DLA AVIATION FORM P-53 FEB 2011 FOR OFFICIAL USE ONLY

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

1. Agency: ____________________________________, Contracting Activity: __________________________________, and Document Identification Number:____________________________.

2. The action being approved is the acquisition of supplies/services on other than a full and open competition basis.

3. The supplies/services required to meet the using activity’s needs are described as follows:

BRIEF DESCRIPTION NSN/PN QUANTITY ESTIMATED VALUE

*If too numerous, attach list of NSNs and AMSC codes

This acquisition:

[ ] will not include an option.

[ ] will include a _____ % option for increased quantity. Total estimated dollar value of option quantity is $ ____________.

[ ] will include an option to extend the term of the contract for a period of _________ exercisable in increments of ________________. Total estimated dollar of all option periods is $ ________________. The maximum dollar value of all option periods is $______________.

The total estimated dollar value of this acquisition (inclusive of any option) is $ __________.

The maximum dollar value of this acquisition (inclusive of any option) is $ _________________.

4. The statutory authority permitting other than full and open competition is:

[ ] 10 U.S.C. 2304(c)(1) - Available from only one or a limited number of sources.

[ ] 10 U.S.C. 2304(c)(2) - Unusual and Compelling Urgency.

a. Delivery in Days:_________________________

b. Current IPG1s in Units:____________________

c. Projected IPG1s in Units:___________________

d. Brief narrative supporting the situation and weapon system.

[ ] 10 U.S.C. 2304(c) - _______________________________________.

5. The acquisition is restricted to the only source(s) of supply known to have the capability of furnishing the required supplies/services. Source(s) are: (Include CAGE code) ______________________________________________

The use of the authority cited in other than 10. U.S.C. 2304(c)(2) above is based on: (please select the appropriate AMC/AMCS for the NIINs being procured).

[ ] AMC 1. Suitable for competitive acquisition for the second or subsequent time.

[ ] AMC 2. Suitable for competitive acquisition for the first time.

[ ] AMC 3. Acquire, for the second or subsequent time, directly from the manufacturer.

[ ] AMC 4. Acquire, for the first time, directly from the manufacturer.

[ ] AMC 5. Acquire directly from the sole source contractor, who is not the manufacturer.

[ ] AMSC A. The Government’s right to use data in its possession is questionable. This code is under review and will be updated when the review is complete.

[ ] AMSC B. This must be acquired from a manufacturing source(s) specified on a source control drawing.

[ ] AMSC C. This part required engineering source approval by the design control activity in order to maintain the quality of the part.

[ ] AMSC D. The data needed to acquire this part is not economically available.

[ ] AMSC H. The Government does not have sufficient, accurate, or legible data to purchase this part from other than the current source. This code is under review and will be updated when the review is complete.

[ ] AMSC K. This part must be produced from class 1 castings under MIL-STD-2175.

[ ] AMSC L. The annual buy value of this part falls below the screening threshold established by DoD.

[ ] AMSC M. Manufacture of this part requires use of master or coordinated tooling.

[ ] AMSC N. Manufacture of this part requires special test and/or inspection facilities to maintain function or system integrity.

[ ] AMSC P. The rights to use the data needed to purchase this part from additional source(s) are not owned by the Government and cannot be purchased, developed, or otherwise obtained.

[ ] AMSC Q. The Government does not have adequate data, lacks rights to data, or both. It is not economical to buy the data or rights to the data.

[ ] AMSC R. The Government does not own the data or rights to the data needed to purchase this part from another source.

It is not economical to procure the data or rights to the data.

[ ] AMSC S. Acquisition of this item is restricted to Government approved source(s) because the item involves military sensitive technology.

[ ] AMSC U. The cost to the Government to breakout this part and acquire it competitively has been determined to exceed the projected savings over the life span of the part.

[ ] AMSC V. This part has been designated a high reliability part. Probability of failure would be unacceptable. The engineering activity has determined that data to define and control reliability limits cannot be obtained.

[ ] AMSC Y. The design of this part is unstable. Engineering, manufacturing, or performance characteristics indicate that the required design objectives have not been achieved.

[ ] AMSC Z. This part is a commercial/no-developmental/off-the-shelf item.

[ ] The requisitioner has assigned a priority designator within Issue Priority Group (IPG) I.

[ ] The requisitioner has also cited an expedited handling signal of 999, N__, or E__ or an Office of the Secretary of Defense/Joint Chiefs of Staff project code beginning with a "9".

[ ] Procurement from a specified source or agency is authorized by statute ______________ (list statute).

[ ] Other___________________________________________________________________________________________.

6. Efforts to ensure that offers are solicited from as many sources as practicable are:

[ ] The acquisition will be synopsized on or about ___________ and any firm requesting a solicitation copy will be provided one.

[ ] Manufacturers of similar products identified in the market survey will be solicited.

[ ] Dealers of the manufacturers will be solicited.

