SPE4A618Q0900.PDF

PDF 373 KB Posted

Attached to
SHIM, RETENTION PLAT Federal contract opportunity
Solicitation number
SPE4A618Q0900
Issued by
Defense Logistics Agency Aviation

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

4. CERT.FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5. ISSUED BY

7. DELIVERY

9. DESTINATION

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5 ON OR

BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (See Continuation Sheets)

12. DISCOUNT FOR PROMPT PAYMENT

d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

14. SIGNATURE OF PERSON AUTHORIZED TO SIGN

QUOTATION

16. SIGNER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not useable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

1. REQUEST NO.

SPE4A6-18-Q-0900

2. DATE ISSUED

2018 APR 06

3. REQUISITION/PURCHASE REQUEST NO.

0073829661

RATING

DO-C9

DLA AVIATION

ASC COMMODITIES DIVISION

8000 JEFFERSON DAVIS HIGHWAY

RICHMOND VA 23297

USA

Buyer: Dorothy Groux PARFM18 Tel: 804-279-5128 Fax: 804-279-5284 Email: DOROTHY.GROUX@DLA.MIL

6. DELIVER BY (Date)

SEE SCHEDULE

8. TO:

c. CITY

d. STATE

b. STREET ADDRESS

a. NAME OF CONSIGNEE

e. ZIP CODE

a. 10 CALENDAR DAYS

b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS

15. DATE OF QUOTATION

a. NAME (Type or Print)

AREA CODE

c. TITLE (Type or Print)d. CITY

c. COUNTY

b. STREET ADDRESS

e. STATE f. ZIP CODE

See Schedule

2018 APR 09

NUMBER

FOB DESTINATION

OTHER

(See Schedule)

CAGE

b. TELEPHONE

See attached schedule to complete quote information.

Quoter must also complete the following:

a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .

b. Prices quoted are:

___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .

___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.

___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;

___ Customer ________________________.

___ Other (provide basis) ______________________________________ _______________________________________ .

c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .

d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.

e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:

f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 26 PAGES

SPE4A6-18-Q-0900

CONTINUED ON NEXT PAGE

THIS IS AN URGENT AND COMPELLING BUY. PROVIDE BEST DELIVERY POSSIBLE.

The following DLA Aviation Notices are incorporated by reference. The full-text of the notices can be found at:

http://www.dla.mil/Aviation/Business/IndustryResources/DLAResourcesforSuppliers/DAANs.aspx

DAAN-13-01 Evaluation and Award for Simplified Acquisitions.

(March 2018)(b) Relative Important and Trade-offs. The Government will base the determination of best value on a comparative assessment of the quoters' prices, past performance, and the other evaluation factors identified elsewhere in this solicitation. The determination of best value also considers the relative importance of the evaluation factors. All evaluation factors, when combined, are:

[X] significantly more important than cost or price.

As other evaluation factors become more equal, the evaluated cost or price becomes more important.

[ ] approximately equal to cost or price; or

[ ] significantly less important than cost or price.

As the evaluated cost/price becomes more equal, relative importance of all other evaluation factors becomes more significant.

(e) Past Performance Evaluation Factors. The Government will use the past performance evaluation factors marked below in addition to cost or price and other evaluation factors specified in the solicitation. Unless indicated otherwise, past performance is significantly more important than other non-price factors. Within the past performance subfactors, SPRS assessments (as applicable) will be weighed most heavily. Historical quality history and delivery schedule compliance (not captured in SPRS) will be weighed more heavily than the remaining past performance subfactors. All other non-price evaluation factors specified in this solicitation weigh equally, unless otherwise indicated.

[X] SPRS Assessments (i.e., quality and delivery) [ ] Historical Quality (not captured in SPRS) [ ] Historical Delivery Schedule Compliance (not captured in SPRS) [ ] Other (specify):

(End of Notice)

DAAN-13-01 (ALT I)

Evaluation and Award for Simplified Acquisitions

(ALT I)

(March 2018)(b) Non-Price Factors. Quoted delivery and past performance will be evaluated equally, unless indicated otherwise below.

