Text version

leishaw Typewritten Text G.S Precision,INC leishaw Typewritten Text leishaw Typewritten Text leishaw Typewritten Text Sales Engineering MGR 6/30/2014 leishaw Typewritten Text gpp4995 Typewritten Text

30 JUNE 2014

CONTINUED ON NEXT PAGE

This AWARD is for an INDEFINITE DELIVERY PURCHASE ORDER (IDPO) for a Base Period of THREE (3) years plus one Option Period of TWO (2) years.

THIS ACQUISITION IS A TOTAL SMALL BUSINESS SET-ASIDE. CONFIGURATION CONTROL APPLIES.

NSN 3120011443963

The Guaranteed Minimum of 660 each is applicable to the base period only.

There is no guarantee that the Government will place any orders after the guaranteed minimum of base period of the contract/order.

The following quantities are applicable to both the base and option periods:

Minimum Delivery Order Quantity: 660 each Maximum Delivery Order Quantity: 1321 each

BASE PERIOD (YEARS 1-3)

EACH $_____8.91______

OPTION PERIOD (YEARS 4-5)

EACH $___________

REQUIRED DELIVERY IS: 112 DARO

PARTIAL OR EARLY DELIVERIES ARE AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.

"Ship to" addresses will be identified on each individual delivery order.

All deliveries will be within the continental United States.

DESTINATION INSPECTION/ACCEPTANCE REQUIRED.

FOB ORIGIN

See PID/PACK Text

All applicable solicitation clauses (SPE4A614X1069) are incorporated by reference.

This award is being issued under the First Destination Transportation (FDT) program. For FDT program transportation requirements, see DLAD clause 52.247-9059 F.o.b. Origin, Government Arranged Transportation and 52.247-9058, First Destination Transportation (FDT) Program – Shipments Originating Outside the contiguous United States (OCONUS).

Additional information about FDT can be found on the FDT website (http://www.dla.mil/FDTPI/).

AWARDEE/MANUFACTURER/PACKAGING CAGE: 56946

Company Name: G. S. PRECISION, INC.

Address: 101 JOHN SEITZ DR City: BRATTLEBORO Zip: 05301-3642

CAO-ADP: S0701A-HQ0337

State: VT Voice Phone Number: (802)257-5200

COGNIZANT DCMA OFFICE: S0701A

Name: DCMA HARTFORD Phone Number: 860-291-7702 Fax Number: 860-291-7905 E-Mail: DCMAHARTFORDSENIORLEADERS@DCMA.MIL Address: 130 DARLIN STREET

EAST HARTFORD, CT 06108-3234

PAGE 2 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SPE4A6-14-D-5981

52.211-9G22 DLA AVIATION PALLETIZATION FOR MIL-STD-2073 IN ACCORDANCE WITH MD00100452 REVISION B (JUL 2008)

(a) Palletization.

(1) When the total number of containers going to the same destination is 250 pounds or greater (excluding pallet) or a volume of 20 cubic feet or greater, then palletization IAW MIL-STD-147 is required.

(2) When the total number of containers going to the same destination is less than 250 pounds (excluding pallet) and is less than 20 cubic feet, then palletization is not required IAW MIL-STD-147.

(3) Except as otherwise provided in this clause, shipping containers shall be palletized IAW the guidance cited in MIL-STD-147. Special palletization instructions may be further specified under other preparation for delivery instructions in this order/contract. In the case of any inconsistency between such special palletization instructions in the requirements cited in this clause, the special palletization instructions shall take precedence.

(4) Pallets required for use, shall comply with ANSI/MH1, Part No. MH1/9-02SW4048. This part number shall be used for Level A packaging when the total weight is less than 1500 lbs. evenly distributed. This part number shall be used for Level B packaging when the total weight is greater than 1500 lbs., but less than 3000 lbs. evenly distributed.

***NOTE*** Use of nonstandard commercial pallets is forbidden unless cited in the contract/purchase order.

(i) The following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Non-Manufactured Wood Packaging Material (NMWPM) entering a European country or destined for a Container Consolidation Point (CCP) or an aerial or water port of embarkation: All wooden pallets and wood containers produced entirely or in part of non-manufactured softwood species shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) coniferous material and certified accordingly by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with Non-manufactured Wood Packing Policy and Non-manufactured Wood Packing Enforcement Regulations both dated May 30, 2001. All wooden pallets and containers produced entirely of non-manufactured hardwood species shall be identified by a permanent marking of "NC," 1.25 inches or greater in height, accompanied by the CAGE code of the contracted manufacturer and the month and year of the contract. On pallets, the marking shall be applied to the stringer or block on opposite sides and ends of the pallet and be contrasting and clearly visible. On containers, the marking shall be applied on a side other than the top or bottom, contrasting and clearly visible.

