SPE7L118Q0268.PDF

PDF 153 KB Posted

Attached to
COVER, FITTED, VEHICU Federal contract opportunity
Solicitation number
SPE7L118Q0268
Issued by
Defense Logistics Agency Land and Maritime

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

4. CERT.FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5. ISSUED BY

7. DELIVERY

9. DESTINATION

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5 ON OR

BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (See Continuation Sheets)

12. DISCOUNT FOR PROMPT PAYMENT

d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

14. SIGNATURE OF PERSON AUTHORIZED TO SIGN

QUOTATION

16. SIGNER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not useable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

1. REQUEST NO.

SPE7L1-18-Q-0268

2. DATE ISSUED

2018 MAY 21

3. REQUISITION/PURCHASE REQUEST NO.

0073704180

RATING

DO-C9

DLA LAND AND MARITIME

LAND SUPPLY CHAIN

PO BOX 3990

COLUMBUS OH 43218-3990

USA

Buyer: Jarius Merriweather PLCL3PW Tel: 614-692-6567 Email: Jarius.Merriweather@dla.mil

6. DELIVER BY (Date)

SEE SCHEDULE

8. TO:

c. CITY

d. STATE

b. STREET ADDRESS

a. NAME OF CONSIGNEE

e. ZIP CODE

a. 10 CALENDAR DAYS

b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS

15. DATE OF QUOTATION

a. NAME (Type or Print)

AREA CODE

c. TITLE (Type or Print)d. CITY

c. COUNTY

b. STREET ADDRESS

e. STATE f. ZIP CODE

See Schedule

2018 MAY 31

NUMBER

FOB DESTINATION

OTHER

(See Schedule)

CAGE

b. TELEPHONE

See attached schedule to complete quote information.

Quoter must also complete the following:

a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .

b. Prices quoted are:

___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .

___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.

___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;

___ Customer ________________________.

___ Other (provide basis) ______________________________________ _______________________________________ .

c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .

d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.

e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:

f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 10 PAGES

SPE7L1-18-Q-0268

CONTINUED ON NEXT PAGE

THIS SOLICITATION IS BEING ISSUED UNDER SEPA AUTHORITY. REQUIREMENT MAY BE AWARDED PRIOR TO SOLICITATION RETURN DATE.

OFFER SUBMISSION INSTRUCTIONS: ALL OFFERORS MUST SUBMIT THIER QUOTES THROUGH DIBBS . Once the evaluation process begins, late quotations will only be considered if the contracting officer determines that considering the late quotation is in the best interest of the Government and would not unduly delay the award.

This solicitation will be available on the Internet at http://www.dibbs.bsm.dla.mil/. Due to system constraints, it may take as long as three business days from the stated issue date for the solicitation to post to DIBBS.

EVALUATION FACTORS FOR AWARD

Award will be made to the offeror(s) whose quote(s) conforms to the solicitation requirements and represents the best value to the Government. Past performance, offered delivery and price will be evaluated when making a comparative assessment of quotes. An award may be made to other than the lowest priced, technically acceptable, responsible offeror(s).

THE FOLLOWING CLAUSES ALSO APPLY:

DFARS 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A TERRORIST COUNTRY.

FAR 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

FAR 52.203-12 LIMITATIONS ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

FAR 52.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A TERRORIST COUNTRY

FAR 52.223-13 CERTIFICATION OF TOXIC CHEMICAL RELEASE REPORTING

DFARS 252.225-7001 BUY AMERICAN ACT

FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS

FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS

FAR 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED ITEMS DFARS 252.225-7050 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF

TERRORISM

FAR 52.203-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES

THIS SOLICITATION INCORPORATES THE TERMS AND CONDITIONS SET FORTH IN THE REVISION OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS IN EFFECT ON THE SOLICITATION ISSUE DATE. ALL REVISIONS OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS CAN BE FOUND ON THE WEB AT: http://www.dla.mil/ HQ/Acquisition/Offers/eProcurement.aspx

DLAD PROCUREMENT NOTES

DLAD Procurement Notes are incorporated by reference, with the same force and effect as if they were in full text. The full text of a DLAD Procurement Note may be accessed electronically at http://www.dla.mil/HQ/Acquisition/Offers/ eProcurement.aspx and via 'References' on the DIBBS homepage.