[X] Quoted delivery is weighed more heavily than past performance.

[ ] Past Performance is weighed more heavily than quoted delivery.

(End of Notice)

DAAN-13-05

Quote Submission Method (March 2017)Quotes in response to this solicitation may be submitted by the following method(s) as indicated below:

____ Upload Proposals on the DLA Internet Bid Board System (DIBBS) at: https://www.dibbs.bsm.dla.mil/default.aspx

____Buyer’s Facsimile: _________________

_X___Buyer’s e-mail address: Dorothy.Groux@dla.mil

*Note: E-mailed RFQs must not exceed 15 MB. Proposals greater than 15 MB must be submitted using multiple emails.

(End of Notice)

DAAN-09-06

Critical Safety Items (September 2016)

DAAN-09-01

National Stock Number (NSN) Identification of First Article Testing (September 2016)

DAAN-09-04

First Article Testing (Government) (May 2017)Government First Article Test (FAT)

1 EACH = 1 FAT

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 26 PAGES

CONTINUED ON NEXT PAGE

Number of units to be tested: __2______ Disposition of FAT units: DELIVER AS PART OF PRODUCTION QTY

For Testing:

Inspection: Origin Ship To (Lab DoDAAC): N65923 Ship To (Lab Address):

MCAS CHERRY POINT

FLEET READINESS CENTER EAST

RECEIVING OFFICER

BLDG 148, BAY C

BEACHEY ROAD

CHERRY POINT, NT 28533-5040

Acceptance: Destination Issuing Activity DoDAAC): SPE4A6 FOB: Destination

Delivery Schedule:

60 Days ARO: Delivery of FAT Exhibits 60 Days: Government Evaluation and Notification to Contractor 60 Days: Completion & Shipment of PLT samples 30 Days: Government PLT Report Evaluation and Notification to Contractor 30 Days: Delivery of production quantity to Government 240 Total Days ARO

(End of Notice)

DAAN-46-01

Production Lot Testing (Government) (May 2017) Production Lot Test (PLT)

1 EACH = 1 PLT

Number of units to be tested: __2_____

For Testing:

Inspection: Origin Ship To (Lab DoDAAC): SAME AS ABOVE Ship To (Lab Address): SAME AS ABOVE Acceptance: Destination Issuing Activity DoDAAC: SPE4A6

All transportation charges incurred in the submission and return of any production lot sample shall be borne by the Contractor. The sample shall be packaged and marked in accordance with the item description when the sample is shipped to the testing facility.

(End of Notice)

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 26 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLIES/SERVICES: 5365-01-172-3587

ITEM DESCRIPTION:

SHIM, RETENTION PLATE, TAIL ROTOR

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE

DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR

SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE

SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE

ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE

APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON

REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND

NON-MANUFACTURERS)

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)

RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND

NON-MANUFACTURERS)

RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL

REQUEST FOR VARIANCE (DEVIATION OR WAIVER)

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES

RT001: MEASURING AND TEST EQUIPMENT

MIL-STD-130N(1) DATED 16 NOV 2012.

IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY

Government First Article Preproduction approval required. Testing will be in accordance with applicable drawings, specifications and/or Engineering instructions. The first article offered shall be manufactured at the facilities in which production quantities are procured and produced under this contract. When submitting the first article(s) for government testing, a copy of the contract and all applicable drawings, specifications, engineering instructions, certifications, and inspection sheets shall be provided. Upon receipt and evaluation of the test report from the responsible government testing location, the contracting officer will provide final notification to the manufacturer. Any questions or concerns regarding the first article test requirements must be submitted through the contracting officer.

Additional Wide Area Workflow (WAWF) instructions for government first article test CLIN: The contractor shall code the receiving report for government first article test CLIN in WAWF as Follows:

A: Inspection at origin (Source) - Enter the DCMA office DODAAC listed on page 1 of the contract.