(ii) Oak and chestnut wood shall be bark free and square edged so that none of the natural rounded surface tissues remain, or be bark free and have a moisture content no greater than 20%. The contractor is responsible for performing an inspection of each shipment to assure compliance with this requirement.

(5) Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums (see paragraph 5(i) thru (iv), shall be palletized IAW Load Type VI of MIL-STD-147. Pallets used shall be as cited above. "Hazardous Material" for the purpose of this clause, means any material considered hazardous under the Department of Transportation Hazardous Material Regulations, 49 CFR 171-79, IATA, IACO, IMDG, unless otherwise specified.

***NOTE*** Shrink wrap is not authorized for use with Hazardous Materials.

PAGE 3 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(i) 55 gallon drums for domestic delivery shall be palletized 3 per pallet IAW with load type 3a bonding method G (stretch wrap) or 4 per pallet IAW load type VI of MIL-STD-147 (placing an inverted wood cap under and over the load secured by metal strapping).

(ii) 55 gallon drums for export delivery shall be palletized 4 per pallet IAW load type VI of MIL-STD-147 (placing an inverted wood cap under and over the load secured by metal strapping).

(iii) Cylinders for domestic delivery shall be palletized vertically IAW load type IX of MIL-STD-147 or horizontally using metal strapping IAW MIL-STD-147 bonding method D (figure 36) and notched wood spacers (storage aid #25, figure 50) to assure the stability of the load.

(iv) Cylinders for export delivery shall be Palletized (vertically) IAW load type IX of MIL-STD-147.

(6) The use of stretch-wrap, shrink film or nonmetallic strapping for bonding is not authorized for "Export Shipments".

(7) Stretch-wrap, when utilized, shall be accomplished mechanically with a (machine or hand held tool that based on the weight of items being palletized, maintains sufficient tension to assure secure bonding of the items to the pallet during transportation).

(8) Unless otherwise specified in the contract or Purchase Order, all polyethylene/plastic containers for domestic delivery with or without fiberboard over pack shall be palletized IAW load type 3a bonding method G (stretch wrap) or IAW Load "Type VI of MIL-STD-147 to ensure stacking support during transportation and storage. All polyethylene/plastic containers for export delivery with or without fiberboard over pack shall be palletized IAW Load Type VI of MIL-STD-147.

(b) Loading: Five-gallon tight head pails shall be loaded on pallets IAW Load Type III or IIIA of MIL-STD-147, except that a triple layer or course may be used for a total not to exceed 42 pails.

(c) Unitization: Supplies that do not lend themselves to the use of MIL-STD-147 palletization due to size, weight, configuration, etc. shall be unitized by securely blocking, bracing, or anchoring the load on a skid base or commercial type pallet in a manner that assures safe delivery.

52.211-9G73 PACKAGING AND MARKING AND REQUIREMENTS (MAR 2004)

(a) Unless stated otherwise, commercial packaging in accordance with ASTM-D-3951 is required for CONUS shipments from the contractor directly to the customer. Commercial packaging and marking is not sufficient for vendor shipments requiring movement through the Defense Transportation System (also referred to as the Military Distribution System or DLA Depot) as the shipment could ultimately be moved via Military Air.

PAGE 4 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(b) Higher level packaging in accordance with MIL-STD-2073 is mandatory for all shipments that meet the below criteria:

• Movement through the Defense Transportation System including shipments to a Military Distribution facility or depot.

• OCONUS shipments

• FMS shipments

• Hazardous material, as cited in the AID or in the Quality Requirements Matrix.

(c) Materials not considered as HAZMAT for CONUS or OCONUS commercial air shipments may be considered HAZMAT for MILAIR shipments OCONUS. As such, contractors/shippers shall ensure that material meeting HAZMAT definitions in DLAI 4145.3, Preparing Hazardous Materials for Military Air Shipment, is packaged in accordance with that instruction when the consignee is OCONUS and the shipment will be moved through the Defense Transportation System.

(d) All items shall be marked in accordance with MIL-STD-129P. Hazardous items and shelf life items, as cited in the AID or in the Quality Requirements Matrix, shall be marked in accordance with MIL-STD-129P and the appropriate clauses cited in the appendix to the matrix and the contract. The contractor is required to package material in accordance with Quantity Unit Pack (QUP), specified in MIL-STD-2073 and the Unit of Issue (UI), specified in each delivery order. A packing slip shall be located in a plastic pouch on the outside of the package. For HAZMAT destined OCONUS, a hard copy of the Material Safety Data Sheet (MSDS) must also be included.

(e) In the event of deployments, this clause may be invoked when shipments originally destined for a CONUS location are diverted to OCONUS destinations thereby necessitating movement of the material through the Defense Transportation System. In such an event, contractors will be notified by the Contracting Officer and an equitable adjustment will be made in the contract price as deemed appropriate.

