PID/PACK TEXT – UPDATED 06/10/16 by J. Schmidt *** LTC PID Packaging Consolidated Text *** PLEASE SEE GLOSSARY AT THE END OF THE DOCUMENT FOR FULL TEXT OF THE ITEM DESCRIPTION

AND PACKAGING REFERENCE NUMBERS CALLED OUT FOR EACH NSN.

CLIN 0001 - NSN: 5998-01-481-6794

ELECTRONIC COMPONENTS ASSEMBLY.

REFERENCE NUMBER:ZD071

REFERENCE NUMBER:ES120

REFERENCE NUMBER:ZD059

REFERENCE NUMBER:CS001

REFERENCE NUMBER:CS187

CRITICAL APPLICATION ITEM

BAE SYSTEMS LAND ARMAMENTS L.P. 076M6 P/N 12422551-001

BAE SYSTEMS TACTICAL VEHICLE 0FW39 P/N 12422551-001

OSHKOSH DEFENSE, LLC 75Q65 P/N 12422551-001

IAW BASIC DRAWING NR 19207 12422551

REVISION NR F DTD 09/05/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422429

REVISION NR F DTD 09/05/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422551-001

REVISION NR DTD 10/15/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422551-001

REVISION NR DTD 10/22/2013

PART PIECE NUMBER:

PREP FOR DELIVERY

LINE ITEM 00001 TYPE OF COVERAGE: DLA DIRECT, CONUS

PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999

QUP:001 PRES MTHD:ZZ CLNG/DRY:Z PRESV MAT:00

WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:Z

UNIT CONT:ZZ OPI:A

INTRMDTE CONT:ZZ INTRMDTE CONT QTY:ZZZ

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:ZZ -ZZ Special Requirements

PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008

PRESERVATION, PACKAGING, AND PACKING SHALL

BE IN ACCORDANCE WITH SPECIAL PACKAGING

INSTRUCTION (SPI) AK14816794, DATED

05-31-2001.

ZZ - ADDITIONAL SPECIAL MARKING:

EXPORT CONTROLLED ITEM. SPECIAL MARKINGS

REQUIRED PER MIL-STD-129, PARAGRAPH 5.4.1.6

(PROTECTED CARGO): THE ITEM DESCRIPTION

(NOMENCLATURE) SHALL BE OMITTED FROM THE

MIL-STD-129 LABEL FOR ALL SHIPPING CONTAINERS.

40 - OMISSION OF MARKING FOR SENSITIVE,

CONTROLLED, OR PILFERABLE ITEMS PER

MIL-STD-129.

CLIN 0002 - NSN:5998-01-526-7657

ELECTRONIC COMPONENTS ASSEMBLY.

REFERENCE NUMBER:ZD087

REFERENCE NUMBER:CS120

REFERENCE NUMBER:CS187

REFERENCE NUMBER:CQC04

REFERENCE NUMBER:CS001

CRITICAL APPLICATION ITEM

BAE SYSTEMS LAND ARMAMENTS L.P. 076M6 P/N 12422551-004

BAE SYSTEMS TACTICAL VEHICLE 0FW39 P/N 12422551-004

OSHKOSH DEFENSE, LLC 75Q65 P/N 12422551-004

IAW BASIC DRAWING NR 19207 12422551

REVISION NR F DTD 09/05/2013

PART PIECE NUMBER: 12422551-004

IAW REFERENCE DRAWING NR 19207 12422551-004

REVISION NR DTD 01/08/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422429

REVISION NR F DTD 09/05/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422551

REVISION NR DTD 09/17/2012

PART PIECE NUMBER:

PREP FOR DELIVERY

LINE ITEM 00002 TYPE OF COVERAGE: DLA DIRECT, CONUS

PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999

QUP:001 PRES MTHD:ZZ CLNG/DRY:1 PRESV MAT:00

WRAP MAT:00 CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0

UNIT CONT:00 OPI:A

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:ZZ -ZZ Special Requirements

PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008

MOP ZZ: Preservation, Packaging, Packing and Marking shall be in accordance with Special Packaging Instruction 12422551, except as governed by Contract C requirements. Method of Preservation 10.

