SPE4A618Q0931.PDF
PDF 419 KB Posted
- Attached to
- CONDUIT, NONMETALLIC Federal contract opportunity
- Solicitation number
- SPE4A618Q0931
- Issued by
- Defense Logistics Agency Aviation
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
4. CERT.FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5. ISSUED BY
7. DELIVERY
9. DESTINATION
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5 ON OR
BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (See Continuation Sheets)
12. DISCOUNT FOR PROMPT PAYMENT
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
16. SIGNER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not useable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
1. REQUEST NO.
SPE4A6-18-Q-0931
2. DATE ISSUED
2018 APR 12
3. REQUISITION/PURCHASE REQUEST NO.
0073762398
RATING
DO-C9
DLA AVIATION
ASC COMMODITIES DIVISION
8000 JEFFERSON DAVIS HIGHWAY
RICHMOND VA 23297
USA
Buyer: MARY STAKES PARFM42 Tel: 804-279-5329 Fax: 804-279-5155 Email: MARY.STAKES@DLA.MIL
6. DELIVER BY (Date)
SEE SCHEDULE
8. TO:
c. CITY
d. STATE
b. STREET ADDRESS
a. NAME OF CONSIGNEE
e. ZIP CODE
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS
15. DATE OF QUOTATION
a. NAME (Type or Print)
AREA CODE
c. TITLE (Type or Print)d. CITY
c. COUNTY
b. STREET ADDRESS
e. STATE f. ZIP CODE
See Schedule
2018 APR 26
NUMBER
FOB DESTINATION
OTHER
(See Schedule)
CAGE
b. TELEPHONE
See attached schedule to complete quote information.
Quoter must also complete the following:
a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .
b. Prices quoted are:
___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .
___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.
___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;
___ Customer ________________________.
___ Other (provide basis) ______________________________________ _______________________________________ .
c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .
d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.
e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:
f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 28 PAGES
SPE4A6-18-Q-0931
CONTINUED ON NEXT PAGE
DAAN-09-06
Critical Safety Items (September 2016)
CONDITIONS FOR EVALUATION AND ACCEPTANCE OF OFFERS FOR CRITICAL SAFETY ITEMS
(a) Definitions.
"Actual manufacturer" means an individual, activity, or organization that performs the physical fabrication processes that produce the deliverable part or other items of supply for the Government. The actual manufacturer must produce the part in-house. The actual manufacturer may or may not be the design control activity.
"Approved source" means a prime contractor or the actual manufacturer(s) cited in the procurement item description (PID). It does not include design control activities with no manufacturing capability.
"Critical safety item" (CSI) means a part, assembly, installation, or production system with one or more critical characteristics that, if not conforming to the design data or quality requirements, would result in an unsafe condition that could cause loss of, or serious damage to, the end item or major components, loss of control, or serious injury or death to personnel.
"Design control activity" means a contractor or Government activity having responsibility for the design of a given part, and for the preparation and currency of engineering drawings and other technical data for that part. The design control activity may or may not be the actual manufacturer.
"Exact product" and "alternate product" are defined in the provision at DLAD 52.217-9002 or Procurement Note L04, Conditions for Evaluation and Acceptance of Offers for Part Numbered Items.
"Prime contractor" means a contractor having responsibility for design control and/or delivery of a system/equipment such as aircraft, engines, ships, tanks, vehicles, guns and missiles, ground communications and electronics systems, and test equipment.
"Rebranding" means remarking, re-labeling, repackaging, or otherwise obscuring the marking of the approved source cited in the PID (i.e., the prime contractor or actual manufacturer).
(b) The item being acquired is a critical safety item (CSI). Given their vital importance and the catastrophic consequences that can result if they fail, procurement of these items requires the highest standards of oversight and verification.
(c) This clause applies only to offers of "exact product." Offers of "alternate product" will be evaluated in accordance with the clause at DLAD 52.217-9002 or Procurement Note M06. Offerors of Government surplus material must comply with the requirements in the clause at DLAD 52.211-9000 or Procurement Note C04 in addition to this clause, and surplus offers will be evaluated in accordance with the provision at DLAD 52.211-9003 or Procurement Note M05.
