REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
4. CERT.FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5. ISSUED BY
7. DELIVERY
9. DESTINATION
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5 ON OR
BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (See Continuation Sheets)
12. DISCOUNT FOR PROMPT PAYMENT
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
16. SIGNER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not useable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
1. REQUEST NO.
SPE7L1-18-Q-0189
2. DATE ISSUED
2018 APR 18
3. REQUISITION/PURCHASE REQUEST NO.
0068845721
RATING
DO-C9
DLA LAND AND MARITIME
LAND SUPPLY CHAIN
PO BOX 3990
COLUMBUS OH 43218-3990
USA
Buyer: Joseph Brookins PLCL3LT Tel: 614-692-9935 Email: Joseph.Brookins@dla.mil
6. DELIVER BY (Date)
313 DAYS ADO
8. TO:
c. CITY
d. STATE
b. STREET ADDRESS
a. NAME OF CONSIGNEE
e. ZIP CODE
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS
15. DATE OF QUOTATION
a. NAME (Type or Print)
AREA CODE
c. TITLE (Type or Print)d. CITY
c. COUNTY
b. STREET ADDRESS
e. STATE f. ZIP CODE
See Schedule
2018 APR 30
NUMBER
FOB DESTINATION
OTHER
(See Schedule)
CAGE
b. TELEPHONE
See attached schedule to complete quote information.
Quoter must also complete the following:
a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .
b. Prices quoted are:
___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .
___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.
___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;
___ Customer ________________________.
___ Other (provide basis) ______________________________________ _______________________________________ .
c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .
d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.
e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:
f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 25 PAGES
SPE7L1-18-Q-0189
CONTINUED ON NEXT PAGE
THIS SOLICITATION IS BEING ISSUED UNDER SPECIAL EMERGENCY PROCUREMENT AUTHORITY.
DLAD Procurement Notes are incorporated by reference, with the same force and effect as if they were in full text. The full text of a DLAD Procurement Note may be accessed electronically at http://www.dla.mil/HQ/Acquisition/Offers/ eProcurement.aspx and via 'References' on the DIBBS homepage.
EVALUATION FACTORS FOR AWARD:
Award will be made to the offeror(s) whose quote(s) conforms to the solicitation requirements and represents the best value to the Government. Past performance, offered delivery and price will be evaluated when making a comparative assessment of quotes. An award may be made to other than the lowest priced, technically acceptable, responsible offeror(s).
This solicitation is issued under the First Destination Transportation (FDT) program to reduce the cost of transportation through the use of Government-arranged transportation utilizing Government contracts and rates. If this award is for FMS or has an APO/FPO ship-to address, these instructions do not apply.
For FDT Program Transportation Requirements, see Procurement Note C16 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Manual Awards, C17 First Destination Transportation (FDT) Program – Shipments Originating from Outside the Contiguous United States, and Procurement Note C20 – Vendor Shipment Module (VSM).
Offers should be submitted based on FOB origin. For offerors whose shipments will originate from outside the contiguous United States, the offeror’s f.o.b. origin price shall include transportation to a contiguous United States location that the offeror selects based on cost-effectiveness or other variables at the offeror’s discretion.
Additional information about FDT can be found at http://www.dla.mil/LandandMaritime/Business/Selling/DLA-Land-and- Maritime-Procurement-Initiatives/FDTPI/ Offerors are encouraged to submit price break information with their quotes. Solicitations which are manually evaluated and awarded at increased quantities may be awarded based on the price break information submitted with the offeror's original quotation without further solicitation or discussion.
If waived of first article test requirements, expected delivery is 313 days or sooner.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 25 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLIES/SERVICES: 2510-01-492-0128
ITEM DESCRIPTION:
TORSION BAR, SUSPENSION
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR
SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON
REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND
NON-MANUFACTURERS)
RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ016: COMPONENT QUALIFIED PRODUCTS LISTS (QPL)/QUALIFIED MANUFACTURERS
LISTS (QML). THIS ITEM CONTAINS ONE OR MORE COMPONENTS DEFINED BY A
SPECIFICATION(S) WITH AN ASSOCIATED QUALIFIED PRODUCTS LIST (QPL) OR
QUALIFIED MANUFACTURERS LIST (QML). QUALIFICATION REQUIREMENTS IN
PROCUREMENT NOTE H02 "COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED
MANUFACTURERS LIST (QML)" APPLY.
THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH MUST MEET QPL/QML
REQUIREMENTS. BY SUBMITTING AN OFFER, THE OFFEROR AGREES TO PROVIDE
QPL/QML COMPONENTS ONLY FROM SOURCES QUALIFIED ON THE APPLICABLE
QPL(S)/QML(S).
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
FULL AND OPEN COMPETITION APPLY
"FINAL INSPECTION AND ACCEPTANCE OF THE ITEM
SHALL BE AT THE ACTUAL MANUFACTURING FACILITY.
TECHNICAL INSPECTION IS REQUIRED. THE
CONTRACTOR SHALL MAKE DRAWINGS AND TECHNICAL
INFORMATION AVAILABLE TO VERIFY THAT THE ITEM
MEETS ALL TECHNICAL REQUIREMENTS.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 25 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 2510-01-492-0128 CONT'D
COUNT, KIND, AND CONDITION INSPECTIONS ARE
NOT ACCEPTABLE. THIS NOTE TAKES PRECEDENCE OVER
MASTER SOLICITATION PART ONE PROVISIONS, NOTE 6,
QUOTATIONS BY NON-MANUFACTURERS (APR 1984,
DCSC 52.217-9C01). FINAL INSPECTION OF
PACKAGING, IF REQUIRED, MAY BE CONDUCTED
ELSEWHERE."
"ANY ITEM PREVIOUSLY TESTED BY A VENDOR
IN ACCORDANCE WITH *** QUALIFICATION***
REQUIREMENTS (FOR EXAMPLE: FAT, HIGH
SHOCK AND/OR VIBRATION TEST), STATED ON
DWG, SPECIFICATION, OR STANDARD MAY NOT
REQUIRE FURTHER TESTING BY THE SAME VENDOR
EXCEPT FOR A LATER CHANGE IN DESIGN,
MANUFACTURING PROCEDURES, OR TESTING
REQUIREMENTS. A CERTIFICATION OF
CONFORMANCE WITH PREVIOUS TEST RESULTS
ATTESTING APPLICABILITY SHALL BE
SUBMITTED FOR ITEMS PREVIOUSLY TESTED."
THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO
EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA AND
ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED THROUGH
JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE DEPARTMENTS OF
STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO INTERNATIONAL
AGREEMENTS.
TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, MILITARY CRITICAL
TECHNICAL DATA AGREEMENT, FORM IS AVAILABLE AT THE WORLD WIDE WEB
ADDRESS:
https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/defaul t.aspx
OR BY WRITING TO:
DLA LOGISTICS INFORMATION SERVICE
FEDERAL CENTER
74 WASHINGTON AVE., NORTH
BATTLE CREEK, MI 49037-3084
TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A
CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT,
DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY
THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN
EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 EXEMPTIONS OF
GENERAL APPLICABILITY, AND/OR EAR PART 740 ARE APPLICABLE.
NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL DATA ARE
REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN APPLICABLE AGREEMENT
OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO RECEIVE A COPY OF THE
EXPORT CONTROLLED TECHNICAL DATA.
NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO
THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA
UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY
PERMITTED BY DODD 5230.25.
QUALITY ASSURANCE PROVISIONS
"CONTRACTOR NOTE: COMPUTER NUMERICALLY
CONTROLLED (CNC) MACHINE AND STANDARD
INDUSTRY INSPECTION EQUIPMENT, WHICH
PROVIDE EQUAL OR GREATER ACCURACY, MAY
BE UTILIZED IN LIEU OF U.S. ARMY DESIGNED
INSPECTION EQUIPMENT, (GAGES AND FIXTURES),
DESCRIBED IN THE DATA PACKAGE PROVIDED".
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 25 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 2510-01-492-0128 CONT'D
SPECIFICATION REQUIREMENTS.