NOTE: Applicable to negotiated solicitations. Offers that do not comply with the packaging and marking requirements as specified in Section D of this solicitation may be subject to rejection as being technically unacceptable.

52.246-9003 Measuring and Test Equipment

MEASURING AND TEST EQUIPMENT (JAN 2014)

Notwithstanding any other clause to the contrary, and/or in addition thereto, the Contractor shall ensure that the gauges and other measuring and testing equipment, used in determining whether the supplies presented to the Government for acceptance under this contract fully conform to specified technical requirements, are calibrated in accordance with International Organization for Standardization (ISO) 10012:2003 or American National Standards Institute (ANSI)/National Conference of Standards Laboratories

(NCSL) Z540.3 (R2013).

52.246-9G36 CONFIGURATION CONTROL DSCR (JUN 2003)

NOTICE TO CONTRACTORS: The requirements of this clause are identified to MIL-STD-973. DSCR will continue to reference MIL-STD-973 in solicitations and contracts until implementation of DLA configuration control requirements. The full text of MIL-STD-973 is available at:

http://www.dscr.dla.mil/userweb/dscrbat/qaps.htm

PAGE 5 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(a) When configuration management control is cited in the Procurement Item Description, the furnished item(s) shall conform to the approved configuration requirements/revision specified unless a variation is processed and approved as provided for at (b) below.

(b) Variations shall be identified and approval obtained in accordance with MIL-STD-973 dated 17 APR 92, with Interim Notice 3 dated 12 JAN 95 as follows:

(1) Process an Engineering Change Proposal for any changes to the approved configuration in accordance with Paragraph 5.4.2 and Subparagraphs thereto and APPENDIX D, except that Subparagraphs 5.4.2.3.1, 5.4.2.3.5.1, and 5.4.2.3.5.2 do not apply.

(2) Process requests for deviation from the approved configuration in accordance with Paragraph 5.4.3 and Subparagraphs thereto and APPENDIX E.

(3) Process requests for waiver from the approved configuration in accordance with Paragraph 5.4.4 and Subparagraphs thereto and APPENDIX E.

(4) Process requests for parts substitution from the approved configuration in accordance with Paragraph 5.4.5 and Subparagraphs thereto.

(5) Process Specification Change Notices in accordance with Paragraph 5.4.6 and Subparagraphs thereto and APPENDIX F.

(6) Process Notices of Revision (NORS) in accordance with Paragraph 5.4.7 and APPENDIX G.

(7) Process configuration control (short form procedure) in accordance with Paragraph5.4.8 and Subparagraphs thereto and

APPENDIX D.

PAGE 6 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SECTION B

SUPPLIES/SERVICES: 3120-01-144-3963

ITEM DESCRIPTION:

BUSHING,SLEEVE

CONFIGURATION CONTROL

GENERAL ELECTRIC COMPANY

CAGE:99207

DRAWING: 4054T94

4054T94P07

52.246-11 Higher LevelContract Quality Requirement (Manufacturers)

FAR CLAUSE 52.246-11 APPLIES. A QUALITY MANAGEMENT PROGRAM MEETING THE

REQUIREMENTSOF ISO 9001:2008; A PROGRAM COMPARABLE TO ISO 9001:2008

(EXAMPLE SAE AS 9100), THE FOLLOWING TAILORED VERSION OF ISO 9001:2008;

OR A PROGRAM COMPARABLE TO THE TAILORED VERSION OF ISO 9001:2008

(EXAMPLE SAE AS 9003) IS REQUIRED. MIL-I-45208 AND MIL-Q-9858ARE

OBSOLETE AND NO LONGER CONSIDERED SUITABLE WHEN HIGHER LEVEL QUALITY IS

REQUIRED. IN THE TAILORED VERSION OF THE ISO 9001:2008,ANY REFERENCES

WHICH CITE THE ENTIRE INTERNATIONAL STANDARD ARE INTERPRETED AS

EXCLUSIONS TO THIS DOCUMENT.

DLA TAILORED HIGHERLEVEL QUALITY CLAUSE FROM ISO 9001:2008

4.1 General requirements, [excluding reference to 1.2 and excluding NOTE 3 c)] 4.2.1General, [excluding subparagraph a)]

4.2.2 Quality manual, [excluding subparagraph a)]

4.2.3 Control of documents

4.2.4 Control ofrecords

5.1 Management commitment

5.3 Quality policy

6.2.2 Competence, training and awareness

6.4 Work environment

7.1 Planning ofproduct realization, [excluding NOTE 2]

7.2.1 Determination of requirements related to the product

7.2.2 Review of requirementsrelated to the product

7.2.3 Customer communication

7.3.7 Control of design and development changes

7.4.1 Purchasing process

7.4.3Verification of purchased product

7.5.1 Control of production and service provision

7.5.3 Identification and traceability

7.5.4Customer property

7.5.5 Preservation of product

7.6 Control of monitoring and measuring equipment

8.1 General, [excludingsubparagraph b) and subparagraph c)]

8.2.2 Internal audit

8.2.4 Monitoring and measurement of product

8.3 Control of nonconformingproduct

8.5.2 Corrective action

8.5.3 Preventive action

APPROVED SOURCE(S):