[ ] A synopsis exception cited in FAR 5.202 applies (Explain):

[ ] Other (Explain): __________________________________________________________________________________

7. I hereby determine that the anticipated cost to the Government will be fair and reasonable. Discuss relevant pricing issues, including the basis for determining that the anticipated price/cost will be fair and reasonable. Also include here, or elsewhere as appropriate, length of contract, quantity, and other contract particulars bearing on the price/cost._____________________________________________________________________________________________________

8. A market survey as defined by FAR 10

[ ] was conducted, and firms indicating an interest in the acquisition will be solicited. Market research efforts, include:

[ ] was not conducted due to the unusual and compelling urgency of the requirement.

[ ] was not conducted due to:____________________________________________________________________________

9. Additional facts supporting other than full and open competition are:

[ ] Based upon the technical certification on file, technical data is not available and cannot be developed to permit full and open competition. The data presently available reflects the minimum needs of the Government.

[ ] As stated in the attached certification by the requiring activity, the Military Services will be seriously injured if contract award is delayed. The extent and nature of harm are detailed in the attached certification.

[ ] When FAR 6.302-1 is cited for follow-on acquisitions as described in 6.302-1(a)(2)(ii), an estimate of the cost to the Government that would be duplicated and how the estimate was derived.

[ ] Other: ___________________________________________________________________________________________

10. A listing of sources, if any, indicating an interest in writing in the acquisition are (if none, so state):

11. The actions, being taken to overcome barriers to competition before any subsequent acquisitions are made are (if none, so state and explain why not) .

APPROVAL

APPROVAL LEVELS OF THE JUSTIFICATION – FAR 6.304

[ ] not exceeding $650,000 Contracting Officer

[ ] over $650,000 to $12,500,000 Competition Advocate

TECHNICAL/REQUIREMENTS PERSONNEL CERTIFICATION – FAR 6.303-2(b) I certify that the facts and representations under my cognizance which are included in this justification are complete and accurate.

Technical Cognizance:

(Requirements originator) ---------------------------Signature Not Required ------------------------------------------------------------------------ (Delete the extra spaces) Name and Title Signature Phone Date

CONTRACTING OFFICER

I hereby certify that the information contained in this justification is accurate and complete to the best of my knowledge and belief. If not exceeding $650,000, this signature serves as the approval.

Name and Title Signature Phone Date

COMPETITION ADVOCATE

I have reviewed and approve this Justification $650,000 to $12,500,000.

Name and Title Signature Phone Date

Vanessa Vickers Contracting Officer 804-279-6392 3/26/2015

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION: DLA - AVIATION, FAMA
and: DLA - AVIATION, FAMA
Contracting Activity: 0057047022 SPE4A6-15-R-0524
BRIEF DESCRIPTION 1: SENSING ELEMENT, FIRE DETECTOR SYS
BRIEF DESCRIPTION 2:
BRIEF DESCRIPTION 3:
NSNPN 1: 6340-01-317-1209
NSNPN 2:
NSNPN 3:
QUANTITY 1: 44 EA
QUANTITY 2:
QUANTITY 3:
ESTIMATED VALUE 2:
ESTIMATED VALUE 3:
will not include an option:
undefined:
option for increased quantity Total estimated dollar value of option quantity is:
undefined_2:
will include an option to extend the term of the contract for a period of:
Total estimated dollar of all option periods is:
10 USC 2304c2 Unusual and Compelling Urgency:
Current IPG1s in Units:
Projected IPG1s in Units:
d 1:
d 2:
d 3:
undefined_4:
5 The acquisition is restricted to the only sources of supply known to have the capability of furnishing the required 1: MEGGITT SAFETY SYSTEMS, INC. DBA CAGE: 25693 P/N: 3800-02
5 The acquisition is restricted to the only sources of supply known to have the capability of furnishing the required 2:
undefined_5:
Procurement from a specified source or agency is authorized by statute:
Other:
The acquisition will be synopsized on or about: 3/11/15
1:
2:
Other Explain:
undefined_6:
undefined_7:
pricecost 1: DLA-Aviation does not award FFP initiatives when the price cannot be determined fair and reasonable. There is no indication that this procurement will not be determined fair and reasonable. CERTIFIED COST AND PRICING DATA IS NOT REQUIRED FOR THIS PROCUREMENT.
pricecost 2:
was conducted and firms indicating an interest in the acquisition will be solicited Market research efforts include 1: Market survey determined additional manufacturing sources could not be identified. Only two sources identified.
was conducted and firms indicating an interest in the acquisition will be solicited Market research efforts include 2:
undefined_8:
was not conducted due to the unusual and compelling urgency of the requirement:
was not conducted due to:
undefined_9:
Government that would be duplicated and how the estimate was derived:
undefined_10:
10 A listing of sources if any indicating an interest in writing in the acquisition are if none so state: NONE
and explain why not: The government cannot evaluate alternate proposals as the item is described in a non-government source controlled drawing. The solicitation is to contain provision 52.217-9023
undefined_11: which directs interested parties to the owner of the source controlled drawing for evaluation and approval in order to be added to the drawing.
Check Box4: Off
Check Box5: Yes
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Yes
Check Box13: Yes
Check Box14: Off
Check Box15: Yes
Check Box16: Yes
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box36: Off
Check Box38: Yes
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Yes
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Yes
Check Box1: Off
Check Box2: Off
Check Box3: Off

File details come from the government source that posted it. Updated .