REFERENCE NUMBER:ZD017

GLOSSARY

PACKAGING TEXT

THE FOLLOWING PARAGRAPH APPLIES TO ALL PACKAGING CALLED OUT IN THIS DOCUMENT:

ITEM DESCRIPTION TEXT

REFERENCE NUMBER ZD071

Configuration Change Management - Engineering Change Proposal, Requests for Variance (Deviation or Waiver) February 2015

1. Requirements A. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for Configuration Control of material purchased under this contract.

B. Furnished item(s) shall conform to the approved configuration requirements/revision specified, unless a Pre-Production Request for Variance (deviation) or a Post-Production Request for Variance (waiver), is processed and approved as provided by Paragraph 3. in this Standard Text Object (STO). Hereafter, the term "Request for Variance (RFV)" will also include Requests for Deviations and Waivers.

2. The definitions from EIA-649-1 apply to items being procured under this solicitation/contract, with the following clarification of Deviation & Waiver:

A. Pre-Production RFV (previously known as deviation) requests permission to produce a product that does not conform to contract requirements/documentation for a limited amount of time and for specified effectivity. (A deviation differs from an engineering change in that an approved engineering change requires corresponding revision of the item's current approved configuration documentation, whereas a deviation does not.).

B. Post-Production RFV (previously known as waiver) requests approval of product found during manufacture, or after having been submitted for Government inspection or acceptance, that departs from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method.

3. Contractor responsibilities.

A. An Engineering Change Proposal (ECP) is used to make permanent changes in the Government technical data package (TDP). Pending approval of an ECP, contractual relief should be requested in writing by the Contractor using a RFV.

B. Refer to FAR Part 48 Value Engineering for cost saving improvements to the Technical Data Package (TDP).

C. All ECPs submitted by the Contractor will be deemed routine.

If the Contractor considers an ECP as an emergency or urgent; they shall include in their ECP submittal an explanation and all applicable supporting documentation. All ECPs will be reviewed for a determination on criticality, and, if concurred to be an emergency, the appropriate processing time-frame negotiated with the ESAs will be followed and the Contractor will be notified of anticipated response time.

D. For ECPs, Specification Change Notices (SCNs) or RFV, the Contractor must submit the applicable documentation listed in sub-paragraphs D.(1) through D.(4)to the Administrative Contracting Officer(ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV without processing.

(1) Documentation listed in Paragraph 3.3.1 (for ECPs), 3.3.2 (RFV), 3.3.3 (for SCNs) or 3.3.4 (for Notices of Revision (NORs)) of the latest revision of EIA-649-1.

(2) DD Form 1692 (current revision) for ECP.

(3) DD Form 1694 (current revision) for RFV.

(4) DD Form 1695 (current revision) for NOR.

4. DLA's responsibilities:

A. Upon receipt of the ECP or RFV, the PCO will ensure that the applicable product specialist receives the copy from DCMA.

B. Within five (5) working days from the date of receipt of the Contractor's ECP or RFV from DCMA, the PS must submit the requests and any supporting documentation via a 339 to the appropriate Engineering Support Activity (ESA), when applicable.

C. Routine ECPs will be processed within 90 days from receipt by the ESA. RFVs will be evaluated and processed within 30 days from receipt by the ESA or as negotiated with the ESA.

(1) The contractor will be notified in writing of approval by the return of an approved copy of the ECP or RFV. Approval will be reflected by signature of the contracting activity or a review activity specifically identified in the contract.

(2) The contractor will be notified in writing of disapproval including reason(s) for disapproval.

5. For an approved RFV or an approved ECP, when the request affects the Contract, a modification will be issued to the contract incorporating the applicable requirement changes. Only a Contracting Officer is authorized to issue a modification incorporating the approved RFV and/or

ECP.

6. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO.