B: Acceptance by other - Enter the issue by office DODAAC listed on page 1 of the contract.

C: Ship to code - Enter the DODAAC of the test facility listed for the government first article test CLIN in the contract (See FAR Clause 52.209-4).

FIRST ARTICLE TEST MARKING INSTRUCTIONS:

FAT sample(s) packaging shall be clearly marked "FIRST ARTICLE TEST EXHIBIT(S) DO NOT POST TO STOCK!!!" in largest font possible with contrasting color to the packaging. Marking shall be located adjacent to the Package Shipping Label side and on at least one additional side of

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 26 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLY/SERVICE: 5365-01-172-3587 CONT'D

the package.

CONFIGURATION CONTROL:

DRAWING 70102-11110 CAGE 78286

PART NUMBER: 70102-11110-041

APPROVED SOURCES:

CAGE 78286

CAGE 0B5V5

CAGE 0GZ25

DRAWING EXCEPTIONS:

Critical Characteristics Details:

CRITICAL CHARACTERISTICS ARE IDENTIFIED AS SUCH ON THE DRAWINGS AND

TECHNICAL DATA. CRITICAL

CHARACTERISTICS NOT IDENTIFIED ON THE TECHNICAL DATA ARE LISTED BELOW:

P/N (78286) 70102-11110-041 RETENTION PLATE, SHIM

1) MATERIAL: COMPOSITE PRE-IMPREGNATED NYLON CLOTH PER SS9618, TYPE I

2) PROCESS PER SS9583; EXCEPT REINFORCEMENT SHALL BE NYLON FABRIC, PER

DWG. NOTE: 2

3) CURE AT 350°F TO 370°F FOR 60 MINUTES (MINIMUM) AT 50 PSI (MINIMUM),

PER DWG. NOTE: 2

4) DIMENSION 0.123-0.126", DWG. ZONE: B7

5) PLY ORIENTATION 0° AND 90° AS REQUIRED PER DWG. ZONE: C7

6) SEAL AS REQUIRED PER SS8622-003 ADHESIVE IAW 38023-15000 PER DWG.

NOTE: 8

7) LABELING OF PART PER DWG. NOTE: 10

FORWARDED TO THE FIRST ARTICLE TEST POINT OF CONTACT AT THE DESIGNATED

TEST

FACILITY SHOWN BELOW: DoDAAC: N65923

ATTN:FLEET READINESS CENTER EAST

RECEIVING OFFICER

CUNNINGHAM STREET

BUILDING 159, BAY DOOR R4

MCAS CHERRY POINT, NC 28533-5000

3. THE MARKING ON THE FAT SAMPLE'S SHIPPING CONTAINER SHALL READ: #FOR

FIRST ARTICLE TESTING.

NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK. CONTRACT NUMBER: ________#.

FOR

FIRST ARTICLE TEST, THE SHIPPING DOCUMENTATION SHALL CONTAIN THIS

CONTRACT NUMBER AND THE LOT/ITEM

PRODUCTION LOT TESTING APPLIES:

PRODUCTION LOT SAMPLE TESTING REQUIRED, GOVERNMENT TESTING IAW ANSI/ASQC

Z1.4-2008, LEVEL S-2<(>,<)> SELECTED AT RANDOM BY THE COGNIZANT

GOVERNMENT REPRESENTATIVE. SAMPLES SHALL BE IDENTIFIED BY CONTRACT

NUMBER AND LOT NUMBER, AND BE CLEARLY MARKED- PRODUCTION LOT SAMPLE.

TESTING IAW APPLICABLE DWGS/SPECS AND CONTRACT REQUIREMENTS. UPON

COMPLETION OF TESTING, SAMPLES WILL BE RETURNED TO THE CONTRACTOR. IN

ORDER FOR A PRODUCTION LOT TO BE ACCEPTABLE, ALL SAMPLES

REPRESENTATIVE OF THE LOT MUST PASS ALL OF THE CONTRACT REQUIREMENTS.

