SPE4AX18R0032.pdf
PDF 245 KB Posted
- Attached to
- 54H60 and 54460 Propeller Systems Federal contract opportunity
- Solicitation number
- SPE4AX18R0032
- Issued by
- Defense Logistics Agency Aviation
About this file
RFP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Updated_Amended_Attachment_1_pricing_sheet.xlsx | XLSX spreadsheet | |
| Copy_of_SPE4AX-18-R-003201_Solicitation_Questions.xlsx | XLSX spreadsheet | |
| Copy_of_Hub_and_Blade_Corrected_Surge_Tab.xlsx | XLSX spreadsheet | |
| RFP_amended_R003201_Final-Master.docx | DOCX document | |
| Revised_Pricing_Worksheet_for_Hub_and_Blade_3-26-19_Master_attch_1.xlsx | XLSX spreadsheet | |
| Hub_and_Blade_client_questionnaire_ATTACH_2.docx | DOCX document | |
| Answers_to_SC_RFP_Qeustions.docx | DOCX document | |
| Copy_of_Copy_of_SPE4AX-18-R-0032__Attachment_1_revised.xlsx | XLSX spreadsheet | |
| Hub_and_Blade_client_questionnaire_attch_2.docx | DOCX document | |
| SPE4AX-18-R-0032__Attachment_1.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7. ISSUED BY
DLA AVIATION
8000 JEFFERSON DAVIS HIGHWAY
RICHMOND, VA 23297-5100
CODE
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and one (1) copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in DLA Reception Area, Bldg. 33 until 2:00 PM local time 10/22/2018
(Hour) (Date) CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME
CHRIS HUTNAN
B. TELEPHONE (NO COLLECT CALLS) C. E-MAIL ADDRESS
chris.hutnan@dla.mil
AREA CODE
NUMBER
EXT.
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
A SOLICITATION/CONTRACT FORM 2
I CONTRACT CLAUSES 16-26
B SUPPLIES OR SERVICES AND PRICES/COSTS 3 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
C DESCRIPTION/SPECS./WORK STATEMENT 4-7 J LIST OF ATTACHMENTS 27
D PACKAGING AND MARKING 8 PART IV - REPRESENTATIONS AND INSTRUCTIONS
E INSPECTION AND ACCEPTANCE 9
K REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS 28
F DELIVERIES OR PERFORMANCE 10-12
G CONTRACT ADMINISTRATION DATA 13
L INSTRS., CONDS., AND NOTICES TO OFFERORS 29-40
H SPECIAL CONTRACT REQUIREMENTS 14-15
M EVALUATION FACTORS FOR AWARD 41-43
OFFER (Must be fully completed by offeror)
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
AMENDMENT NO. DATE AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFER-
OR
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER 15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AREA CODE NUMBER EXT.
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:
10 U.S.C. 2304 (c) 41 U.S.C. 253 (c)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
24. ADMINISTERED BY (If other than Item 7) 25. PAYMENT WILL BE MADE BY CODE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33 (REV,. 9-97)
Prescribed by GSA - Far (48 CFR) 53.214 (c)
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER RATING
UNDER DPAS (15 CFR 7900)
PAGE OF PAGES
1 43
2. CONTRACT NUMBER 3. SOLICITATION NUMBER
SPE4AX-18-R-0032
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
5. DATE ISSUED
08/13/2018
6. REQUISITION/PURCHASE NUMBER
SPE4AX 8. ADDRESS OFFER TO (If other than item 7) mailto:chris.hutnan@dla.mil
CONTINUED ON NEXT PAGE
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING
CONTINUED SPE4AX-18-R-0032
SECTION A
SOLICITATION
A.1 INTRODUCTION
A.1.1 This is a solicitation for Indefinite Delivery Indefinite Quantity (IDIQ) Firm-Fixed-Price (FFP) contract in accordance with FAR 12 for Warner Robins Air Logistics Complex (WR-ALC) Propeller (Prop) Shop and worldwide (WW) Hub & Blade supply support with associated supply chain management.