CRITICAL APPLICATION ITEM
IAW BASIC DRAWING NR 19207 12361490
REVISION NR E DTD 11/05/2014
PART PIECE NUMBER: 12361490-6
IAW REFERENCE DRAWING NR 19207 10921192
REVISION NR G DTD 10/16/1989
PART PIECE NUMBER:
IAW REFERENCE QAP 19207 12361490
REVISION NR E DTD 11/05/2014
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 19207 10920703
REVISION NR E DTD 06/24/1998
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 19207 12361490-6
REVISION NR DTD 09/29/2017
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 06085 12361490
REVISION NR D DTD 06/09/2014
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 19207 12361490-6
REVISION NR DTD 03/14/2002
PART PIECE NUMBER:
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 2510-01-492-0128 277.000 EA $ ________________ $ ________________
TORSION BAR
,SUSPENS
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: ORIGIN DELIVERY DATE: 313 DAYS ADO
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP:001 PRES MTHD:ZZ CLNG/DRY:Z PRESV MAT:ZZ
WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:Z
UNIT CONT:ZZ OPI:A
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008
PRESERVATION, PACKAGING, AND PACKAGING SHALL BE IN
ACCORDANCE WITH SPECIAL PACKAGING INSTRUCTION
(SPI) PN 12361490-6, DATED 03-14-2002.
PARCEL POST ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 25 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 2510-01-492-0128 CONT'D
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
FOR TRANSPORTATION ASSISTANCE SEE DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION (FDT) AWARDS SEE DLAD PROC
NOTE C20 AND
CONTRACT INSTRUCTIONS.
FREIGHT SHIPPING ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
Contractor First Article Test Contractor First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-3 for the actual quantity required to be tested.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0002 0001 - S00000053 1.000 EA $ ________________ $ ________________
FOB: DELIVERY DATE: 313 DAYS ADO
PREP FOR DELIVERY:
Not Applicable
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 0068845721 0001 N/A N/A N/A 09/02/2018
0002 N/A N/A N/A N/A N/A N/A
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 25 PAGES
CONTINUED ON NEXT PAGE
SECTION A - SOLICITATION/CONTRACT FORM
TECHNICAL REQUIREMENTS
THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN `R' OR AN `I' NUMBER IN SECTION B) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE
WEB AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-
ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016) FAR
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (SEP 2016)
C01 SUPERSEDED PART NUMBERED ITEMS (SEP 2016)
C02 MANUFACTURING PHASE OUT OR DISCONTINUATION OF PRODUCTION, DIMINISHING SOURCES, AND OBSOLETE
MATERIALS OR COMPONENTS (DEC 2016)
Standard Element ZC_247_9058 has no Title
SECTION E - INSPECTION AND ACCEPTANCE
E01 SUPPLEMENTAL FIRST ARTICLE EXHIBIT DISPOSITION – CONTRACTOR MAINTAINED (SEP 2016)
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) FAR
As prescribed in 46.311, insert the following clause:
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring See Schedule
[Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.
(End of Clause)
E05 PRODUCT VERIFICATION TESTING (SEP 2016)
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/46.htm
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 25 PAGES
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
CONTINUED ON NEXT PAGE
(1) When PVT is invoked, the QAR will notify the contractor that testing will be performed. The product verification testing (PVT) will be performed at a Government-designated testing laboratory.
(a) The contractor shall not ship or deliver any material unless directed to do so in writing by the contracting officer or until notified of acceptable PVT results.
(b) PVT results will be provided in 20 working days after receipt at the Government testing facility.
(2) The QAR will select a random sample from the contractor's production lot. Selected PVT samples are to be shipped by the contractor at Government expense with a copy of the Department of Defense DD
Form 250 and a DD Form 1222. The packaging will be marked “Product Verification Test Samples, Contract Number Lot/Item Number ."
(3) Test results will indicate one of the following:
(a) Samples that pass testing and are not destroyed during evaluation will be returned to the contractor at the Government's expense and will be included as part of the total contract quantity. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. These samples will be considered part of the contract quantity. Samples that pass testing and are not returned to the contractor will be considered part of the contract quantity for payment and delivery. The contractor will deliver the remaining lot quantity minus sample units.
(b) If samples fail testing, such failure will result in rejection of the entire contract lot from which the samples were taken. At the Government's discretion, parts failing any test criteria may be retained and not be returned to the contractor.