(d) If the Offeror is the prospective awardee and is not currently an approved source cited in the procurement item description (PID) on the schedule page of this solicitation, the Offeror will be requested by the Contracting Officer to provide documented evidence prior to award sufficient to establish that the item being offered is (or will be) the exact item cited in the PID and is (or will be) manufactured by an approved source cited in the PID, modified (if necessary) to conform to any additional requirements set forth in the PID, and is (or will be) manufactured by or under the direction of an approved source cited in the PID. Additionally, if the Offeror manufactures the offered item for an approved source cited in the PID, evidence of approval and acceptance by the approved source will be required.
Evidence must include the following at a minimum, plus whatever additional evidence the Contracting Officer determines necessary to sufficiently establish the identity of the item and its manufacturing source:
(1) If offered item(s) are "not in stock" or "not yet manufactured" --
(i) A copy of Offeror's Request for Quotation to approved source cited in PID; and
(ii) An original, hard copy of quotation received by Offeror from approved source cited in PID; or other verifiable documentation of quotation. (If Offeror is unable to provide this documentation to the Contracting Officer prior to award, it must be provided to the Quality Assurance Representative (QAR) for examination at time of source inspection.)
(iii) For offers of surplus material, a completed 52.211-9000 or Procurement Note C04 with supporting documentation.
(2) If offered item(s) are "shipped" or "in stock" --
(i) A copy of invoice on approved source's letterhead. (Invoice must identify exact item cited in PID and a quantity sufficient to satisfy the solicitation requirement.); or
(ii) A copy of packing slip which accompanied shipment from approved source to Offeror. (Packing slip must identify exact item cited in PID and a quantity sufficient to satisfy the solicitation requirement; or
(iii) For offers of surplus material, a completed 52.211-9000 or Procurement Note C04 with supporting documentation;
and
(iv) Inventory control records to establish that items Offeror proposes to furnish under current order are still in Offeror's stock. (This documentation is mandatory and must be provided to Quality Assurance Representative (QAR) for examination at time of source inspection. Documentation may be provided to Contracting Officer prior to award, at Offeror's discretion.)
(3) If Offeror is an authorized dealer/distributor, or manufactures the item for an approved source --
(i) An authorized dealer/distributorship agreement, licensee agreement, or other type of agreement. (The agreement must specifically identify the exact item, or otherwise ensure that the Offeror is authorized by the approved source to manufacture or distribute the exact item being acquired. If the agreement covers a general product line or is otherwise not product-specific, the Offeror must also furnish additional documentation to address the exact item being acquired (see above).); or
(ii) Letter from an approved source cited in the PID, specifically identifying Offeror as authorized to distribute or manufacture the exact item cited in the PID for that approved source; or
(iii) Other verifiable information (e.g., listing of authorized dealers on official Web page of an approved source) to establish the Offeror's authority to manufacturer or distribute the exact item cited in the PID for an approved source cited in the PID.
(4) When the PID specifies a revision number --
(i) Documentation establishing that the offered item was (or will be) made in accordance with the revision cited in the PID. (This requirement is considered to have been met when documentation provided by Offeror to satisfy other portions of this clause or solicitation already establishes that offered item was (or will be) made to the revision cited in the PID); or
(ii) Documentation identifying the revision offered and the differences between the revision offered and the revision
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 28 PAGES
CONTINUED ON NEXT PAGE
cited in the PID.
(e) By the submission of this offer, the Offeror represents that --
(1) The item(s) to be provided to the Government --
(i) Is (or will be) in full compliance with all requirements specified in the solicitation; and
(ii) Is not (or will not be) --
(A) A factory second;
(B) Changed, mutilated, or rebranded;
(C) A manufacturer's overrun;
(D) A rejected item; or
(E) Government surplus material (unless Offeror has complied with clause at DLAD 52.211-9000 or Procurement Note C04, Government Surplus Material).
(2) In the event of item failure, Offeror will have access to, and will provide to the Government upon request, all information necessary to trace the item back through the manufacturing process.
(3) Any documentation provided by Offeror will correspond to the exact item(s) that will be furnished to the Government; or Offeror will obtain updated documentation and provide it to the Government (if, for example, Offeror sells item(s) to another Buyer before award or before tender for acceptance).
(f) Failure to provide adequate documentation within the timeframe requested by the Contracting Officer may result in rejection of the offer.