FDT

This solicitation is issued under the First Destination Transportation (FDT) program to reduce the cost of transportation through the use of Government-arranged transportation utilizing Government contracts and rates. If this award is for FMS or has an APO/FPO ship-to address, these instructions do not apply.

For FDT Program Transportation Requirements, see Procurement Note C16 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Manual Awards, C17 First Destination Transportation (FDT) Program – Shipments Originating from Outside the Contiguous United States, and Procurement Note C20 – Vendor Shipment Module (VSM).

Offers should be submitted based on FOB origin. For offerors whose shipments will originate from outside the contiguous United States, the offeror’s f.o.b. origin price shall include transportation to a contiguous United States location that the offeror selects based on cost-effectiveness or other variables at the offeror’s discretion.

Additional information about FDT can be found at http://www.dla.mil/LandandMaritime/Business/Selling/DLA-Land-and- Maritime-Procurement-Initiatives/FDTPI/ C16 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Manual Awards (AUG 2017)

(1) Definitions.“Government-arranged transportation” means the Government is responsible for transportation costs, providing the carrier, and scheduling the shipment pickup contingent upon proper contractor notification in VSM (see procurement note C20).

(2) The contractor determines its transportation processes, controls, or costs. The contractor may submit an offer based on f.o.b. destination if it offers a better value to the Government.

(3) The contractor shall:

(a) Use the VSM to notify the Government that the materiel is ready to ship. The Government can take up to two (2) full business days to schedule the shipment. Pick-up should occur within five (5) business days of the contractor’s notification. The contractor shall plan for sufficient time for scheduling the shipment and standard ground transportation for its material to arrive at the destination by the Contract Delivery Date (CDD).

(b) Address the following special accommodations:

(i) If an order specifies carrier equipment when requested by the Government; or

(ii) If an order does not specify carrier equipment, the order appropriate carrier equipment should not be in excess of capacity to accommodate shipment;

(c) Deliver the shipment in good order and condition to the carrier, and load, stow, trim, block, and/or brace carload or truckload shipment (when loaded by the contractor) on or in the carrier’s conveyance as required by carrier rules and regulations

(4) The contractor is responsible for any loss and/or damage to the goods occurring before delivery to the carrier as a result of improper loading, stowing, trimming, blocking, and/or bracing of the shipment if loaded by the contractor on or in the carrier’s conveyance. _______________________________________________________________________________

DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 10 PAGES

CONTINUED ON NEXT PAGE

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.

acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

An invoice and WAWF receiving report (RR) are both required. The invoice and receiving report may be submitted separately or together as a combo type document. See DFARS Appendix F for detailed instructions on preparing the WAWF

RR.

NOTE: For contracts in accordance with Fast Payment Procedures, a Fast Pay (FP) invoice must be connected with a receiving report (RR), so either submit a FP combo or submit a RR and follow with a FP invoice. If there is no registered acceptor, the RR portion of the combo cannot be processed. In this case, submit a stand-alone FP invoice (“accept by” DoDAAC/location is mandatory).

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

See Award.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table Field Name in WAWFData to be entered in WAWF Pay Official DoDAACSee Page 1 Issue By DoDAACSee Page 1 Admin DoDAACSee Page 1 Inspect By DoDAACSee Award Ship To CodeSee Award Ship From CodeSee Award/Purchase Order if applicable Mark For CodeSee Award/Purchase Order if applicable Service Approver (DoDAAC)See Award/Purchase Order if applicable Service Acceptor (DoDAAC)See Award/Purchase Order if applicable Accept at Other DoDAACSee Award/Purchase Order if applicable LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Additional email notifications are not required.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Contact the local contract administrator found in block 6 of the DD 1155, block 9 of the SF 1449, or block 5 of the SF 26.