PAGE 7 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SUPPLY/SERVICE: 3120-01-144-3963 CONT'D

GS PRECISION

CAGE: 56946

CONFIGURATION CONTROL ITEMIAW CITED DRAWING AND/OR PART NUMBER.

DOCUMENTATION REQUIREMENTS OF CLAUSE 52.211-9042 APPLY FOR

NEW OFFERORS NOT CITED HEREIN.

ITEM IDENTIFICATION IAW MIL-STD-130N, DTD 17-DEC-2007.

SAMPLING:

1. SAMPLING FOR INSPECTION AND TESTING SHALL BE IAWANSI/ASQ

Z1.4-2008, DATED JAN 1, 2008. ANY ALTERNATE PLAN MUST BE

APPROVED BY THE PCO. A SAMPLING PLAN THAT ACCEPTS ON ZERO

DEFECTS IS REQUIRED

2. ANY DEFECTIVE ITEM DISCOVERED DURING INSPECTION MAY BE CAUSE

FOR REJECTION OF THE ENTIRE CONTRACT QUANTITY.

G. S. PRECISION, INC. DBA 56946 P/N 4054T94P07

GENERAL ELECTRIC COMPANY DBA GE 99207 P/N 4054T94P07

IAW REFERENCE DRAWING NR 992074054T94

REVISION NR K DTD 10/02/2001

PART PIECE NUMBER: 4054T94P07

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 3120-01-144-3963 ** EA $ ** $ **

BUSHING,SLEEVE

**TO BE CITED IN EACH DELIVERY ORDER

PRICING TERMS: Firm Fixed Price

BASE PERIOD.

SUPPLIES/SERVICES: 3120-01-144-3963

Delivery CLIN Price (in days) .

0001 $ 8.91 112

OPTION 01

SUPPLIES/SERVICES: 3120-01-144-3963

PAGE 8 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SUPPLY/SERVICE: 3120-01-144-3963 CONT'D

Delivery CLIN Price (in days) .

0001 $ ** **

**SEE REMARKS PAGE(S)

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: DESTINATION

ACCEPTANCE POINT: DESTINATION

FOB: ORIGIN DELIVERY DATE:

PREP FOR DELIVERY:

PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999

QUP = 001: PRES MTHD = 33: CLNG/DRY = 1: PRESV MAT = XX:

WRAP MAT = XX: CUSH/DUNN MAT = XX: CUSH/DUNN THKNESS = X:

UNIT CONT = XX: OPI = M:

INTRMDTE CONT = E5: INTRMDTE CONT QTY = AAA:

PACK CODE = U:

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE: 00 -

PALLETIZATION SHALL BE INACCORDANCE WITH MD00100452 REV B

DATED 08183

Markings Paragraph When ASTM D3951, Commercial Packaging is specified, the following apply:

•,,All Section “D” Packaging and Marking Clauses take precedence over

ASTM D3951.

•,,In addition to requirementsin MIL-STD-129, when Commercial Packaging is used, the Method of Preservation for all MIL-STD-129 marking and labeling shall be“CP” Commercial Pack.

•,,The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) as specified in the contract take precedence over QUP in ASTM D3951.

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 1000026433 0001 N/A N/A N/A N/A

PAGE 9 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SECTION D - PACKAGING AND MARKING

252.211-7006 RADIO FREQUENCY IDENTIFICATION (SEP 2011) DFARS

(b)(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall affix passive RFID tags, at the case- and palletized-unit-load packaging levels, for shipments of items that—

(i) Are in any of the following classes of supply, as defined in DoD 4140.1-R, DoD Supply Chain Materiel Management Regulation, AP1.1.11:

(A) Subclass of Class I – Packaged operational rations.

(B) Class II – Clothing, individual equipment, tentage, organizational tool kits, hand tools, and administrative and housekeeping supplies and equipment.

(C) Class IIIP – Packaged petroleum, lubricants, oils, preservatives, chemicals, and additives.

(D) Class IV – Construction and barrier materials.

(E) Class VI – Personal demand items (non-military sales items).

(F) Subclass of Class VIII – Medical materials (excluding pharmaceuticals, biologicals, and reagents – suppliers should limit the mixing of excluded and non-excluded materials).