CHANGES IN CONTRACTOR STATUS, ITEM ACQUIRED, AND/OR MANUFACTURING PROCESS/FACILITY
(a) Since the item being acquired is a critical safety item, the Contractor shall immediately provide notification and documentation of the changes to the Contracting Officer when any changes occur in the Contractor’s business status or relationship with the approved source(s) after award of this contract (such as, for example, inability to obtain manufacturing process information; or changes in status as authorized dealer/distributor, or in terms of licensing arrangement),
(b) The Contractor shall immediately provide to the Contracting Officer notification (and documentation, if available) of any of the following changes the Contractor becomes aware of:
(1) Later revisions to drawings, specifications or standards that differ from the revision cited in the procurement item description (PID) in the contract;
(2) Changes in the manufacturing process;
(3) A change in the approved source’s manufacturing location; or
(4) A transfer of manufacturing facilities by the approved source since last manufacture.
WITHHOLDING OF MATERIEL REVIEW BOARD (MRB) AUTHORITY
The item being acquired is a critical safety item. Notwithstanding any other term or condition included in this contract/agreement, Materiel Review Board (MRB) authority is hereby withheld.
(End of Notice)
DAAN-09-01
National Stock Number (NSN) Identification of First Article Testing (September 2016)
If the offeror has received a contract or purchase order for the same National Stock Numbered (NSN) item sought under this solicitation subject to a First Article Test (FAT), the offeror must identify the contract number under which the First Article is due and the date on which the First Article is due. The contracting officer will use this information in making a determination as to whether First Article can be waived for the offeror under the current solicitation, or alternately, whether a conditional award pending first article approval can be made under the current solicitation.
If the requested/required delivery for the FAT Report/FA ship time cannot be met, offeror(s) shall provide a proposed delivery schedule with details explaining why the requested/required delivery cannot be met.
The supplier shall notify in writing the testing lab, the Engineering Support Activity, and the contract administrator when testing reports and/or shipments are submitted in accordance with contract requirements to include tracking information.
(End of Notice)
First Article Testing (Government) (May 2017) Government First Article Test (FAT)
1 EACH = 1 FAT
Number of units to be tested: 1 Disposition of FAT units: 05 DELIVER PART OF PROD QTY
For Testing:
Inspection: Origin
Ship To (Lab DoDAAC): FB2029 Ship To (Lab Address): 809 MXSS / MXDEB
ATTN: FIRST ARTICLE TEST
BLDG. 849 DEAR JOHN BAY
HILL AFB, UT 84056-5713
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 28 PAGES
Acceptance: Destination (Issuing Activity DoDAAC): SPE4A6
FOB: ORIGIN
Delivery Schedule:
90 Days ARO: Delivery of FAT Exhibits 180 Days: Government Evaluation and Notification to Contractor 353 Days: Completion & Shipment of Production Units 623 Total Days ARO
The following DLA Aviation Notices are incorporated by reference. The full-text of the notices can be found at:
http://www.dla.mil/Aviation/Business/IndustryResources/DLAResourcesforSuppliers/DAANs.aspx
DAAN-13-01 Evaluation and Award for Simplified Acquisitions.
(March 2018) (b) Relative Important and Trade-offs. The Government will base the determination of best value on a comparative assessment of the quoters' prices, past performance, and the other evaluation factors identified elsewhere in this solicitation. The determination of best value also considers the relative importance of the evaluation factors. All evaluation factors, when combined, are:
[ ] significantly more important than cost or price.
As other evaluation factors become more equal, the evaluated cost or price becomes more important.
[ X ] approximately equal to cost or price; or
[ ] significantly less important than cost or price.
As the evaluated cost/price becomes more equal, relative importance of all other evaluation factors becomes more significant.
(e) Past Performance Evaluation Factors. The Government will use the past performance evaluation factors marked below in addition to cost or price and other evaluation factors specified in the solicitation. Unless indicated otherwise, past performance is significantly more important than other non-price factors. Within the past performance subfactors, SPRS/PPIRS assessments (as applicable) will be weighed most heavily. Historical quality history and delivery schedule compliance (not captured in SPRS/PPIRS) will be weighed more heavily than the remaining past performance subfactors. All other non-price evaluation factors specified in this solicitation weigh equally, unless otherwise indicated.