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 10 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLIES/SERVICES: 2540-01-436-9658

ITEM DESCRIPTION:

COVER,FITTED,VEHICU

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE

DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR

SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE

SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE

ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE

APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON

REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND

NON-MANUFACTURERS)

RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL

REQUEST FOR VARIANCE (DEVIATION OR WAIVER)

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES

RQ016: COMPONENT QUALIFIED PRODUCTS LISTS (QPL)/QUALIFIED MANUFACTURERS

LISTS (QML). THIS ITEM CONTAINS ONE OR MORE COMPONENTS DEFINED BY A

SPECIFICATION(S) WITH AN ASSOCIATED QUALIFIED PRODUCTS LIST (QPL) OR

QUALIFIED MANUFACTURERS LIST (QML). QUALIFICATION REQUIREMENTS IN

PROCUREMENT NOTE H02 "COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED

MANUFACTURERS LIST (QML)" APPLY.

CONTRACTOR CERTIFICATE OF CONFORMANCE REQUIRED

FIRST ARTICLE TEST INSPECTION (FAT) FOR TARP AND BOW KITS INCLUDES THE

REQUIREMENTS ON THE INSTALLATION DRAWING AND ALL SUBASSEMBLY/COMPONENT

DRAWINGS

THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO

EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA AND

ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED THROUGH

JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE DEPARTMENTS OF

STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO INTERNATIONAL

AGREEMENTS.

TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, MILITARY CRITICAL

TECHNICAL DATA AGREEMENT, FORM IS AVAILABLE AT THE WORLD WIDE WEB

ADDRESS:

https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/defaul t.aspx

OR BY WRITING TO:

DLA LOGISTICS INFORMATION SERVICE

FEDERAL CENTER

74 WASHINGTON AVE., NORTH

BATTLE CREEK, MI 49037-3084

TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A

CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT,

DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY

THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN

EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 EXEMPTIONS OF

GENERAL APPLICABILITY, AND/OR EAR PART 740 ARE APPLICABLE.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 10 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLY/SERVICE: 2540-01-436-9658 CONT'D

NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL DATA ARE

REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN APPLICABLE AGREEMENT

OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO RECEIVE A COPY OF THE

EXPORT CONTROLLED TECHNICAL DATA.

NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO

THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA

UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY

PERMITTED BY DODD 5230.25.

CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE

USED NOR INCORPORATED IN ANY ITEMS TO BE

DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION

SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT

DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.

SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR

APPROVAL UNLESS THEY ARE AUTHORIZED BY THE

SPECIFICATION REQUIREMENTS.

SAMPLING:

THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ

H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE

SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,

STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR

AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF

VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED

ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE

SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER

MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR

PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT

SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT

UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.

IAW BASIC DRAWING NR 19207 57K1926

REVISION NR D DTD 08/30/2013

PART PIECE NUMBER: 57K1926-001

IAW REFERENCE DRAWING NR 19207 12420025

REVISION NR G DTD 01/28/2015

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12421716

REVISION NR C DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422305

REVISION NR C DTD 09/30/2011

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420024

REVISION NR H DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12378482

REVISION NR F DTD 04/21/2005

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420022

REVISION NR K DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420274

REVISION NR B DTD 10/26/2005

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420275

REVISION NR E DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420276

REVISION NR B DTD 04/04/2013

PART PIECE NUMBER:

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 10 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLY/SERVICE: 2540-01-436-9658 CONT'D

IAW REFERENCE DRAWING NR 19207 12420277

REVISION NR K DTD 11/06/2012

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12421693

REVISION NR C DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422280

REVISION NR C DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422999

REVISION NR DTD 11/13/2002

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 97403 13228E1633

REVISION NR K DTD 06/03/2006

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420301

REVISION NR E DTD 01/06/2011

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422292

REVISION NR D DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420280

REVISION NR B DTD 03/02/2011

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420289

REVISION NR F DTD 03/31/2015

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422279

REVISION NR F DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420291

REVISION NR E DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12422320

REVISION NR C DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420325

REVISION NR H DTD 10/24/2012

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420281

REVISION NR J DTD 11/21/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 13228E1631

REVISION NR K DTD 03/06/2006

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420023

REVISION NR J DTD 08/30/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420283

REVISION NR H DTD 11/21/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12421717