(G) Class IX – Repair parts and components including kits, assemblies and subassemblies, reparable and consumable items required for maintenance support of all equipment, excluding medical-peculiar repair parts; and

(ii) Are being shipped to one of the locations listed at http://www.acq.osd.mil/log/rfid/ or to—

(A) A location outside the contiguous United States when the shipment has been assigned Transportation Priority 1, or to—

(B) The following location(s) deemed necessary by the requiring activity:

Contract Line, Subline, or Exhibit Line Item Number

Location Name

City

State

DoDAAC

(2) The following are excluded from the requirements of paragraph (b)(1) of this clause:

(i) Shipments of bulk commodities.

(ii) Shipments to locations other than Defense Distribution Depots when the contract includes the clause at FAR 52.213-1, Fast Payment Procedures.

(c) The Contractor shall—

(1) Ensure that the data encoded on each passive RFID tag are globally unique (i.e., the tag ID is never repeated across two or more RFID tags and conforms to the requirements in paragraph (d) of this clause;

(2) Use passive tags that are readable; and

(3) Ensure that the passive tag is affixed at the appropriate location on the specific level of packaging, in accordance with MIL-STD-129 (Section 4.9.2) tag placement specifications.

(d) Data syntax and standards. The Contractor shall encode an approved RFID tag using the instructions provided in the EPC™ Tag Data Standards in effect at the time of contract award. The EPC™ Tag Data Standards are available at http://www.epcglobalinc.org/standards/.

(1) If the Contractor is an EPCglobal™ subscriber and possesses a unique EPC™ company prefix, the Contractor may use any of the identifiers and encoding instructions described in the most recent EPC™ Tag Data Standards document to encode tags.

(2) If the Contractor chooses to employ the DoD identifier, the Contractor shall use its previously assigned Commercial and Government Entity (CAGE) code and shall encode the tags in accordance with the tag identifier details located at http://www.acq.osd.mil/log/rfid/tag_data.htm. If the Contractor uses a third-party packaging house to encode its tags, the CAGE code of the third-party packaging house is acceptable.

(3) Regardless of the selected encoding scheme, the Contractor with which the Department holds the contract is responsible for ensuring that the tag ID encoded on each passive RFID tag is globally unique, per the requirements in paragraph (c)(1).

(e) Advance shipment notice. The Contractor shall use Wide Area WorkFlow (WAWF), as required by DFARS 252.232-7003, Electronic Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph

(d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/.

PAGE 10 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SPE4A6-14-D-5981

http://www.acq.osd.mil/log/rfid/ http://www.epcglobalinc.org/standards/ http://www.acq.osd.mil/log/rfid/tag_data.htm http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/%20https:/wawf.eb.mil/

(End of clause)

52.211-9010 SHIPPING LABEL REQUIREMENTS – MILITARY-STANDARD (MIL-STD) 129P (MAR 2012) DLAD

52.211-9010 SHIPPING LABEL REQUIREMENTS – MILITARY STANDARD (MIL-STD) 129P (NOV 2011), ALT I (AUG 2005)

DLAD

52.211-9033 PACKAGING AND MARKING REQUIREMENTS (APR 2008) DLAD

52.211-9095 PALLETIZATION OF SHIPMENTS (SEP 2012) DLAD

52.246-9062 REPACKAGING TO CORRECT PACKAGING DEFICIENCIES (SEP 2008) DLAD

52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM) (FEB 2007) DLAD

SECTION E - INSPECTION AND ACCEPTANCE

52.211-9023 SUBSTITUTION OF ITEM AFTER AWARD (NOV 2011) DLAD

52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (FEB 1999) FAR

The Contractor shall comply with the higher-level quality standard selected below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]

Title Number Date Tailoring

[X] ISO 9001:2008 OR

EQUIVALENT

[Contracting Officer insert the title, number (if any), date, and tailoring (if any) of the higher-level quality standards.] (End of clause)

52.246-9003 MEASURING AND TEST EQUIPMENT (JAN 2014) DLAD

52.246-9007 INSPECTION AND ACCEPTANCE AT DESTINATION (AUG 2007) DLAD

SECTION F - DELIVERIES OR PERFORMANCE

52.211-16 VARIATION IN QUANTITY (APR 1984) FAR

(b) The permissible variation shall be limited to:

0 Percent increase 0 Percent decrease This increase or decrease shall apply to ALL CLINS / ALL DELIVERY ORDERS .

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989) FAR

52.211-9020 TIME OF DELIVERY - ACCELERATED (JUN 2008) DLAD

52.211-9054 TIME OF DELIVERY – NEGOTIATED IQCs AND SIMPLIFIED ACQUISITIONS FOR IDPOs (NOV 2011) DLAD

(b) Delivery is required in accordance with the schedule set forth below.