A.1.2 The requirement herein is a 100% small business set-aside. One award will be made on an All or None basis. The resulting contract will be an FFP for the 498 NSNs. These NSNs and Quality Matrix are identified in Attachment 1.
A.1.3 The contract term specifies a base period of three (3) years and two (2) one (1) year option periods for a total of five (5) years.
A.2 OVERVIEW
A.2.1 This solicitation and resulting contract is for supply support of the 54H60 Propeller.
A.2.2 The population shall be supported as DLA Direct.
A.3 ORDERING PROCEDURES
A.3.1 Order placement will be via Electronic Data Interchange (EDI) transmissions in accordance with American National Standards Institute (ANSI), ANSI X12 Standards through a registered Value Added Network (VAN). Issuance of an EDI transmission from the Contracting Officer constitutes a binding order and the Contractor is required to commence performance upon receipt of a binding order.
A.4 FACSIMILE PROPOSALS
FACSIMILE proposals will NOT be accepted.
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 The solicitation is for 498 NSNs. The Pricing Spreadsheet is provided as Attachment 1.
The spreadsheet provides the recommended delivery, represented in calendar days, for each NSN on this solicitation. For each NSN, Offeror is to provide pricing for the base period and all option periods. Attachment 1 identifies the NSNs and the annual demand quantity for the base and option periods. The quantity estimates are based upon the best projections available at the time of this solicitation and are subject to change.
B.1.1 Offerors shall use the Best Estimated Quantities (BEQ) identified in the Attachment 1 spreadsheet in order to establish unit prices for the Hub & Blade population of items.
B.1.2 Offerors shall note, however, the Hub & Blade NSN population and data is subject to change. The BEQ is provided to assist offerors in analysis and proposal development only. The government neither warrants nor guarantees the offeror will realize the stated BEQ or historical demands during contract performance.
B.1.3 Award will be made on an “All” or “None” basis for a 100% set aside.
Offerors failing to provide pricing for all NSNs may be rejected from award consideration.
B.2 This solicitation is a 100% small business set aside, Firm Fixed Price, in accordance with FAR Part 12 Acquisition of Commercial Items.
B.3 Offerors shall submit proposed pricing for each pricing period in accordance with the solicited pricing structure.
B.4 Surge and Sustainment (S&S) NSNs are identified in Attachment 1 and shall be priced as a FFP unit price for each contract year.
B.5 All contract prices established by award of the solicitation may be made publically available. By submitting a proposal, the resulting Offeror agrees to publication of its Base Year unit prices outlined herein.
SECTION C
DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
C.1 This requirement is for supply support of the 54H60 Propeller.
C.2 The Offeror shall maintain a quality system that meets the requirements of the most recent
AS9100.
C.3 The Offeror shall ensure the material conforms to the requirements at the Purchase Order Text (POT). POT information will be provided quarterly to the Awardee for all base and option periods.
C.4 The government may unilaterally delete items from the Contract after providing a 30 day advance notice to the Contractor. Examples would be no demand items or obsolete items.
C.5 Order placement shall be by EDI transmissions in accordance with ANSI X12 Standards through a registered Value Added Network (VAN). An EDI transmission from the Contracting Officer constitutes a binding order; the Contractor is required to commence performance upon receipt of a binding order
C.5.1 The following three EDI transactions are required for the purpose of transmitting Delivery Orders and Tracking contractor performance:
850 Purchase/Delivery Order 856 Shipment Notice Manifest 997 Functional Acknowledgement
C.5.2 The 850 is processed through the issuing DLA Supply Chain; the 856 identifies the order shipment date and the total quantity; and, the 997 indicates the Contractor received the order, thus establishing the order date.
C.5.3 The Contractor is required to use (or upgrade to) the latest EDI transactions, as they become available.