UPON NOTIFICATION OF ACCEPTANCE, SAMPLES WILL BE CONSIDERED PART OF THE

PRODUCTION QUANTITY AND SHIPPED WITH THE REST OF THE PRODUCTION LOT. IN

THE EVENT A SAMPLE FAILS TO PASS REQUIREMENTS, LOT WILL BE REJECTED.

FOURTEEN (14) DAYS PRIOR TO SHIPMENT OF PLT SAMPLE(S), THE CONTRACTOR

SHALL NOTIFY THE DESIGNATED TEST

FACILITY, IN WRITING, OF THE ANTICIPATED SHIPPING DATE, WITH AN

INFORMATION COPY TO THE PCO, ACO, AND

QAR. THE CONTRACTOR SHALL ALSO ARRANGE FOR PRELIMINARY INSPECTION OF

TEST SAMPLE(S) BY THE QAR. THE

PLT SAMPLE(S) SHALL BE FORWARDED TO THE IDENTIFIED POINT OF CONTACT AT

THE DESIGNATED TEST FACILITY SHOWN DoDAAC: N65923

BELOW.

ATTN:

FLEET READINESS CENTER EAST

RECEIVING OFFICER

CUNNINGHAM STREET

BUILDING 159, BAY DOOR R4

MCAS CHERRY POINT, NC 28533-5000

5. THE MARKING ON THE PLT SAMPLE(S) SHIPPING CONTAINER SHALL READ: #FOR

PRODUCTION LOT

TESTING. NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK. CONTRACT NUMBER:

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 26 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLY/SERVICE: 5365-01-172-3587 CONT'D

THE SHIPPING DOCUMENTATION SHALL CONTAIN THIS CONTRACT NUMBER AND THE

LOT/ITEM IDENTIFICATION.

GOVERNMENT FIRST ARTICLE APPLIES:

IDENTIFICATION.

EXPORT CONTROL:

THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO

EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA AND

ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED THROUGH

JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE DEPARTMENTS OF

STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO INTERNATIONAL

AGREEMENTS.

TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, MILITARY CRITICAL

TECHNICAL DATA AGREEMENT, FORM IS AVAILABLE AT THE WORLD WIDE WEB

ADDRESS:

https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/defaul t.aspx

OR BY WRITING TO:

DLA LOGISTICS INFORMATION SERVICE

FEDERAL CENTER

74 WASHINGTON AVE., NORTH

BATTLE CREEK, MI 49037-3084

TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A

CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT,

DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY

THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN

EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 EXEMPTIONS OF

GENERAL APPLICABILITY, AND/OR EAR PART 740 ARE APPLICABLE.

NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL DATA ARE

REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN APPLICABLE AGREEMENT

OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO RECEIVE A COPY OF THE

EXPORT CONTROLLED TECHNICAL DATA.

NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO

THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA

UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY

PERMITTED BY DODD 5230.25.

CRITICAL SAFETY ITEM - NAVY:

THIS IS A NAVY IDENTIFIED CRITICAL SAFETY ITEM

(CSI).

ALL REQUESTS FOR WAIVERS OR DEVIATIONS MUST BE

FORWARDED TO THE DSC CONTRACTING OFFICER FOR

REVIEW AND APPROVAL.

ALL ITEMS OF SUPPLY SHALL BE MARKED IAW

MIL-STD-129. IN ADDITION, EACH UNIT PACK WILL

BE MARKED WITH LOT AND SERIAL NUMBER (IF AVAILABLE),

CONTRACTOR'S CAGE CODE, ACTUAL MANUFACTURER'S

CAGE CODE AND PART NUMBER.