E06 INSPECTION AND ACCEPTANCE AT ORIGIN (SEP 2016)
The contractor shall indicate the location where supplies will be inspected:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line-item numbers(s) (CLIN(s)):
The contractor shall indicate the location where packaging will be inspected:
( ) Same as for supplies OR CAGE code:
Address:
Applicable to CLIN(s):
SECTION F - DELIVERIES OR PERFORMANCE
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989) FAR
52.242-15 STOP-WORK ORDER (AUG 1989) FAR
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS (APR 1984) FAR
52.247-59 F.O.B. ORIGIN - CARLOAD AND TRUCKLOAD SHIPMENTS (APR 1984) FAR
52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT - SMALL PACKAGE SHIPMENTS (JAN 1991) FAR
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 25 PAGES
SECTION H - SPECIAL CONTRACT REQUIREMENTS (CONTINUED)
CONTINUED ON NEXT PAGE
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H02 COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED MANUFACTURERS LIST (QML) (SEP 2016)
H03 SUPPLEMENTAL FIRST ARTICLE TESTING REQUIREMENTS (SEP 2016)
SECTION I - CONTRACT CLAUSES
52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015) FAR
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
FAR
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (OCT 2016) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013) DFARS
252.203-7995 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS (NOV 2016) DFARS
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016) FAR
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016) FAR
52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (OCT 2016) FAR
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016) FAR
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) FAR
52.204-20 PREDECESSOR OF OFFEROR (JUL 2016) FAR
As prescribed in 4.1804(d), insert the following provision:
(a) Definitions. As used in this provision -
“Commercial and Government Entity (CAGE) code” means -
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.
“Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
(b) The Offeror represents that it [ ] is or [ ] is not a successor to a predecessor that held a Federal contract or grant within the last three years.
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%204_18.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 25 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code:
Predecessor legal name:
(Do not use a “doing business as” name)
(End of provision)
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016) FAR
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS
252.204-7004 ALTERNATE A, SYSTEM FOR AWRD MANAGEMENT (FEB 2014) DFARS
Standard Element ZB_204_7009 has no Title
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016) DFARS
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (MAY 2016) DFARS
52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995) FAR
(a) Definition. “Qualification requirement,” as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.
(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item under this contract or simply a component of an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.
http://assist.daps.dla.mil/quicksearch/
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror's Name: __________________________________
Manufacturer's Name: _____________________________
Source's Name: __________________________________
Item Name: ______________________________________
Service Identification: ______________________________
Test Number: ____________________________________
(to the extent known)
(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 25 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.
(e) If an offeror, manufacturer, source, product or service has met the qualification requireme nt but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.
(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.
(End of clause)
52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (SEP 1989) FAR
As prescribed in 9.308-1(a) and (b), insert the following clause:
[Contracting Officer shall insert details]
(a) The Contractor shall test 3 unit(s) of Lot/Item 2510014920128 as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the
Government may witness the tests.
(b) The Contractor shall submit the first article test report within 90 calendar days from the date of this contract to [insert address of the Government activity to receive the report] marked “First Article Test Report: Contract No. , Lot/Item No. ” Within calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval.
The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The
Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%209_3.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 25 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (SEP 1989), ALT I (JAN 1997) FAR
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR SUSPENSION (OCT 2015) FAR
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A COUNTRY
THAT IS A STATE SPONSOR OF TERRORISM (OCT 2015) DFARS
52.211-5 MATERIAL REQUIREMENTS (AUG 2000) FAR
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008) FAR
52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL ITEMS) (JAN 2018) FAR As prescribed in 13.302-5(d), insert the following clause:
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.222-3, Convict Labor (Jun 2003) (E.O. 11755).
(iii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(iv) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(v) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(vi) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(vii) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note)).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (Apr 1984).
(ii) 52.232-8, Discounts for Prompt Payment (Feb 2002).
(iii) 52.232-11, Extras (Apr 1984).
(iv) 52.232-25, Prompt Payment (Jan 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (Jun 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
(vii) 52.233-1, Disputes (May 2014).
(viii) 52.244-6, Subcontracts for Commercial Items (Nov 2017).
(ix) 52.253-1, Computer Generated Forms (Jan 1991).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at $30,000 or more).
(ii) 52.222-19, Child Labor --Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126) (Applies to contracts for supplies exceeding the micro-purchase threshold.)