REVISION NR C DTD 09/17/2014

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 57K1899

REVISION NR D DTD 02/23/2012

IAW REFERENCE DRAWING NR 19207 57K1924

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 10 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLY/SERVICE: 2540-01-436-9658 CONT'D

REVISION NR C DTD 02/23/2012

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 12420288

REVISION NR F DTD 03/31/2015

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 57K1926-001

REVISION NR DTD 04/17/2018

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 19207 57K1926-001

REVISION NR G DTD 05/20/2014

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 2540-01-436-9658 550.000 KT $ ________________ $ ________________

COVER,FITTED

,VEHICU

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 208 DAYS ADO

PREP FOR DELIVERY:

PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999

QUP:001 PRES MTHD:ZZ CLNG/DRY:Z PRESV MAT:ZZ

WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:Z

UNIT CONT:ZZ OPI:A

INTRMDTE CONT:ZZ INTRMDTE CONT QTY:ZZZ

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:ZZ -ZZ Special Requirements

PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008

For Packaging follow SPI AK14369658

PARCEL POST ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND PA 17070-5002

US

FOR TRANSPORTATION ASSISTANCE SEE DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION (FDT) AWARDS SEE DLAD PROC

NOTE C20 AND

CONTRACT INSTRUCTIONS.

FREIGHT SHIPPING ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND PA 17070-5002

US

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 10 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLY/SERVICE: 0001-S00000053 CONT'D

Contractor First Article Test Contractor First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-3 for the actual quantity required to be tested.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0002 0001 - S00000053 1.000 EA $ ________________ $ ________________

FOB: DELIVERY DATE: 30 DAYS ADO

PREP FOR DELIVERY:

Not Applicable

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 0073704180 0001 N/A N/A N/A 10/07/2018

0002 N/A N/A N/A N/A N/A N/A

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 10 PAGES

CONTINUED ON NEXT PAGE

SECTION E - INSPECTION AND ACCEPTANCE

E05 PRODUCT VERIFICATION TESTING (SEP 2016)

(1) When PVT is invoked, the QAR will notify the contractor that testing will be performed. The product verification testing (PVT) will be performed at a Government-designated testing laboratory.

(a) The contractor shall not ship or deliver any material unless directed to do so in writing by the contracting officer or until notified of acceptable PVT results.

(b) PVT results will be provided in 20 working days after receipt at the Government testing facility.

(2) The QAR will select a random sample from the contractor's production lot. Selected PVT samples are to be shipped by the contractor at

Government expense with a copy of the Department of Defense DD

Form 250 and a DD Form 1222. The packaging will be marked “Product Verification Test Samples, Contract Number Lot/Item Number ."

(3) Test results will indicate one of the following:

(a) Samples that pass testing and are not destroyed during evaluation will be returned to the contractor at the Government's expense and will be included as part of the total contract quantity. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. These samples will be considered part of the contract quantity. Samples that pass testing and are not returned to the contractor will be considered part of the contract quantity for payment and delivery. The contractor will deliver the remaining lot quantity minus sample units.

(b) If samples fail testing, such failure will result in rejection of the entire contract lot from which the samples were taken. At the

Government's discretion, parts failing any test criteria may be retained and not be returned to the contractor.

E06 INSPECTION AND ACCEPTANCE AT ORIGIN (SEP 2016)

The contractor shall indicate the location where supplies will be inspected:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line-item numbers(s) (CLIN(s)):

The contractor shall indicate the location where packaging will be inspected:

( ) Same as for supplies OR

CAGE code:

Address:

Applicable to CLIN(s):

SECTION H - SPECIAL CONTRACT REQUIREMENTS

DLAD PROCUREMENT NOTE H03 - SUPPLEMENTAL FIRST ARTICLE TESTING REQUIREMENTS (SEP 2017)

SECTION I - CONTRACT CLAUSES

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 10 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

52.209-3 - FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (SEP 1989) - FAR

(a) The Contractor shall test 01 unit(s) of Lot/Item 2540-01-436-9658 as specified in this contract. At least 10 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 30 calendar days from the date of this contract to:

DLA Land - FLSEB (one copy) ATTN: FAT Monitor P O Box 3990 Columbus, OH 43218-3990 Or email: DLA.Land.and.Maritime.FAT.Notification@dla.mil marked “First Article Test Report: Contract No. XXX, Lot/Item No. 2540-01-436-9658” Within 60 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

52.209-3 - FIRST ARTICLE APPROVAL - CONTRACTOR TESTING, ALTERNATE I (JAN 1997) - FAR As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED:

PAGE OF PAGES

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED:

PAGE OF PAGES

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED:

PAGE OF PAGES

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED:

PAGE OF PAGES

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED:

PAGE OF PAGES

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED:

PAGE OF PAGES

REQUEST FOR QUOTATIONS

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

4. CERT.FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5. ISSUED BY

7. DELIVERY

9. DESTINATION

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5 ON OR

BEFORE CLOSE OF BUSINESS (Date) IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (See Continuation Sheets)

12. DISCOUNT FOR PROMPT PAYMENT

d. CALENDAR DAYS

NUMBER

PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

16. SIGNER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not useable STANDARD FORM 18 (REV. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

8. TO:

See Schedule See attached schedule to complete quote information.

f. Vendor FAX Number: Vendor Toll-Free Number: Vendor E-mail:

e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:

d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery:

c. FOB Point:

Origin Shipping Point (City, State) Destination Other (provide basis) Commercial sales of comparable quantities: Quantity ; Price ;

Customer Contained in Internal Price List No. dated , which may be examined at our facility.

Contained in Commercial Catalog or Published Price List No. dated page

b. Prices quoted are:

a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: __________________ .

Quoter must also complete the following:

NUMBER

FOB DESTINATION

OTHER

(See Schedule)

CAGE

PAGE OF

1.6 Requet for Quotation skim Standard form - RFQ Acrobat Distiller 4.0 for Windows D:20001024141244Z D:20090429133228-04'00'

REFNUMBER:
TEXTFIELD1:
SECTIONHEADER:
CURRENTPAGE_11:
PAGECOUNT_11:
CURRENTPAGE_12:
PAGECOUNT_12:
SECTION_TITLE:
Z_DEFAULTCURRENTPAGE_13:
Z_DEFAULTPAGECOUNT_13:
Z_DEFAULTCURRENTPAGE_14:
Z_DEFAULTPAGECOUNT_14:
Z_DEFAULTCURRENTPAGE_15:
Z_DEFAULTPAGECOUNT_15:
Z_DEFAULTCURRENTPAGE_16:
Z_DEFAULTPAGECOUNT_16:
ImageField2:
ImageField1:
BLK14_signature:
IS-APPL-SW:
NOT-APPL-SW:
ZSF18_REQ_NO: SPE7L1-18-Q-0268
ISSUE_DATE:
ZSF18_REQ_PR_NO: 0073704180
SPS-RATING:
AGENCY-NAME:
DELIVERY-DATE:
X-FOB:
X-OTHER:
SHIP-CITY:
SHIP-STATE:
SHIP-STREET:
SHIP-NAME:
SHIP-POSTAL-CODE:
DISC_TEN_DAYS:
DISC_TWENTY_DAYS:
DISC_THIRTY_DAYS:
DISC_DAYS:
DISC_OPN_DAYS:
RFQ-QUOTE-DATE:
RFQ_SIGNER_NAME:
RFQ_SIGNER_TEL:
RFQ_SIGNER_TITLE:
OFFEROR_NAME1:
OFFEROR_NAME2:
OFFEROR_CITY:
OFFEROR_STREET2:
OFFEROR_STREET1:
OFFEROR_STATE:
OFFEROR_ZIP4:
AP-YES:
AP-NO:
RFQ-DUE-DATE:
ZSF18_BLOCK11: See attached schedule to complete quote information.

Quoter must also complete the following:

a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .

b. Prices quoted are:

___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .

___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.

___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;

___ Customer ________________________.

___ Other (provide basis) ______________________________________ _______________________________________ .

c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .

d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.

e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:

f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________

CurrentPage:
PageCount:
LTC_ATTACHMENT2:
RICH_TEXT:
SECTIONTITLE:
BOLD_TEXT:
TEXT:

File details come from the government source that posted it.