WITHIN THE NUMBER OF DAYS STATED BELOW AFTER DATE OF DELIVERY ORDER

NSN(S) QUANTITY (PER GOVERNMENT OFFEROR’S

PAGE 11 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CALENDAR MONTH) REQUIRED PROPOSED

3120011443963 Up to 1321 each 112 DARO Each additional each (or less) ADD:

Up to each Each additional each (or less) ADD:

Up to each Each additional each (or less) ADD:

Up to each Each additional each (or less) ADD:

52.242-15 STOP-WORK ORDER (AUG 1989) FAR

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR

52.247-29 F.O.B. ORIGIN (FEB 2006) FAR

52.247-9031 MANUFACTURER'S LOADING PRACTICES (NOV 2011) DLAD

52.247-9056 ADDENDUM TO FAR 52.247-29 FREE ON BOARD (F.O.B.) ORIGIN (SEP 2012) DLAD

The offeror/contractor shall identify the location of origin below.

[ ] Same as Offeror (the Offeror shall fill in the city and state):

[ ] Other (the Offeror shall fill-in the city and state):

City

State

52.247-9059 F.O.B. Origin, Government Arranged Transportation (OCT 2013) DLAD

52.247-9034 POINT OF CONTACT FOR TRANSPORTATION INSTRUCTIONS (JUN 2013) DLAD

52.247-9058 FIRST DESTINATION TRANSPORTATION (FDT) PROGRAM - SHIPMENTS ORIGINATING FROM OUTSIDE THE

CONTIGUOUS UNITED STATES (OCONUS) (JUL 2013) (DLAD)

(a) Contiguous United States (CONUS) is defined as being in the 48 contiguous states and the District of Columbia.

(b) This acquisition is being conducted under the Firste Destination Transportation (FDT) Initiative. Delivery Terms are f.o.b. origin.

Inspection and acceptance by the Government will occur at destination unless otherwise specified in the solicitation.

(c) For Offerors whose shipments will originate from outside CONUS (OCONUS), the Offeror's f.o.b. origin price shall include transportation to a CONUS location that the Offeror selects based on cost-effectiveness or other variables at the Offeror's discretion.

This location shall be deemed the origin point for purposes of the f.o.b. origin terms and conditions of the solicitation/order/contract. The Offeror shall identify this CONUS location as the pick-up point in the Vendor Shipment Module (VSM) at https://vsm.distribution.dla.mil.

(End of Clause)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

52.246-9039 REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES (NOV 2011) DLAD

(a) The Contractor shall remove or obliterate from a rejected end item and its packing and packaging, any marking, symbol, or other representation that the end item or any part of it has been produced or manufactured for the United States Government. Removal or obliteration shall be accomplished prior to any donation, sale, or disposal in commercial channels. The Contractor, in making disposition in commercial channels of rejected supplies, is responsible for compliance with requirements of the Federal Trade Commission Act (15 United States Code (U.S.C.) 45 et seq.) and the Federal Food, Drug and Cosmetic Act (21 U.S.C. 301 et seq.), as well as other Federal or State laws and regulations promulgated pursuant thereto.

(b) Unless otherwise authorized by the Contracting Officer, the Contractor is responsible for removal or obliteration of government identifications within 72 hours of rejection of nonconforming supplies including supplies manufactured for the Government but not offered or supplies transferred from the Government's account to the cold storage Contractor's account at origin or destination. (For product rejected at destination and returned to the Contractor's plant, the 72 hour period starts with the time of Contractor receipt of

PAGE 12 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

returned product). After removal or obliteration is accomplished and prior to disposition, the Contractor must notify the Government inspector.

(End of Clause)

SECTION I - CONTRACT CLAUSES

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013) DFARS

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUL 2013) FAR

252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013) DFARS

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS

252.204-7004 ALTERNATE A, SYSTEM FOR AWRD MANAGEMENT (FEB 2014) DFARS

252.204-7012 SAFEGUARDING OF UNCLASSIFIED CONTROLLED TECHNICAL INFORMATION (NOV 2013) DFARS

52.209-06 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR SUSPENSION (AUG 2013) FAR

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008) FAR

252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS (NOV 2005) DFARS

(4) If the proposed SPI process has been accepted at the facility at which it is proposed for use, but is not yet listed at the Internet site specified in paragraph (b) of this clause, submit documentation of Department of Defense acceptance of the SPI process.