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2013_3.html https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html https://www.acquisition.gov/sites/default/files/current/far/html/52_233_240.html http://uscode.house.gov
/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/sites/default/files/current/far/html/52_233_240.html http://uscode.house.gov/ https://www.acquisition.gov/sites/default/files/current/far/html/52_232.html https://www.acquisition.gov/sites/default/files/current/far/html/52_232.html https://www.acquisition.gov/sites/default/files/current/far/html/52_232.html https://www.acquisition.gov/sites/default/files/current/far/html/52_232.html https://www.acquisition.gov/sites/default/files/current/far/html/52_232.html https://www.acquisition.gov/sites/default/files/current/far/html/52_232.html https://www.acquisition.gov/sites/default/files/current/far/html/52_233_240.html https://www.acquisition.gov/sites/default/files/current/far/html/52_241_244.html https://www.acquisition.gov/sites/default/files/current/far/html/52_248_253.html https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html http://uscode.house.gov/ https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 25 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (May 2014) (41 U.S.C. chapter 65) (Applies to supply contracts over $15,000 in the United States, Puerto Rico, or the U.S. Virgin Islands).
(iv) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212) (applies to contracts of $150,000 or more).
(v) 52.222-36, Equal Employment for Workers with Disabilities (Jul 2014) (29 U.S.C. 793) (Applies to contracts over $15,000, unless the work is to be performed outside the United States by employees recruited outside the United States.) (For purposes of this clause, “United States” includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S.
Virgin Islands, and Wake Island.)
(vi) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212) (Applies to contracts of $150,000 or more).
(vii) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(viii)(A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O 13627) (Applies to all solicitations and contracts).
(B) Alternate I (Mar 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).
(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))
(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (May 2011) (E.O. 13423) (Applies to services performed on Federal facilities).
(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).
(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP)) will be --
(A) Delivered;
(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;
(C) Furnished by the Contractor for use by the Government; or
(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).
(xv) 52.223-20, Aerosols (Jun 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).
(xvi) 52.223-21, Foams (Jun 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.
(xvii) 52.225-1, Buy American --Supplies (May 2014) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold and the acquisition --
(A) Is set aside for small business concerns; or
(B) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $25,000).
(xviii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792) (Applies to contracts greater than $25,000 that provide for the provision, the service, or the sale of food in the United States).
(xix) 52.232-33, Payment by Electronic Funds Transfer --System for Award Management (Jul 2013) (Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) database as its source of EFT information).
(xx) 52.232-34, Payment by Electronic Funds Transfer --Other than System for Award Management (Jul 2013) (Applies when the https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+200+2++%2838%29%20%20AND%20%28%2838%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+2+78++%2829%29%20%20AND%20%28%2829%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+200+2++%2838%29%20%20AND%20%28%2838%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html http://uscode.house.gov/ https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html http://uscode.house.gov/ https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.a
cquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html http://uscode.house.gov/ https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2023_2.html https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html http://uscode.house.gov/ https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html http://uscode.house.gov/ https://www.acquisition.gov/sites/default/files/current/far/html/52_232.html https://www.acquisition.gov/sites/default/files/current/far/html/52_232.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 25 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information).
(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. App. 1241) (Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d)).
(2) Listed below are additional clauses that may apply:
(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (Jun 2016) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.
(ii) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) (Applies to contracts over $35,000).
(iii) 52.211-17, Delivery of Excess Quantities (Sept 1989) (Applies to fixed-price supplies).
(iv) 52.247-29, F.o.b. Origin (Feb 2006) (Applies to supplies if delivery is f.o.b. origin).
(v) 52.247-34, F.o.b. Destination (Nov 1991) (Applies to supplies if delivery is f.o.b. destination).
(c) FAR . This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
[Insert one or more Internet addresses]
(d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its postacceptance rights --
(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(e) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(f) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the Government, using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.
(g) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(h) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997) FAR
52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) FAR
https://www.acquisition.gov/sites/default/files/current/far/html/52_247.html http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t45t48+351+1++%2846%29%20%20AND%20%28%2846%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html https://www.acquisition.gov/sites/default/files/current/far/html/52_207_211.html https://www.acquisition.gov/sites/default/files/current/far/html/52_207_211.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 25 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
As prescribed in 19.309(c), insert the following clause:
(a) Definitions. As used in this clause.
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.