[ ] SPRS Assessments (i.e., quality and delivery) [ ] Historical Quality (not captured in SPRS) [ ] Historical Delivery Schedule Compliance (not captured in SPRS) [ ] Other (specify):
End of Notice)
DAAN-13-01 (ALT I)
(b) Non-Price Factors. Quoted delivery and past performance will be evaluated equally, unless indicated otherwise below.
[ ] Quoted delivery is weighed more heavily than past performance.
[ ] Past Performance is weighed more heavily than quoted delivery
.End of Notice)
(End ofNotice)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 28 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLIES/SERVICES: 5975-00-288-5877
ITEM DESCRIPTION:
CONDUIT,NONMETALLIC,FLEXIBLE
MIL-STD-130N(1) DATED 16 NOV 2012.
IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY
THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO
EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA AND
ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED THROUGH
JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE DEPARTMENTS OF
STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO INTERNATIONAL
AGREEMENTS.
TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, MILITARY CRITICAL
TECHNICAL DATA AGREEMENT, FORM IS AVAILABLE AT THE WORLD WIDE WEB
ADDRESS:
https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/defaul t.aspx
OR BY WRITING TO:
DLA LOGISTICS INFORMATION SERVICE
FEDERAL CENTER
74 WASHINGTON AVE., NORTH
BATTLE CREEK, MI 49037-3084
TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A
CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT,
DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY
THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN
EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 EXEMPTIONS OF
GENERAL APPLICABILITY, AND/OR EAR PART 740 ARE APPLICABLE.
NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL DATA ARE
REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN APPLICABLE AGREEMENT
OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO RECEIVE A COPY OF THE
EXPORT CONTROLLED TECHNICAL DATA.
NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO
THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA
UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY
PERMITTED BY DODD 5230.25.
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR
SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON
REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND
NON-MANUFACTURERS)
RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 28 PAGES
CONTINUED ON NEXT PAGE
SUPPLY/SERVICE: 5975-00-288-5877 CONT'D
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
Government First Article Preproduction approval required. Testing will be in accordance with applicable drawings, specifications and/or Engineering instructions. The first article offered shall be manufactured at the facilities in which production quantities are procured and produced under this contract. When submitting the first article(s) for government testing, a copy of the contract and all applicable drawings, specifications, engineering instructions, certifications, and inspection sheets shall be provided. Upon receipt and evaluation of the test report from the responsible government testing location, the contracting officer will provide final notification to the manufacturer. Any questions or concerns regarding the first article test requirements must be submitted through the contracting officer.
Additional Wide Area Workflow (WAWF) instructions for government first article test CLIN: The contractor shall code the receiving report for government first article test CLIN in WAWF as Follows:
A: Inspection at origin (Source) - Enter the DCMA office DODAAC listed on page 1 of the contract.
B: Acceptance by other - Enter the issue by office DODAAC listed on page 1 of the contract.
C: Ship to code - Enter the DODAAC of the test facility listed for the government first article test CLIN in the contract (See FAR Clause 52.209-4).
FIRST ARTICLE TEST MARKING INSTRUCTIONS:
FAT sample(s) packaging shall be clearly marked "FIRST ARTICLE TEST EXHIBIT(S) DO NOT POST TO STOCK!!!" in largest font possible with contrasting color to the packaging. Marking shall be located adjacent to the Package Shipping Label side and on at least one additional side of the package.
A SAMPLE QTY OF 1 SHALL BE SUBMITTED TO THE FOLLOWING ADDRESS WITHIN 90
CALENDAR DAYS OF CONTRACT AWARD:
FB2029, 809MXSS/MXDEB, BLDG 849
ATTN: NON-ACCOUNTABLE BAY
TRANSPORTATION OFFICE
HILL AFB, UTAH 84056
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
INTERCONTINENTAL BALLISTIC MISSILE (ICBM) ITEM
ALL REQUESTS FOR WAIVERS OR DEVIATIONS
CLASSIFIED AS CRITICAL, MAJOR, AND MINOR MUST BE
FORWARDED TO THE DSC CONTRACTING OFFICER FOR
REVIEW AND APPROVAL.