C.6 Procurement Notes. Full-text of each note can be found at:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
C01 Superseded Part Number Items
C02 Manufacturing Phase-Out or Discontinued of Production, Diminishing Sources, and Obsolete Materials or Components
C03 Contractor Retention of Supply Chain Traceability Documentation
C04 Unused Former Government Surplus Property
To be considered for award, the offeror must complete and submit the following representation with their offer. Additional supporting documentation to demonstrate the surplus material offered was previously owned by the Government and meets solicitation requirements must be provided within 24 hours of request by the contracting officer.
(1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety. Yes __ No __ The material conforms to the technical requirements cited in the solicitation (e.g., Commercial and Government Entity (CAGE) Code and part number, specification, etc.). Yes __ No __ The material conforms to the revision letter/number, if any is cited. Yes __ No __ Unknown __ If No, the revision does not affect form, fit, function, or interface. Yes__ No __ Unknown __ The material was manufactured by:
(Name): ______________________________________________________________________ (Address): _____________________________________________________________________
(2) The offeror currently possesses the material Yes __ No __ If yes, the offeror purchased the material from a Government selling agency or other source.
Yes __ No __ If yes, provide the following:
Government Selling Agency: ______________________________________________________ Contract Number: _______________________________________________________________ Contract Date: (Month, Year): _____________________________________________________ Other Source: __________________________________________________________________ Address: ______________________________________________________________________ Date Acquired: (Month/Year) _____________________________________________________
(3) The material has been altered or modified. Yes __ No __ If Yes, the offeror must provide the name of the company that performed the alteration or modification and attach or forward to the contracting officer a complete description of the alterations or modifications.
(4) The material has been reconditioned. Yes __ No __ If Yes, (i) the price offered includes the cost of reconditioning /refurbishment. Yes __ No __; and (ii) the offeror must provide information on the company that reconditioned the material with the certifications and attach or forward to the contracting officer a complete description of any work done or to be done, including the components to be replaced and the applicable rebuild standard.
The material contains cure-dated components. Yes __ No __ If Yes, (i) the price includes replacement of cure-dated components. Yes __ No __; and (ii) provide cure date to the contracting officer.
(5) The material has data plates attached. Yes __ No __ If Yes, the offeror must state below all information contained thereon, or forward a copy or facsimile of the data plate to the contracting officer.
(6) The offered material is in its original package. Yes __ No __ If yes, the offeror has stated below all original markings and data cited on the package; or has attached or forwarded to the contracting officer a copy or facsimile of original package markings:
Contract Number
NSN___________________________________________________________________________
CAGE
Code__________________________________________________________________________ Part Number ________________________________________________________________________ Other Markings/Data___________________________________________________________
(7) The offeror has supplied this same material (National Stock Number) to the Government before.
Yes __ No __
If Yes, (i) the material being offered is from the same original Government contract number as that provided previously. Yes __ No __; and (ii) state below the Government Agency and contract number under which the material was previously provided:
Agency _________________________________________________________________________ Contract Number_________________________________________________________________
(8) The material is manufactured in accordance with a specification or drawing. Yes __ No __ If Yes, (i) the specification/drawing is in the possession of the offeror. Yes __ No __; and (ii) the offeror has stated the applicable information below, or forwarded a copy or facsimile to the contracting officer.
Yes __ No __ Specification/Drawing Number _____________________________________________________ Revision (if any) _________________________________________________________________ Date___________________________________________________________________________
(9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects. Yes __ No __ If Yes, (i) material has been re-preserved. Yes __ No __; (ii) material has been repackaged. Yes __ No __; (iii) percentage of material that has been inspected is ____%; and/or (iv) number of items inspected is _______; and (v) a written report was prepared. Yes __ No __; and if Yes, the offeror has attached the written report or forwarded it to the contracting officer. Yes__ No__ The offeror agrees that in the event of award and notwithstanding the provisions of the solicitation, Inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection.
The offeror has attached or forwarded to the contracting officer one of the following, to demonstrate that the material being offered was previously owned by the Government (offeror check which one applies):
___ For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA Disposition Services Form 1427, Notice of Award, Statement and Release Document.
___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material.
___ When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and Government entity (CAGE) code and part number, and original contract number. (This information has already been provided in paragraph (c)(6) of this clause. Yes __ No __.)