(d) Absent a determination that an SPI process is not acceptable for this procurement, the Contractor shall use the following SPI processes in lieu of military or Federal specifications or standards:

(Offeror insert information for each SPI process) SPI Process:

Facility:

Military or Federal Specification or Standard:

Affected Contract Line Item Number, Subline Item Number, Component, or Element:

52.211-9002 PRIORITY RATING (NOV 2011) DLAD

52.211-9004 PRIORITY RATING FOR VARIOUS LONG-TERM CONTRACTS (NOV 2011) DLAD

52.211-9007 WITHHOLDING OF MATERIEL REVIEW BOARD (MRB) AUTHORITY - CRITICAL SAFETY ITEMS (NOV 2011)

DLAD

52.211-9052 NOTIFICATION TO GOVERNMENT OF AND CONTEMPLATED PRODUCTION PHASE-OUT (NOV 2011) DLAD

52.211-9061 TIME OF DELIVERY (OVERLAPPING ORDERS) INDEFINITE DELIVERY CONTRACT (IDC) (NOV 2011) DLAD

The Government requires delivery to be made according to the following schedule:

PAGE 13 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

REQUIRED DELIVERY SCHEDULE

ITEM NUMBER QUANTITY WITHIN DAYS AFTER DATE OF CONTRACT

(Any balance shall be delivered at the rate of every days thereafter.)

In the event of overlapping orders, the contractor is not required to deliver any more than in any day period.

OFFEROR’S PROPSED DELIVERY SCHEDULE

ITEM NUMBER QUANTITY WITHIN DAYS AFTER DATE OF CONTRACT

(Any balance shall be delivered at the rate of every days thereafter) In the event of overlapping orders, the contractor is not required to deliver any more than in any day period.

(End of Clause)

52.213-9012 INDEFINITE DELIVERY PURCHASE ORDER (IDPO) - BILATERAL (APR 2014) DLAD

(a) The contractor agrees that it will accept additional orders under the same terms and conditions specified in the order. This agreement becomes binding upon delivery of the initial order, which is the minimum quantity for this IDPO. The initial delivery order represents the minimum quantity for this IDPO, and the Government is under no obligation to place additional orders under this contract. The Government may place additional orders for a period of 5 year(s) from the date of the basic order. All additional orders will reference the initial order. The aggregate value of all orders shall not exceed the simplified acquisition threshold. Therefore, the maximum value under the IDPO is $150,000, or $6,500,000 for acquisitions conducted under Federal Acquisition Regulation (FAR) Subpart 13.5.

(b) Evaluation of Quotes. If quotes include variable pricing based upon conditions such as quantity ranges, transportation zones, and/or option years, quotes will be evaluated by establishing an average unit price. The average unit price will be established for awards under $150,000, by adding all unit prices together, then dividing the sum by the number of unit prices. For acquisitions conducted under FAR Subpart 13.5 that exceed $150,000, quotes will be evaluated in accordance with

52.215-08 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997) FAR

52.216-19 ORDER LIMITATIONS (OCT 1995) FAR

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 660 EA, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor—

(1) Any order for a single item in excess of 1321 EA ;

(2) Any order for a combination of items in excess of ; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d ) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

52.216-22 INDEFINITE QUANTITY (OCT 1995) FAR

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity

PAGE 14 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period ; provided, that the Contractor shall not be required to make any deliveries under this contract after 06/29/2019 (End of clause)

252.216-7006 ORDERING (MAY 2011) DFARS

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from DATE OF AWARD through 06/29/2019 [insert dates].

52.216-9007 CONTRACT AND DELIVERY ORDER LIMITATIONS (NOV 2011) DLAD

[ X ] (a) Delivery orders will specify delivery no less than 112 DARO days from the date of order. Changes or cancellations to delivery orders may be made by giving the contractor notice no less than 14 days [remembering that days are always calendar days unless otherwise defined] before the required delivery date.

(b) Maximum Contract Limitation. The maximum quantity or maximum dollar value that may be ordered against this contract is TOTAL

CONTRACT VALUE SHALL NOT EXCEED $150,000.00.

(c) Guaranteed Minimum.

(1) The Government guarantees that it will order under this contract (and under the contract awarded for any partial set-aside) the following minimum, as applicable:

[ ] (i) Base period of one year.

(Quantity) (Percentage of the annual estimated quantity or dollar value) [ X ] (ii) Base period of two or more years.

660 EA (Quantity) multiplied by .

(Percentage) multiplied by .

[ ] (iii) The following minimum quantities within the time periods prescribed (quarter (QTR) represents a three-month period computed from date of award):

CLIN

FIRST QTR

SECOND QTR

THIRD QTR

FOURTH QTR

[ ] (iv) The contractor will not be obligated to honor any order with F .O.B. Destination terms that requires delivery to a single destination of a quantity less than that shown below:

CLIN MINIMUM QUANTITY PER DESTINATION

(d) If this is an Invitation for Bids (IFB) and the Government elects to award a different quantity than that solicited or bid upon, the delivery schedule will be changed in direct proportion to the change in quantity. If this solicitation involves a partial set-aside, the Government will consider each destination (or combined destinations) separately in awarding the set-aside portion. The destination(s) appearing on page(s) is (are) the non set-side portion.