ALL ITEMS OF SUPPLY SHALL BE MARKED IAW
MIL-STD-129. IN ADDITION, EACH UNIT PACK WILL
BE MARKED WITH LOT AND SERIAL NUMBER (IF AVAILABLE),
CONTRACTOR'S CAGE CODE, ACTUAL MANUFACTURER'S
CAGE CODE AND PART NUMBER.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 28 PAGES
CONTINUED ON NEXT PAGE
SECTION B
SUPPLY/SERVICE: 5975-00-288-5877 CONT'D
CRITICAL APPLICATION ITEM
DCX-CHOL ENTERPRISES, INC. DBA 30463 P/N E1126-51-3
Missile Systems Incorporated 60039 P/N 010385-3
IAW REFERENCE DRAWING NR 81205 27-10386
REVISION NR H DTD 06/26/2014
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 81205 27-10386
REVISION NR H DTD 02/25/1976
PART PIECE NUMBER: 27-10386-3
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 5975-00-288-5877 117.000 EA $ ________________ $ ________________
CONDUIT
,NONMETALLIC
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: ORIGIN DELIVERY DATE: 623 DAYS ADO
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP:001 PRES MTHD:10 CLNG/DRY:1 PRESV MAT:00
WRAP MAT:00 CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0
UNIT CONT:E5 OPI:M
INTRMDTE CONT:E5 INTRMDTE CONT QTY:AAA
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008
Hardness critical item (HCI). Unit packs, intermediate and exterior containers housing items identified on the parts list as "HCI" shall be stamped, stenciled<(>,<)> or labeled with the symbol "HCI" or the words "HARDNESS CRITICAL ITEM".
IP025: PACKAGING, MARKING, AND SHIPPING OF HAZARDOUS MATERIALS
PARCEL POST ADDRESS:
SW3210
DLA DISTRIBUTION DEPOT HILL
7537 WARDLEIGH RD
HILL AFB UT 84056-5734
US
FOR TRANSPORTATION ASSISTANCE SEE DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION (FDT) AWARDS SEE DLAD PROC
NOTE C20 AND
CONTRACT INSTRUCTIONS.
FREIGHT SHIPPING ADDRESS:
SW3210
DLA DISTRIBUTION DEPOT HILL
7537 WARDLEIGH RD BLDG 849W
CML 385 519 8898
HILL AFB UT 84056-5734
US
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 28 PAGES
CONTINUED ON NEXT PAGE
SUPPLY/SERVICE: 5975-00-288-5877 CONT'D
Government First Article Test Government First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-4 for the actual quantity required to be tested.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0002 0001 - S00000052 1.000 EA $ ________________ $ ________________
FOB: DELIVERY DATE: 90 DAYS ADO
PREP FOR DELIVERY:
Not Applicable
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 0073762398 0001 N/A N/A N/A 09/04/2019
0002 N/A N/A N/A N/A N/A N/A
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 28 PAGES
SECTION A - SOLICITATION/CONTRACT FORM
TECHNICAL REQUIREMENTS
THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN `R' OR AN `I' NUMBER IN SECTION B) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE
WEB AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-
ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016) FAR
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (SEP 2016)
C01 SUPERSEDED PART NUMBERED ITEMS (SEP 2016)
SECTION D - PACKAGING AND MARKING
252.211-7006 PASSIVE RADIO FREQUENCY IDENTIFICATION (JUN 2016) DFARS
As prescribed in 211.275-3, use the following clause:
(a) Definitions. As used in this clause --
“Advance shipment notice” means an electronic notification used to list the contents of a shipment of goods as well as additional information relating to the shipment, such as passive radio frequency identification (RFID) or item unique identification (IUID) information, order information, product description, physical characteristics, type of packaging, marking, carrier information, and configuration of goods within the transportation equipment.
“Bulk commodities” means the following commodities, when shipped in rail tank cars, tanker trucks, trailers, other bulk wheeled conveyances, or pipelines:
(1) Sand.
(2) Gravel.
(3) Bulk liquids (water, chemicals, or petroleum products).
(4) Ready-mix concrete or similar construction materials.
(5) Coal or combustibles such as firewood.
(6) Agricultural products such as seeds, grains, or animal feed.
“Case” means either a MIL-STD-129 defined exterior container within a palletized unit load or a MIL-STD-129 defined individual shipping container.
“Electronic Product Code™ (EPC)” means an identification scheme for universally identifying physical objects via RFID tags and other means.