___ When none of the above are available, other information to demonstrate that the offered material was previously owned by the Government. Describe and/or attach.
This only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer’s overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the DLAD procurement note L04, Offers for Part Numbered Items.
If requested by the contracting officer, the offeror shall furnish sample units, in the number specified, to the contracting officer or to another location specified by the contracting officer, within 10 days after the contracting officer's request. The samples will be furnished at no cost to the Government.
All such samples not destroyed in evaluation will be returned at the offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used. End items furnished under any contract award to the offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted.
In the event of award, the contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order. The surplus material to be furnished must meet the requirements of the current contract or order, whether or not the material met Government requirements in existence at the time the material was initially manufactured or sold to the Government. If higher-level contract quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract.
C06 Surge and Sustainment (S&S) Requirements (FEB 2017)
C07 Warstopper Program Material Buffer Availability
C14 Repackaging or Relabeling to Correct Deficiencies
C15 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Automated Awards
C16 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Manual Awards
C17 First Destination Transportation (FDT) Program – Shipments Originating
C20 Vendor Shipment Module (VSM)
C21 Shipping Instruction Request (SIR)
SECTION D PACKAGING AND MARKING
D.1 Commercial packaging in accordance with American Society for Testing and Materials (ASTM), ASTM D-3951 is acceptable; however, packages shall be prepared in accordance with labeling requirements of MIL-STD-129P.
D.2 Clauses/Provisions
252.211-7004 Alternate Preservation, Packaging, and Packing
252.211-7006 Passive Radio Frequency Identification
SECTION E INSPECTION AND ACCEPTANCE
E.1 Inspection and Acceptance shall be Destination. Items designated as Critical Safety Items Inspection/Acceptance shall be Origin. See Attachment 1 Quality Matrix.
E.2 Clauses/Provisions
52.246-2 Inspection of Supplies – Fixed Price
52.246-11 Higher Level Contract Quality Requirement
52.246-7000 Material Inspection and Receiving Report
E.3 Procurement Notes
E02 Supplemental First Article Exhibit Disposition – Government Maintained
E07 Evaluation Factor for Origin Inspection (JAN 2018)
SECTION F
DELIVERIES OR PERFORMANCE
F.1 The award shall be FOB Origin – Inspection/Acceptance Destination. Items designated as Critical Safety Items shall be Inspection/Acceptance Origin. Refer to Attachment 1 Quality Matrix.
F.2 Contractor shall consolidate shipments to the maximum extent practicable.
F.3 The contractor shall maintain comprehensive records of all shipments including the transportation control number, the date of shipment, weights, destinations, order number, and transportation contract shipped against.
F.4 On-Time Delivery (OTD) Metric
F.4.1 DLA shall evaluate supplier performance in achieving contractual Production Lead Times (PLT) through an On-Time Delivery (OTD) metric. OTD will be measured on total orders received during each contract performance period (12 months).
F.4.2 Each order will be evaluated to determine if the contractor met the contractual
PLT.
F.4.3 OTD is measured by delivery order due date and ship date.
F.4.4 The OTD percentage will be monitored monthly and reported quarterly. DLA will provide monthly, and year-end OTD percentages for review.
F.4.5 The supplier shall be liable to DLA for payment of consideration in the amounts listed below where PLT is delayed beyond the contract time, as adjusted for time extension provided by mutual agreement of the Parties.
F.4.6 DLA will assess a disincentive for OTD, yearly, for the total percent of orders that do not meet the contractual PLT per the below table:
OTD
Category
OTD
Performance Disincentive Percentage
A 90% and Above
0%
B 89% - 89.9% -1% C 88% - 88.9% -2% D 87% - 87.9 % -3% E 86% - 86.9% -4%
F 85.9% and Below
-5%
F.4.7 The calculation of the OTD disincentive fee is as follows:
OTD Disincentive Fee = Total number of orders on time/Total number of orders. For example:
Total number of orders on time = 85 Total number of orders = 100 OTD disincentive fee = -5% (100/85= 85%)
Category OTD Performance Value of Orders
Disincentive
Value of Disincentive
A 90% and Above
$100,000 0% $0
B 89% $100,000 -1% ($1,000) C 88% $100,000 -2% ($2,000) D 87% $100,000 -3% ($3,000) E 86% $100,000 -4% ($4,000) F 85% and Below $100,000 -5% ($5,000)
F.5 The aggregate disincentive will be applied against open order(s) via modification.
