FROM SOURCES QUALIFIED ON THE APPLICABLE
QPL(S)/QML(S).
REFERENCE NUMBER CS120
NOTE: THE CITED DRAWING IS A SOURCE CONTROLLED
DRAWING AND AS OF THE DATE OF THIS SOLICITATION
ONLY THE SOURCE(S) CITED ON THE DRAWING HAVE
BEEN APPROVED. EVEN THOUGH SOURCES AND APPROVED
PART NUMBERS ARE PROVIDED, THE ITEMS
FURNISHED MUST MEET THE REQUIREMENTS OF THE
CITED DRAWING. OFFERORS WHO ARE INTERESTED IN
QUALIFYING THEIR PRODUCT FOR PURPOSE OF FUTURE
ACQUISITION MUST CONTACT THE COGNIZANT DESIGN
ACTIVITY SPECIFIED ON THE SOURCE CONTROLLED
DRAWING.
ALSO, MAY INCLUDE ADDITIONAL APPROVED SOURCES
THAT HAVE NOT BEEN REFLECTED ON THE DRAWING AT
THIS TIME.
REFERENCE NUMBER CQC04
DLAD 52.246-9003, MEASURING AND TEST EQUIPMENT,
APPLIES.
REFERENCE NUMBER ZD017
In addition to MIL-STD-129 markings, each MRAP palletized shipment shall include two, 10 inch by 10 inch fluorescent yellow sticker/sign/placard with the letters MRAP in 2 inch bold black letters and applied to one side and one panel of palletized load. For better visibility, place the MRAP sticker/sign/placard on the outside of the multiwall container(s) or the pallet, not under any shrink-wrap. The stickers are to be placed high on each side of each container, so they are visible at eye level.
This sticker/sign/placard is required to expedite the receipt and inspection of these shipments. This requirement is only applicable for shipments directed to DDC depots and direct vendor deliveries to CCPs;
and does not apply to direct vendor deliveries to the customer.
ACCEPTABLE DEVIATIONS: Contractor is authorized to make adjustments to actual sticker size and font size when shipping containers are not large enough to adequately display all required MIL-STD-129 markings along with the standard size (as cited above).
OEM MRAP STICKERS: Each OEM has a designated background color in lieu of the standard yellow background MRAP sticker in an effort to apply Lean Six Sigma principles and concepts to packaging, storage, and transport of MRAP material to theater. The following are the official designations (background color # text required):
GREEN # MRAP BAE (TX)
TEAL # MRAP OSHKOSH
PURPLE # MRAP BAE (PA)
ORANGE # MRAP FPII
BLUE # MRAP NAVISTAR
PINK # MRAP GDLS
NOTE: If MRAP stickers are missing or OEM is exhausting yellow background stickers, no quality notification shall be submitted to Contract Administrating Activity.