CRITICAL APPLICATION ITEM

VANTAGE ASSOCIATES INC. 0GZ25 P/N 70102-11110-041

Sikorsky Aircraft Corporation DBA 78286 P/N 70102-11110-041 Sample Machining, Inc. DBA Bitec 0B5V5 P/N 70102-11110-041

IAW REFERENCE DRAWING NR 78286 SS8798

REVISION NR 17 DTD 04/28/2015

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS9581

REVISION NR 7 DTD 02/05/2015

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS9583

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 26 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLY/SERVICE: 5365-01-172-3587 CONT'D

REVISION NR 11 DTD 07/12/1996

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS8690

REVISION NR 8 DTD 07/25/1996

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 70102-11110

REVISION NR G DTD 10/21/1998

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS8622

REVISION NR 07 DTD 04/07/2014

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 81996 70102-11110

REVISION NR F DTD 09/16/2014

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS9618

REVISION NR 2 DTD 07/19/1996

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS5100

REVISION NR 39 DTD 10/27/2011

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 70102-11110

REVISION NR F DTD 02/10/2006

PART PIECE NUMBER: 70102-11110-041

IAW REFERENCE DRAWING NR 78286 SS9699

REVISION NR 06 DTD 06/06/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS9208

REVISION NR 55 DTD 04/14/2015

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 70102-11110

REVISION NR BY DTD 07/13/2012

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS8798

REVISION NR 13 DTD 11/22/2010

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS8690

REVISION NR 8 DTD 02/12/1999

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS8612

REVISION NR 10 DTD 11/18/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS8669

REVISION NR 20 DTD 12/17/2009

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS8669

REVISION NR 20 DTD 11/14/2011

PART PIECE NUMBER:

IAW REFERENCE QAP 13873 CDRL-011723587-17094

REVISION NR DTD 04/06/2017

PART PIECE NUMBER:

IAW REFERENCE QAP 13873 011723587-13128

REVISION NR DTD 05/08/2013

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 81996 70102-11110-041

REVISION NR DTD 08/04/2016

PART PIECE NUMBER:

IAW REFERENCE DRAWING NR 78286 SS9618

REVISION NR 2 DTD 03/27/1998

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 26 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLY/SERVICE: 5365-01-172-3587 CONT'D

PART PIECE NUMBER:

IAW REFERENCE QAP 13873 010043786-17103

REVISION NR DTD 04/12/2017

PART PIECE NUMBER:

Critical Safety Item

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 5365-01-172-3587 1,250.000 EA $ ________________ $ ________________

SHIM,RETENTION

PLAT

PRICING TERMS: Firm Fixed Price

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 120 DAYS ADO

PREP FOR DELIVERY:

PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999

QUP:001 PRES MTHD:33 CLNG/DRY:1 PRESV MAT:00

WRAP MAT:GB CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0

UNIT CONT:D3 OPI:M

INTRMDTE CONT:E5 INTRMDTE CONT QTY:AAA

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:00 -00 No special marking

PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008

PARCEL POST ADDRESS:

W62G2T

W1A8 DLA DIST SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY CA 95304-5000

US

FOR TRANSPORTATION ASSISTANCE SEE DLAD 52.247-9034. FOR FIRST DESTINATION TRANSPORTATION (FDT) AWARDS SEE DLAD

52.247-9059 AND

CONTRACT INSTRUCTIONS INSTEAD.

FREIGHT SHIPPING ADDRESS:

W62G2T

W1A8 DLA DIST SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY CA 95304-5000

US

Government First Article Test Government First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-4 for the actual quantity required to be tested.

0002 0001 - S00000052 1.000 EA $ ________________ $ ________________

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 26 PAGES

CONTINUED ON NEXT PAGE

SECTION B

SUPPLY/SERVICE: 0001-S00000052 CONT'D

FOB: DELIVERY DATE: 60 DAYS ADO

PREP FOR DELIVERY:

Not Applicable

Production Lot Testing (Government)

0003 0001 - S00000061 1.000 EA $ ________________ $ ________________

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 60 DAYS ADO

PREP FOR DELIVERY:

Not Applicable

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 0073829661 0001 N/A N/A N/A 04/06/2018