F.6 The Contracting Officer will provide a monthly metric report to the contractor within fourteen
(14) calendar days from the end of the preceding month. The contractor will have fourteen (14) calendar days to challenge individual delivery orders or the calculations for the metrics in writing to the Contracting Officer. The challenge shall include the rationale and any supporting evidence. The Contracting Officer will approve/disapprove the challenge request within 14 calendar days after receipt. Failure of the contractor to notify the Contracting Officer within the specified time frame will result in the monthly metric being deemed to be accurate and correct.
The appropriate credit based on the challenge result will be issued by DLA Aviation within thirty
(30) days. In determining cause of delay, the contracting officer must consider the information provided by awardee; however, the contracting officer makes the final determination, in accordance with 52.233-1 (May 2014).
F.7 Clauses/Provisions
52.211-8 (Jun 1997)
52.211-16 Variation in Quantity
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) of this clause.
(b) The permissible variation shall be limited to:
______0 (+/-)__ Percent increase
_____0 (+/-)____ Percent decrease
This increase or decrease shall apply to _all items___.*
52.211-17 Delivery in Excess Quantity
52.247-30 FOB Origin, Contractor’s Facility
52.247-58 Loading, Blocking and Bracing of Freight Car Shipments
52.247-59 FOB Origin – Carload and Truckload Shipments
SECTION G
CONTRACT ADMINISTRATION
G.1 The administration of the contract will require maximum coordination between the Government and the Contractor.
G.2 Clauses/Provisions
252.232-7006 Wide Area Workflow Payment Instructions
SECTION H
SPECIAL CONTRACT REQUIRMENTS
H.1 DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA)
The solicitation provides for the utilization of DCMA for inspection & acceptance, transportation coordination, and other functions delegated by the Contracting Officer, as appropriate.
H.2 Procurement Notes. Full-text of each note can be found at:
H02 Component Qualified Products List (QPL) / Qualified Manufacturers List (QML)
H03 Supplemental First Article Testing Requirements
(1) If there is not a separate contract line item number (CLIN) for FAT, production CLIN pricing shall include all costs and risk associated with completion of the FAT requirement.
(2) If there is a separate FAT CLIN, the FAT CLIN pricing shall include all costs and risk associated with completion of the FAT requirement; if no FAT CLIN pricing is proposed, no payment will be made for any costs associated with FAT. Unit pricing shall be based solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.
(3) The total award price will be used in selecting the best value offer from among all eligible offerors.
However, to be eligible for award, the FAT CLIN (unless waived) and unit price CLIN(s) must each be determined to be a fair and reasonable price and, if set-aside under FAR part 19, a fair market price.
Additionally, the FAT CLIN (and if separately priced, any CLIN(s) for first articles) shall not be materially unbalanced in relation to unit price CLIN(s) for production quantities. In the event that an offeror receives a waiver of the FAT requirement, the FAT CLIN price for the waived source shall be deducted in determining the total award price.
(4) Waivers. The contractor may submit a request for FAT waiver to the contracting officer. The Government reserves the right to waive the FAT requirement when all the following criteria are met:
(a) Source has manufactured and delivered the product or similar product within the last five (5) years, or within the last three (3) years for critical safety items. The contractor shall provide the following supportable information:
(i) Contract Number(s), Date(s), and Issuing Government Agency or Agencies.
(ii) Item previously furnished, identified by part number, type, model number, etc.
(iii) Engineering control document/change number of item previously furnished.
(iv) There have been no changes to manufacturing processes, tooling, or locations.
(b) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).