The standardized EPC data consists of an EPC (or EPC identifier) that uniquely identifies an individual object, as well as an optional filter value when judged to be necessary to enable effective and efficient reading of the EPC tags. In addition to this standardized data, certain classes of EPC tags will allow user-defined data. The EPC Tag Data Standards will define the length and position of this data, without defining its content.
“EPCglobal®” means a subscriber-driven organization comprised of industry leaders and organizations focused on creating global standards for the adoption of passive RFID technology.
“Exterior container” means a MIL-STD-129 defined container, bundle, or assembly that is sufficient by reason of material, design, and construction to protect unit packs and intermediate containers and their contents during shipment and storage. It can be a unit pack or a file:///C:/Users/RJ30041/AppData/Local/Temp/
Temp2_dfars_html%20(1).zip/dfars_html/211_2.htm
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 28 PAGES
SECTION D - PACKAGING AND MARKING (CONTINUED)
CONTINUED ON NEXT PAGE
container with a combination of unit packs or intermediate containers. An exterior container may or may not be used as a shipping container.
“Palletized unit load” means a MIL-STD-129 defined quantity of items, packed or unpacked, arranged on a pallet in a specified manner and secured, strapped, or fastened on the pallet so that the whole palletized load is handled as a single unit. A palletized or skidded load is not considered to be a shipping container. A loaded 463L System pallet is not considered to be a palletized unit load. Refer to the Defense Transportation Regulation, DoD 4500.9-R, Part II, Chapter 203, for marking of 463L System pallets.
“Passive RFID tag” means a tag that reflects energy from the reader/interrogator or that receives and temporarily stores a small amount of energy from the reader/interrogator signal in order to generate the tag response. The only acceptable tags are EPC Class 1 passive RFID tags that meet the EPCglobal™ Class 1 Generation 2 standard.
“Radio frequency identification (RFID)” means an automatic identification and data capture technology comprising one or more reader/ interrogators and one or more radio frequency transponders in which data transfer is achieved by means of suitably modulated inductive or radiating electromagnetic carriers.
“Shipping container” means a MIL-STD-129 defined exterior container that meets carrier regulations and is of sufficient strength, by reason of material, design, and construction, to be shipped safely without further packing (e.g., wooden boxes or crates, fiber and metal drums, and corrugated and solid fiberboard boxes).
(b)(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall affix passive RFID tags, at the case- and palletized-unit-load packaging levels, for shipments of items that --
(i) Are in any of the following classes of supply, as defined in DoD 4140.1-R, DoD Supply Chain Materiel Management Regulation, AP1.1.11:
(A) Subclass of Class I - Packaged operational rations.
(B) Class II - Clothing, individual equipment, tentage, organizational tool kits, hand tools, and administrative and housekeeping supplies and equipment.
(C) Class IIIP - Packaged petroleum, lubricants, oils, preservatives, chemicals, and additives.
(D) Class IV - Construction and barrier materials.
(E) Class VI - Personal demand items (non-military sales items).
(F) Subclass of Class VIII - Medical materials (excluding pharmaceuticals, biologicals, and reagents - suppliers should limit the mixing of excluded and non-excluded materials).
(G) Class IX - Repair parts and components including kits, assemblies and subassemblies, reparable and consumable items required for maintenance support of all equipment, excluding medical-peculiar repair parts; and
(ii) Are being shipped to one of the locations listed at http://www.acq.osd.mil/log/sci/RFID_ship-to_locations.html or to --
(A) A location outside the contiguous United States when the shipment has been assigned Transportation Priority 1, or to --
(B) The following location(s) deemed necessary by the requiring activity:
Contract Line, Subline, or Exhibit Line Item Number Location Name City State DoDAAC
(2) The following are excluded from the requirements of paragraph (b)(1) of this clause:
(i) Shipments of bulk commodities.
(ii) Shipments to locations other than Defense Distribution Depots when the contract includes the clause at FAR 52.213-1, Fast Payment Procedures.
(c) The Contractor shall --
(1) Ensure that the data encoded on each passive RFID tag are globally unique (i.e., the tag ID is never repeated across two or more RFID tags and conforms to the requirements in paragraph (d) of this clause;
(2) Use passive tags that are readable; and
(3) Ensure that the passive tag is affixed at the appropriate location on the specific level of packaging, in accordance with MIL-STD-129 http://www.acq.osd.mil/log/sci/RFID_ship-to_locations.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 28 PAGES
SECTION D - PACKAGING AND MARKING (CONTINUED)
CONTINUED ON NEXT PAGE
(Section 4.9.2) tag placement specifications.