0002 N/A N/A N/A N/A N/A N/A

0003 N/A N/A N/A N/A N/A N/A

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 26 PAGES

CONTINUED ON NEXT PAGE

SECTION A - SOLICITATION/CONTRACT FORM

TECHNICAL REQUIREMENTS

THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN `R' OR AN `I' NUMBER IN SECTION B) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE

WEB AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-

ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016) FAR

SECTION C - SPECIFICATIONS/SOW/SOO/ORD

C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (SEP 2016)

C02 MANUFACTURING PHASE OUT OR DISCONTINUATION OF PRODUCTION, DIMINISHING SOURCES, AND OBSOLETE

MATERIALS OR COMPONENTS (DEC 2016)

C14 REPACKAGING OR RELABELING TO CORRECT DEFICIENCIES (AUG 2017)

SECTION E - INSPECTION AND ACCEPTANCE

52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) FAR

As prescribed in 46.311, insert the following clause:

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Title Number Date Tailoring

ISO 9001 2008 OR EQUIVALENT

[Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.

(End of Clause)

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008) DFARS

E05 PRODUCT VERIFICATION TESTING (SEP 2016)

(1) When PVT is invoked, the QAR will notify the contractor that testing will be performed. The product verification testing (PVT) will be performed at a Government-designated testing laboratory.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/46.htm

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 26 PAGES

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

CONTINUED ON NEXT PAGE

(a) The contractor shall not ship or deliver any material unless directed to do so in writing by the contracting officer or until notified of acceptable PVT results.

(b) PVT results will be provided in 20 working days after receipt at the Government testing facility.

(2) The QAR will select a random sample from the contractor's production lot. Selected PVT samples are to be shipped by the contractor at Government expense with a copy of the Department of Defense DD

Form 250 and a DD Form 1222. The packaging will be marked “Product Verification Test Samples, Contract Number Lot/Item Number ."

(3) Test results will indicate one of the following:

(a) Samples that pass testing and are not destroyed during evaluation will be returned to the contractor at the Government's expense and will be included as part of the total contract quantity. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. These samples will be considered part of the contract quantity. Samples that pass testing and are not returned to the contractor will be considered part of the contract quantity for payment and delivery. The contractor will deliver the remaining lot quantity minus sample units.

(b) If samples fail testing, such failure will result in rejection of the entire contract lot from which the samples were taken. At the Government's discretion, parts failing any test criteria may be retained and not be returned to the contractor.

E06 INSPECTION AND ACCEPTANCE AT ORIGIN (SEP 2016)

The contractor shall indicate the location where supplies will be inspected:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line-item numbers(s) (CLIN(s)):

The contractor shall indicate the location where packaging will be inspected:

( ) Same as for supplies OR CAGE code:

Address:

Applicable to CLIN(s):

52.246-9008 INSPECTION AND ACCEPTANCE AT ORIGIN (AUG 2007), ALT I (AUG 2007) DLAD

SECTION F - DELIVERIES OR PERFORMANCE

52.211-16 VARIATION IN QUANTITY (APR 1984) FAR

As prescribed in 11.703(a), insert the following clause:

(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) of this clause.

(b) The permissible variation shall be limited to:

00 Percent increase [Contracting Officer insert percentage] https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2011_7.html

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 26 PAGES

SECTION F - DELIVERIES OR PERFORMANCE (CONTINUED)

CONTINUED ON NEXT PAGE

00 Percent decrease [Contracting Officer insert percentage]

This increase or decrease shall apply to ALL.*

(End of clause)

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989) FAR

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT - SMALL PACKAGE SHIPMENTS (JAN 1991) FAR

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H03 SUPPLEMENTAL FIRST ARTICLE TESTING REQUIREMENTS (SEP 2016)

H04 SOURCING FOR CRITICAL SAFETY ITEMS (SEP 2016)

SECTION I - CONTRACT CLAUSES

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

FAR

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (OCT 2016) DFARS

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013) DFARS

252.203-7995 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS (NOV 2016) DFARS

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016) FAR

52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016) FAR

52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (OCT 2016) FAR

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016) FAR

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) FAR

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 26 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

CONTINUED ON NEXT PAGE

52.204-20 PREDECESSOR OF OFFEROR (JUL 2016) FAR

As prescribed in 4.1804(d), insert the following provision:

(a) Definitions. As used in this provision -

“Commercial and Government Entity (CAGE) code” means -

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity; or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.

“Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.

(b) The Offeror represents that it [ ] is or [ ] is not a successor to a predecessor that held a Federal contract or grant within the last three years.

(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):

Predecessor CAGE code:

Predecessor legal name:

(Do not use a “doing business as” name)

(End of provision)

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016) FAR

252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013) DFARS

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS

252.204-7004 ALTERNATE A, SYSTEM FOR AWRD MANAGEMENT (FEB 2014) DFARS

Standard Element ZB_204_7009 has no Title

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016) DFARS

52.209-4 FIRST ARTICLE APPROVAL - GOVERNMENT TESTING (SEP 1989) FAR

As prescribed in 9.308-2(a) and (b), insert the following clause:

[Contracting Officer shall insert details]

(a) The Contractor shall deliver 2 unit(s) of Lot/Item 5365-01-172-3587 within 60 calendar days from the date of this contract to the

Government at SEE PAGE 2 FOR INSTRUCTION INFORMATION. [insert name and address of the testing facility] for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%204_18.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%209_3.html

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 26 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

CONTINUED ON NEXT PAGE

(b) Within 60 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the

Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing.

All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The

Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the

Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor -

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

52.209-4 FIRST ARTICLE APPROVAL - GOVERNMENT TESTING (SEP 1989), ALT I (JAN 1997) FAR

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR SUSPENSION (OCT 2015) FAR

252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011) DFARS

As prescribed in 209.270-5, use the following clause:

(a) Definitions.

“Aviation critical safety item” means a part, an assembly, installation equipment, launch equipment, recovery equipment, or support equipment for an aircraft or aviation weapon system if the part, assembly, or equipment contains a characteristic any failure, malfunction, or absence of which could cause --

(i) A catastrophic or critical failure resulting in the loss of, or serious damage to, the aircraft or weapon system;

http://www.acq.osd.mil/dpap/dars/dfars/html/current/209_2.htm

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 26 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

CONTINUED ON NEXT PAGE

(ii) An unacceptable risk of personal injury or loss of life; or

(iii) An uncommanded engine shutdown that jeopardizes safety.

“Design control activity” means --

(i) With respect to an aviation critical safety item, the systems command of a military department that is specifically responsible for ensuring the airworthiness of an aviation system or equipment, in which an aviation critical safety item is to be used; and

(ii) With respect to a ship critical safety item, the systems command of a military department that is specifically responsible for ensuring the seaworthiness of a ship or ship equipment, in which a ship critical safety item is to be used.

“Ship critical safety item” means any ship part, assembly, or support equipment containing a characteristic, the failure, malfunction, or absence of which could cause --

(i) A catastrophic or critical failure resulting in loss of, or serious damage to, the ship; or

(ii) An unacceptable risk of personal injury or loss of life.

(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item.

The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:

5365-01-172-3587

(Insert additional lines as necessary)

(c) Heightened quality assurance surveillance. Items designated in paragraph (b) of this clause are subject to heightened, risk-based surveillance by the designated quality assurance representative.

52.211-5 MATERIAL REQUIREMENTS (AUG 2000) FAR

252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS (NOV 2005) DFARS As prescribed in 211.273-4, use the following clause:

(a) Definition. “SPI process,” as used in this clause, means a management or manufacturing process that has been accepted previously by the Department of Defense under the Single Process Initiative (SPI) for use in lieu of a specific military or Federal specification or standard at specific facilities. Under SPI, these processes are reviewed and accepted by a Management Council, which includes representatives of the Contractor, the Defense Contract Management Agency, the Defense Contract Audit Agency, and the military departments.