(c) Item supplied will be of same design and manufactured by same method at same facilities as product or similar product previously furnished and accepted under subparagraph (4)(a).
(5) For test report preparation and delivery of contractor FAT, utilize data item description DI- NDTI80809B report format. Mark the test report with the following: “First article test report – Contract number: [insert contract number] and lot/item number: [insert lot/item number]. Present the test report to the QAR for review. Forward the QAR signed FAT Report, accompanied by the DD Form 250 and a contractor certification that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:
(a) For awards issued by DLA Aviation; or DLA Troop Support Clothing and Textile (C&T), Construction and Equipment, Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, or Block 9 of SF 1449 award.
(b) For awards issued by DLA Land (SPE7L), submit the report to the following address: DLA Land – FLSEB, ATTN: FAT Monitor, P O Box 3990, Columbus, OH 43218-3990, or email to:
Land.FAT.Monitor@dla.mil.
(c) For awards issued by DLA Maritime (SPE7M), submit the report to the following address: DLA Maritime – FMSE, ATTN: FAT Monitor, P O Box 3990, Columbus, OH 43218-3990, or email to:
maritime.fat.monitor@dla.mil.
(d) For awards issued by DLA Troop Support Industrial Hardware, submit the report to the following address: DLA Troop Support, Attention: First Article Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia, Pennsylvania 19111. Preferred electronic submissions: Hardware FAT Monitor at DLAHardwareFATMonitor@dla.mil.
(6) When Government testing is required, provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to Government for FAT, to accommodate in-process verification and/or final inspection by the QAR.
(7) For unit preparation and delivery of Government First Article orders, ship the units and completed DD Form 250 report to the test facility specified in paragraph (a) of FAR clause 52.209-4. Prepare the shipping container(s) by marking the external packages in bold letters, “First Article Exhibits – Do Not Post to Stock," adjacent to the MIL-STD-129R identification markings. Use a hard copy of the completed DD Form 250 as a packing list, in accordance with MIL-STD 129R, paragraph 5.11, Packing lists and documentation. The interior package shall include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and return shipping information. Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). Send an email with subject titled “Notification of Test Exhibits [insert Government Lab DODAAC]” to the corresponding address below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents.
Attach a copy of the DD Form 250 and Invoicing, Receipt, Acceptance and Property Transfer (iRAPT) Receiving Report documenting the QAR inspection.
(a) DLA Land & Maritime – DSCCProdVerif@dla.mil
(b) DLA Aviation – DSCR.Test&EvaluationOffice@dla.mil
(8) If Government FAT units are conditionally approved or disapproved, the Government shall take action in accordance with FAR 52.209-4. At the Government’s discretion, disapproved FAT units sent to the Government may be returned to the contractor, if the contractor submitted the return address and shipping account for payment.
H04 Sourcing for Critical Safety Items
SECTION I CONTRACT
CLAUSES
I.1 INCORPORATED BY REFERENCE. Except for provisions and clauses prescribed in FAR 52.107, any provision or clause that can be accessed electronically is incorporated by reference to include DLA Directive (DLAD) Procurement (Proc) Notes and DLA Aviation Acquisition Notices (DAANs). However, upon request, the contracting officer shall provide the full text of any provision or clause incorporated by reference.
I.2 Clauses/Provisions
252.201-7000 Contracting Officer's Representative (December 1991)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP
2011)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)
252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)
252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(NOV 2011)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)
52.204-13 System for Award Management Maintenance (Oct 2016)
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION
CONTROLS (OCT 2016)
252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY
CONTRACTOR REPORTED CYBER INCIDENT INFORMATION (OCT 2016)
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (OCT 2016)
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC
1991)
52.209-1 Qualification Requirements (Feb 1995)
(a) Definition. “Qualification requirement,” as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.
(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item under this contract or simply a component of an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.
(Name) _____________________________________
(Address) ___________________________________
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror’s Name _______________________________
Manufacturer’s Name __________________________
Source’s Name _______________________________
Item Name __________________________________
Service Identification __________________________
Test Number ______________________________ (to the extent known)
(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government’s best interests.