(d) Data syntax and standards. The Contractor shall encode an approved RFID tag using the instructions provided in the EPC™ Tag Data Standards in effect at the time of contract award. The EPC™ Tag Data Standards are available at http://www.epcglobalinc.org/standards/.
(1) If the Contractor is an EPCglobal™ subscriber and possesses a unique EPC™ company prefix, the Contractor may use any of the identifiers and encoding instructions described in the most recent EPC™ Tag Data Standards document to encode tags.
(2) If the Contractor chooses to employ the DoD identifier, the Contractor shall use its previously assigned Commercial and Government Entity (CAGE) code and shall encode the tags in accordance with the tag identifier details located in the DoD Suppliers' Passive RFID Information Guide at http://www.acq.osd.mil/log/sci/ait.html. If the Contractor uses a third-party packaging house to encode its tags, the CAGE code of the third-party packaging house is acceptable.
(3) Regardless of the selected encoding scheme, the Contractor with which the Department holds the contract is responsible for ensuring that the tag ID encoded on each passive RFID tag is globally unique, per the requirements in paragraph (c)(1).
(e) Advance shipment notice. The Contractor shall use Wide Area WorkFlow (WAWF), as required by DFARS 252.232-7003, Electronic Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph (d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/.
(End of clause)
SECTION E - INSPECTION AND ACCEPTANCE
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) FAR
As prescribed in 46.311, insert the following clause:
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring
[Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.
(End of Clause)
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008) DFARS
E05 PRODUCT VERIFICATION TESTING (SEP 2016)
(1) When PVT is invoked, the QAR will notify the contractor that testing will be performed. The product verification testing (PVT) will be performed at a Government-designated testing laboratory.
(a) The contractor shall not ship or deliver any material unless directed to do so in writing by the contracting officer or until notified of acceptable PVT results.
(b) PVT results will be provided in 20 working days after receipt at the Government testing facility.
(2) The QAR will select a random sample from the contractor's production lot. Selected PVT samples are to be shipped by the contractor at http://www.epcglobalinc.org/standards/ http://www.acq.osd.mil/log/sci/ait.html file:///C:/Users/RJ30041/AppData/Local/Temp/
Temp2_dfars_html%20(1).zip/dfars_html/252232.htm https://wawf.eb.mil/ http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/46.htm
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 28 PAGES
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
CONTINUED ON NEXT PAGE
Government expense with a copy of the Department of Defense DD
Form 250 and a DD Form 1222. The packaging will be marked “Product Verification Test Samples, Contract Number Lot/Item Number ."
(3) Test results will indicate one of the following:
(a) Samples that pass testing and are not destroyed during evaluation will be returned to the contractor at the Government's expense and will be included as part of the total contract quantity. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. These samples will be considered part of the contract quantity. Samples that pass testing and are not returned to the contractor will be considered part of the contract quantity for payment and delivery. The contractor will deliver the remaining lot quantity minus sample units.
(b) If samples fail testing, such failure will result in rejection of the entire contract lot from which the samples were taken. At the Government's discretion, parts failing any test criteria may be retained and not be returned to the contractor.
E06 INSPECTION AND ACCEPTANCE AT ORIGIN (SEP 2016)
The contractor shall indicate the location where supplies will be inspected:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line-item numbers(s) (CLIN(s)):
The contractor shall indicate the location where packaging will be inspected:
( ) Same as for supplies OR CAGE code:
Address:
Applicable to CLIN(s):
SECTION F - DELIVERIES OR PERFORMANCE
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989) FAR
52.242-15 STOP-WORK ORDER (AUG 1989) FAR
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H03 SUPPLEMENTAL FIRST ARTICLE TESTING REQUIREMENTS (SEP 2016)
H04 SOURCING FOR CRITICAL SAFETY ITEMS (SEP 2016)
252.223-7001 HAZARD WARNING LABELS (DEC 1991) DFARS
(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labelled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.