(b) Offerors are encouraged to propose SPI processes in lieu of military or Federal specifications and standards cited in the solicitation. A listing of SPI processes accepted at specific facilities is available via the Internet at http://guidebook.dcma.mil/20/guidebook_process.htm (paragraph 4.2).

(c) An offeror proposing to use an SPI process in lieu of military or Federal specifications or standards cited in the solicitation shall

(1) Identify the specific military or Federal specification or standard for which the SPI process has been accepted;

(2) Identify each facility at which the offeror proposes to use the specific SPI process in lieu of military or Federal specifications or standards cited in the solicitation;

(3) Identify the contract line items, subline items, components, or elements affected by the SPI process; and

(4) If the proposed SPI process has been accepted at the facility at which it is proposed for use, but is not yet listed at the Internet site specified in paragraph (b) of this clause, submit documentation of Department of Defense acceptance of the SPI process.

(d) Absent a determination that an SPI process is not acceptable for this procurement, the Contractor shall use the following SPI processes in lieu of military or Federal specifications or standards:

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 16 OF 26 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

CONTINUED ON NEXT PAGE

(Offeror insert information for each SPI process)

SPI Process:

Facility:

Military or Federal Specification or Standard:

Affected Contract Line Item Number, Subline Item Number, Component, or Element:

(e) If a prospective offeror wishes to obtain, prior to the time specified for receipt of offers, verification that an SPI process is an acceptable replacement for military or Federal specifications or standards required by the solicitation, the prospective offeror

(1) May submit the information required by paragraph (d) of this clause to the Contracting Officer prior to submission of an offer; but

(2) Must submit the information to the Contracting Officer at least 10 working days prior to the date specified for receipt of offers.

52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997) FAR

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) FAR

52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) FAR

As prescribed in 19.309(c), insert the following clause:

(a) Definitions. As used in this clause.

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts.

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2019_3.html https://www.acquisition.gov/sites/default/files/current/far/html/52_217_221.html http://www.sba.gov/content/table-small-business-size-standards

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 17 OF 26 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

CONTINUED ON NEXT PAGE

validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code assigned to contract number .

[Contractor to sign and date and insert authorized signer's name and title].

52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES (OCT 2016) FAR

52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT EXCEEDING $15,000 (MAY 2014) FAR

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015) FAR

52.222-26 EQUAL OPPORTUNITY (SEP 2016) FAR

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014) FAR

52.222-50 COMBATTING TRAFFICKING IN PERSONS (MAR 2015) FAR

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011) FAR

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) FAR

252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM—BASIC (DEC 2016) DFARS

252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM—BASIC (DEC 2016), ALT I (DEC 2016) DFARS

252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (DEC 2016) DFARS

52.232-1 PAYMENTS (APR 1984) FAR

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002) FAR

52.232-11 EXTRAS (APR 1984) FAR

52.232-25 PROMPT PAYMENT (JAN 2017) FAR

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD MANAGEMENT (JUL 2013) FAR

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013) FAR

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN 2012) DFARS

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 18 OF 26 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

CONTINUED ON NEXT PAGE

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013) DFARS

As prescribed in 232.7004(b), use the following clause:

(a) Definitions. As used in this clause-

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

______STAND-ALONE OR COMBO_____________________________________________________

(Contracting Officer: Insert applicable document type(s).

Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

_________SEE AWARD__________________________________________________

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in

WAWF

Pay Official DoDAAC SEE AWARD Issue By DoDAAC SEE AWARD Admin DoDAAC SEE AWARD

Inspect By DoDAAC SEE AWARD Ship To Code SEE AWARD

Ship From Code SEE AWARD Mark For Code SEE AWARD

Service Approver (DoDAAC)

N/A

Service Acceptor (DoDAAC)

N/A

Accept at Other DoDAAC N/A LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” https://www.acquisition.gov/ https://wawf.eb.mil/

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 19 OF 26 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

CONTINUED ON NEXT PAGE

if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

SEE BLOCK 24 OF FORM 1155

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

SEE BLOCK 24 OF FORM 1155

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.