(e) If an offeror, manufacturer, source, product or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government’s interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.
(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.
(End of Clause)
52.209-3 First Article Approval -- Contractor Testing (Sep 1989)
(a) The Contractor shall test _(sited on individual orders)____ unit(s) of Lot/Item _____as specified in this contract. At least _____ calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within _____ calendar days from the date of this contract to _____ marked “First Article Test Report: Contract No. _______, Lot/Item No. _______” Within _____ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(End of Clause)
52.209-3 Alternate I (Jan 1997). As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause: (i) The Contractor shall produce both the first article and the production quantity at the same facility
52.209-4 First Article Approval -- Government Testing (Sep 1989)
(a) The Contractor shall deliver (sited on individual orders)___unit(s) of Lot/Item ___ within ____ calendar days from the date of this contract to the Government at ______ for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within _____ calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor --
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor’s expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/FAR09.DOC#b93081
Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(End of Clause)
52.209-4 Alternate I (Jan 1997) As prescribed in 9.308-2(a)(2) and (b)(2), add the following paragraph (j) to the basic clause: (j) The Contractor shall produce both the first article and the production quantity at the same facility.
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY
THE GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (OCT
2015)
252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011)
(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item. The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:
See Attachment 1‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗‗
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)
252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND
STANDARDS (NOV 2005)
252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS (SEP 2010)
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/FAR09.DOC#b93082
52.212-4 Contract Terms and Conditions -- Commercial Items (Jan 2017)
52.212-4 ALT I (Jan 2017)
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (Jul 2018)
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (Oct 2010)
252.215-7012 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA
(JAN 2018)
The Offeror shall submit the cost portion of the proposal via the following electronic media: Electronic Spreadsheet.
52.216-19 Order Limitations (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than __No Minimum____ the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor --
(1) Any order for a single item in excess of No Maximums;
(2) Any order for a combination of items in excess of No Maximums; or
(3) A series of orders from the same ordering office within ________No maximums_____ days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216- 21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within __No maximums___ days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 Indefinite Quantity (Oct 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after _____will be annotated on award__________ .
252.216-7000 ECONOMIC PRICE ADJUSTMENT—BASIC STEEL, ALUMINUM, BRASS, BRONZE, OR
COPPER MILL PRODUCTS (MAR 2012)
252.216-7006 ORDERING (MAY 2011)
52.217-9 Option to Extend the Term of the Contract (Mar 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least _60__ days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed ________5___ (years).
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011)
252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM—BASIC (DEC 2017)
252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (DEC 2017)
252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)
252.225-7025 RESTRICTION ON ACQUISITION OF FORGINGS (DEC 2009)
252.225-7047 EXPORTS BY APPROVED COMMUNITY MEMBERS IN PERFORMANCE
OF THE CONTRACT (JUNE 2013)
252.225-7048 EXPORT CONTROLLED ITEMS (JUNE 2013)
252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (SEP 2004)
52.227-1 Authorization and Consent (Dec 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Dec. 2007)
52.232-17 Interest (May 2014)
52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(JUN 2012)
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
52.233-1 Disputes (May 2014) Alternate I (Dec 1991)
252.239-7001 INFORMATION ASSURANCE CONTRACTOR TRAINING AND CERTIFICATION (JAN
2008)
52.242-13 Bankruptcy (Jul 1995)
252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
(a) The amount of any request for equitable adjustment to contract terms shall accurately reflect the contract adjustment for which the Contractor believes the Government is liable. The request shall include only costs for performing the change, and shall not include any costs that already have been reimbursed or that have been separately claimed. All indirect costs included in the request shall be properly allocable to the change in accordance with applicable acquisition regulations.
(b) In accordance with 10 U.S.C. 2410(a), any request for equitable adjustment to contract terms that exceeds the simplified acquisition threshold shall bear, at the time of submission, the following certificate executed by an individual authorized to certify the request on behalf of the Contractor:
I certify that the request is made in good faith, and that the supporting data are accurate and complete to the best of my knowledge and…