MATERIAL (If None, Insert “None”)
ACT
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 28 PAGES
SECTION H - SPECIAL CONTRACT REQUIREMENTS (CONTINUED)
CONTINUED ON NEXT PAGE
MATERIAL (If None, Insert “None”)
ACT
SECTION I - CONTRACT CLAUSES
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
FAR
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (OCT 2016) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013) DFARS
252.203-7995 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS (NOV 2016) DFARS
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016) FAR
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016) FAR
52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (OCT 2016) FAR
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016) FAR
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) FAR
52.204-20 PREDECESSOR OF OFFEROR (JUL 2016) FAR
As prescribed in 4.1804(d), insert the following provision:
(a) Definitions. As used in this provision -
“Commercial and Government Entity (CAGE) code” means -
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.
“Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
(b) The Offeror represents that it [ ] is or [ ] is not a successor to a predecessor that held a Federal contract or grant within the last three https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%204_18.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 28 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
years.
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code:
Predecessor legal name:
(Do not use a “doing business as” name)
(End of provision)
252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013) DFARS
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS
252.204-7004 ALTERNATE A, SYSTEM FOR AWRD MANAGEMENT (FEB 2014) DFARS
Standard Element ZB_204_7009 has no Title
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016) DFARS
52.209-4 FIRST ARTICLE APPROVAL - GOVERNMENT TESTING (SEP 1989) FAR
As prescribed in 9.308-2(a) and (b), insert the following clause:
[Contracting Officer shall insert details]
(a) The Contractor shall deliver 1 unit(s) of Lot/Item 5975002885877 within 90 calendar days from the date of this contract to the
Government at DoDAAC): FB2029 809 MXSS / MXDEB ATTN: FIRST ARTICLE TEST BLDG. 849 DEAR JOHN BAY HILL AFB, UT
84056-5713 [insert name and address of the testing facility] for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 180 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the
Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing.
All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The
Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the
Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor -
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%209_3.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 28 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
CONTINUED ON NEXT PAGE
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
52.209-4 FIRST ARTICLE APPROVAL - GOVERNMENT TESTING (SEP 1989), ALT I (JAN 1997) FAR
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR SUSPENSION (OCT 2015) FAR
252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011) DFARS
As prescribed in 209.270-5, use the following clause:
(a) Definitions.
“Aviation critical safety item” means a part, an assembly, installation equipment, launch equipment, recovery equipment, or support equipment for an aircraft or aviation weapon system if the part, assembly, or equipment contains a characteristic any failure, malfunction, or absence of which could cause --
(i) A catastrophic or critical failure resulting in the loss of, or serious damage to, the aircraft or weapon system;
(ii) An unacceptable risk of personal injury or loss of life; or
(iii) An uncommanded engine shutdown that jeopardizes safety.
“Design control activity” means --
(i) With respect to an aviation critical safety item, the systems command of a military department that is specifically responsible for ensuring the airworthiness of an aviation system or equipment, in which an aviation critical safety item is to be used; and
(ii) With respect to a ship critical safety item, the systems command of a military department that is specifically responsible for ensuring the seaworthiness of a ship or ship equipment, in which a ship critical safety item is to be used.
“Ship critical safety item” means any ship part, assembly, or support equipment containing a characteristic, the failure, malfunction, or absence of which could cause --
(i) A catastrophic or critical failure resulting in loss of, or serious damage to, the ship; or
(ii) An unacceptable risk of personal injury or loss of life.
(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item.
The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:
http://www.acq.osd.mil/dpap/dars/dfars/html/current/209_2.htm
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 16 OF 28 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
(Insert additional lines as necessary)
(c) Heightened quality assurance surveillance. Items designated in paragraph (b) of this clause are subject to heightened, risk-based surveillance by the designated quality assurance representative.
52.211-5 MATERIAL REQUIREMENTS (AUG 2000) FAR
252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS (NOV 2005) DFARS As prescribed in 211.273-4, use the following clause:
(a) Definition. “SPI process,” as used in this clause, means a management or manufacturing process that has been accepted previously by the Department of Defense under the Single Process Initiative (SPI) for use in lieu of a specific military or Federal specification or standard at specific facilities. Under SPI, these processes are reviewed and accepted by a Management Council, which includes representatives of the Contractor, the Defense Contract Management Agency, the Defense Contract Audit Agency, and the military departments.
(b) Offerors are encouraged to propose SPI processes in lieu of military or Federal specifications and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.