(End of Clause)

52.216-9023 ADDITIONAL ORDERING LIMITATION (APR 2008) DLAD

52.216-9024 ADJUSTMENT TO ORDERING PERIOD (APR 2008) DLAD

(a) The ordering period established in FAR Clause 52.216-18 is based upon the assumption that an award will be made by 06/30/2014 . The ordering period specified in 52.216-18 will be extended by the number of calendar days after the date that the contract is, in fact, awarded.

52.217-09 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) FAR

PAGE 15 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 DAYS [insert the period of time within which the Contracting Officer may exercise the option]; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 DAYS days [60 days unless a different number of days is inserted] before the contract expires.

The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 YEARS (months) (years).

(End of clause)

52.219-06 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) FAR

52.219-06 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011), ALT I (NOV 2011) FAR

52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) FAR

(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it [X ] is, [] is not a small business concern under NAICS Code 332991 assigned to contract number .

[Contractor to sign and date and insert authorized signer’s name and title]:

Signature: ______________________________________

Date: ______________________________________

Title: ______________________________________ (End of clause)

52.222-03 CONVICT LABOR (JUN 2003) FAR

52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES (JAN 2014) FAR

52.222-20 WALSH-HEALEY PUBLIC CONTRACTS ACT (OCT 2010) FAR

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999) FAR

52.222-26 EQUAL OPPORTUNITY (MAR 2007) FAR

52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010) FAR

52.222-50 COMBATTING TRAFFICKING IN PERSONS (FEB 2009) FAR

252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (MAY 2011) DFARS

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) FAR

252.225-7001 BUY AMERICAN ACT AND BALANCE OF PAYMENTS PROGRAM (DEC 2012) DFARS

252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM (DEC 2012), ALT I (JAN 2014) DFARS

252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (JUN 2012) DFARS

52.232-01 PAYMENTS (APR 1984) FAR

52.232-08 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002) FAR

52.232-11 EXTRAS (APR 1984) FAR

52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986) FAR

PAGE 16 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

52.232-25 PROMPT PAYMENT (JUL 2013) FAR

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006) DFARS

52.232-9010 ACCELERATED PAYMENTS TO SMALL BUSINESS (APR 2014) DLAD

52.233-01 DISPUTES (JUL 2002) FAR

52.233-03 PROTEST AFTER AWARD (AUG 1996) FAR

52.233-04 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) FAR

52.243-01 CHANGES - FIXED PRICE (AUG 1987) FAR

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991) DFARS

52.244-06 SUBCONTRACTS FOR COMMERCIAL ITEMS (DEC 2013) FAR

52.246-9054 WARRANTY ACCEPTANCE OF SUPPLLIES (NOV 2011) DLAD

52.246-9066 DOCUMENTATION OF TRACEABILITY (JAN 2009) DLAD

252.247-7023 TRANSPORATION OF SUPPLIES BY SEA (APR 2014) DFARS

52.248-01 VALUE ENGINEERING (OCT 2010) FAR

(3) The source of the savings (the instant contract, or concurrent and future contracts), as follows:

CONTRACTOR'S SHARE OF NET ACQUISITION SAVINGS (Figures in percent) Contract Type : ______________ __________________ Incentive (Voluntary) : ___________________ _________ Program Requirement (Mandatory) : _____ ___________ Instant Contract Rate Concurrent and Future Contract Rate : ________ __ _____ Instant Contract Rate : ________________ __________ _ Concurrent and Future Contract Rate : _ ______________

(m) Data. The Contractor may restrict the Government’s right to use any part of a VECP or the supporting data by marking the following legend on the affected parts:

These data, furnished under the Value Engineering clause of contract ________ ________ , shall not be disclosed outside the Government or duplicated, used, or disclosed, in whole or in part, for any purpose other than to evaluate a value engineering change proposal submitted under the clause .

52.249-01 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT FORM) (APR 1984) FAR

52.249-08 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984) FAR

52.252-02 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) FAR

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.dla.mil/Acquisition and http://farsite.hill.af.mil/ .

(End of Clause)

52.252-06 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) FAR

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any DoD FAR Supplement (DFARS) (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

PAGE 17 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SPE4A6-14-D-5981

http://www.dla.mil/Acquisition http://farsite.hill.af.mil/

(End of Clause)

52.253-01 COMPUTER GENERATED FORMS (JAN 1991) FAR

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUL 2013) (FAR)

PAGE 18 OF 18 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

Word Bookmarks
D
P1802_100620
E
F
H
I
wp1115080
wp1115081
2014-06-30T15:39:41-0400
ALEXANDER.RICHARD.DEAN.JR.1263385990

File details come from the government source that posted it. Updated .