7. The submission of an ECP or RFV by the Contractor does not affect the required delivery date of the contract. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract.

8. The period of time for evaluation and approval/disapproval of an ECP and/or a RFV, as specified in Paragraph 4. C., shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract. (End)

REFERENCE NUMBER ES120

NOTE: THE CITED DRAWING IS A SOURCE CONTROLLED

DRAWING AND AS OF THE DATE OF THIS SOLICITATION

ONLY THE SOURCE(S) CITED ON THE DRAWING HAVE

BEEN APPROVED. EVEN THOUGH SOURCES AND APPROVED

PART NUMBERS ARE PROVIDED, THE ITEMS

FURNISHED MUST MEET THE REQUIREMENTS OF THE

CITED DRAWING. OFFERORS WHO ARE INTERESTED

IN QUALIFYING THEIR PRODUCT FOR PURPOSE OF

FUTURE ACQUISITION MUST CONTACT THE

COGNIZANT DESIGN ACTIVITY SPECIFIED ON THE

SOURCE CONTROLLED DRAWING.

ALSO, MAY INCLUDE ADDITIONAL APPROVED SOURCES

THAT HAVE NOT BEEN REFLECTED ON THE DRAWING AT

THIS TIME.

REFERENCE NUMBER ZD059

52.246-11 Higher Level Contract Quality Requirement (Manufacturers)

FAR CLAUSE 52.246-11 APPLIES. A QUALITY MANAGEMENT PROGRAM MEETING THE

REQUIREMENTS OF ISO 9001:2008; A PROGRAM COMPARABLE TO ISO 9001:2008

(EXAMPLE SAE AS 9100), THE FOLLOWING TAILORED VERSION OF ISO 9001:2008;

OR A PROGRAM COMPARABLE TO THE TAILORED VERSION OF ISO 9001:2008

(EXAMPLE SAE AS 9003) IS REQUIRED. MIL-I-45208 AND MIL-Q-9858 ARE

OBSOLETE AND NO LONGER CONSIDERED SUITABLE WHEN HIGHER LEVEL QUALITY IS

REQUIRED. IN THE TAILORED VERSION OF THE ISO 9001:2008, ANY REFERENCES

WHICH CITE THE ENTIRE INTERNATIONAL STANDARD ARE INTERPRETED AS

EXCLUSIONS TO THIS DOCUMENT.

DLA TAILORED HIGHER LEVEL QUALITY CLAUSE FROM ISO 9001:2008

4.1 General requirements, [excluding reference to 1.2 and excluding NOTE 3 c)]

4.2.1 General, [excluding subparagraph a)]

4.2.2 Quality manual, [excluding subparagraph a)]

4.2.3 Control of documents

4.2.4 Control of records

5.1 Management commitment

5.3 Quality policy

6.2.2 Competence, training and awareness

6.4 Work environment

7.1 Planning of product realization, [excluding NOTE 2]

7.2.1 Determination of requirements related to the product

7.2.2 Review of requirements related to the product

7.2.3 Customer communication

7.3.7 Control of design and development changes

7.4.1 Purchasing process

7.4.3 Verification of purchased product

7.5.1 Control of production and service provision

7.5.3 Identification and traceability

7.5.4 Customer property

7.5.5 Preservation of product

7.6 Control of monitoring and measuring equipment

8.1 General, [excluding subparagraph b) and subparagraph c)]

8.2.2 Internal audit

8.2.4 Monitoring and measurement of product

8.3 Control of nonconforming product

8.5.2 Corrective action

8.5.3 Preventive action

REFERENCE NUMBER CS001

THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO

EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA

AND ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED

THROUGH JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE

DEPARTMENTS OF STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO

INTERNATIONAL AGREEMENTS.

TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, MILITARY

CRITICAL TECHNICAL DATA AGREEMENT, FORM IS AVAILABLE AT THE WORLD WIDE

WEB ADDRESS:

https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/defaul t.aspx

OR BY WRITING TO:

DLA LOGISTICS INFORMATION SERVICE

FEDERAL CENTER

74 WASHINGTON AVE., NORTH

BATTLE CREEK, MI 49037-3084

TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A

CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT,

DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY

THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN

EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 EXEMPTIONS OF

GENERAL APPLICABILITY, AND/OR EAR PART 740 ARE APPLICABLE.

NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL

DATA ARE REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN

APPLICABLE AGREEMENT OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO

RECEIVE A COPY OF THE EXPORT CONTROLLED TECHNICAL DATA.

NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO

THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA

UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY

PERMITTED BY DODD 5230.25.

REFERENCE NUMBER CS187

CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE

USED NOR INCORPORATED IN ANY ITEMS TO BE

DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION

SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT

DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.

SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR

APPROVAL UNLESS THEY ARE AUTHORIZED BY THE

SPECIFICATION REQUIREMENTS.

REFERENCE NUMBER ZD087

THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH MUST MEET QPL/QML

REQUIREMENTS. BY SUBMITTING AN OFFER, THE OFFEROR AGREES TO PROVIDE

QPL/QML COMPONENTS ONLY FROM SOURCES QUALIFIED ON THE APPLICABLE

QPL(S)/QML(S).

REFERENCE NUMBER CS120

NOTE: THE CITED DRAWING IS A SOURCE CONTROLLED

DRAWING AND AS OF THE DATE OF THIS SOLICITATION

ONLY THE SOURCE(S) CITED ON THE DRAWING HAVE

BEEN APPROVED. EVEN THOUGH SOURCES AND APPROVED

PART NUMBERS ARE PROVIDED, THE ITEMS

FURNISHED MUST MEET THE REQUIREMENTS OF THE

CITED DRAWING. OFFERORS WHO ARE INTERESTED IN

QUALIFYING THEIR PRODUCT FOR PURPOSE OF FUTURE

ACQUISITION MUST CONTACT THE COGNIZANT DESIGN

ACTIVITY SPECIFIED ON THE SOURCE CONTROLLED

DRAWING.

ALSO, MAY INCLUDE ADDITIONAL APPROVED SOURCES

THAT HAVE NOT BEEN REFLECTED ON THE DRAWING AT

THIS TIME.

REFERENCE NUMBER CQC04

DLAD 52.246-9003, MEASURING AND TEST EQUIPMENT,

APPLIES.

REFERENCE NUMBER ZD017

In addition to MIL-STD-129 markings, each MRAP palletized shipment shall include two, 10 inch by 10 inch fluorescent yellow sticker/sign/placard with the letters MRAP in 2 inch bold black letters and applied to one side and one panel of palletized load. For better visibility, place the MRAP sticker/sign/placard on the outside of the multiwall container(s) or the pallet, not under any shrink-wrap. The stickers are to be placed high on each side of each container, so they are visible at eye level.

This sticker/sign/placard is required to expedite the receipt and inspection of these shipments. This requirement is only applicable for shipments directed to DDC depots and direct vendor deliveries to CCPs;

and does not apply to direct vendor deliveries to the customer.

ACCEPTABLE DEVIATIONS: Contractor is authorized to make adjustments to actual sticker size and font size when shipping containers are not large enough to adequately display all required MIL-STD-129 markings along with the standard size (as cited above).

OEM MRAP STICKERS: Each OEM has a designated background color in lieu of the standard yellow background MRAP sticker in an effort to apply Lean Six Sigma principles and concepts to packaging, storage, and transport of MRAP material to theater. The following are the official designations (background color # text required):

GREEN # MRAP BAE (TX)

TEAL # MRAP OSHKOSH

PURPLE # MRAP BAE (PA)

ORANGE # MRAP FPII

BLUE # MRAP NAVISTAR

PINK # MRAP GDLS

NOTE: If MRAP stickers are missing or OEM is exhausting yellow background stickers, no quality notification shall be submitted to Contract Administrating Activity.

File details come from the government source that posted it. Updated .