ATTACHMENT_2_-_SCHEDULE_OF_SUPPLIES.docx
DOCX document 17 KB Posted
- Attached to
- NITROGENE/ACETYLENE RENTAL Federal contract opportunity
- Solicitation number
- SP330019Q0097
- Issued by
- Defense Logistics Agency Distribution
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_30_AMENDMENT_0001.pdf | ||
| ATTACHMENT_1_-_STATEMENT_OF_WORK.pdf | ||
| Combined_Synopsis-Solicitation_-_SP330019Q0097.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Official Use Only
ATTACHMENT 2 SCHEDULE OF SUPPLIES
PERIOD OF PERFORMANCE:
8/19/2019 through 8/18/2020 – BASE YEAR 8/19/2020 through 8/18/2021 - OPTION YEAR ONE 8/19/2021 through 8/18/2022 - OPTION YEAR TWO
Base Year CLINS:
CLIN 0001 – MONTHLY RENTAL CHARGES FOR FOURTEEN (14) HIGH PURITY NITROGEN CYLINDERS. OPEN SHED LOCATION.
$______________ PER MONTH x 12 MONTHS (MO) = $______________
CLIN 0002 – HIGH PURITY NITROGEN CYLINDER EXCHANGE, REPLACE EMPTY CYLINDERS WITH FULL CYLINDERS ON AN AS-NEEDED BASIS. OPEN SHED LOCATION.
$ PER EXCHANGE x 30 EXCHANGES (UN) (ESTIMATED, AS-NEEDED BASIS) = $____________
CLIN 0003 – GOVERNMENT-OWNED 255 CUBIC FOOT NITROGEN CYLINDERS. CYLINDER REFILL ON AN AS-NEEDED BASIS. CONTRACTOR SHALL REFILL CYLINDERS AT CONTRACTOR’S LOCATION AND RETURN SAME CYLINDERS BACK TO GOVERNMENT LOCATION WITHIN THREE
(3) DAYS FROM DATE OF PICKUP. The Government tests its own cylinders. If the Contractor discovers that an empty cylinder is "out of test date" then Contractor shall return empty cylinder to Government. BUILDING 3 LOCATION.
$___________ PER REFILL x 160 REFILLS (UN) (ESTIMATED, AS-NEEDED BASIS) =
$ __________________TOTAL PRICE
CLIN 0004 MONTHLY RENTAL CHARGES FOR ONE (1) ACETYLENE CYLINDER (150-300 SOURCE SELECTION INFORMATION SEE FAR 2.101 AND 3.104 CUBIC FOOT) CYLINDER. BUILDING 3 LOCATION.
$__________ PER MONTH x 12 MONTHS (MO) = $__________
CLIN 0005 – CYLINDER EXCHANGE, REPLACE EMPTY ACETYLENE CYLINDER WITH FULL CYLINDER ON AN AS-NEEDED BASIS. BUILDING 3 LOCATION.
$ __________PER EXCHANGE x 1 EXCHANGE (UN) (ESTIMATED, AS-NEEDED BASIS) =
CLIN 0006 – SHIPPING CHARGES. ESTIMATED BREAKDOWN AS FOLLOWS: FIVE (5) HIGH PURITYNITROGEN SHIPMENTS. EIGHT (8) REGULAR NITROGEN SHIPMENTS. ONE (1) ACETYLENE SHIPMENT.
$______________PER SHIPMENT x 14 SHIPMENTS (JB) (ESTIMATED, AS-NEEDED BASIS) =
CLIN 0007 – HAZMAT FEES. ESTIMATED BREAKDOWN AS FOLLOWS: FIVE (5) HIGH PURITY NITROGEN SHIPMENTS. EIGHT (8) REGULAR NITROGEN SHIPMENTS. ONE (1) ACETYLENE SHIPMENT.
$________________PER SHIPMENT x 14 SHIPMENTS (JB) (ESTIMATED, AS-NEEDED BASIS) = $ $_______________
TOTAL AMOUNT FOR CLINS 0001-0007: $ __________________
Option Year One CLINS:
CLIN 1001 – MONTHLY RENTAL CHARGES FOR FOURTEEN (14) HIGH PURITY NITROGEN CYLINDERS. OPEN SHED LOCATION.
$______________ PER MONTH x 12 MONTHS (MO) = $______________
CLIN 1002 – HIGH PURITY NITROGEN CYLINDER EXCHANGE, REPLACE EMPTY CYLINDERS WITH FULL CYLINDERS ON AN AS-NEEDED BASIS. OPEN SHED LOCATION.
CLIN 1003 – GOVERNMENT-OWNED 255 CUBIC FOOT NITROGEN CYLINDERS. CYLINDER REFILL ON AN AS-NEEDED BASIS. CONTRACTOR SHALL REFILL CYLINDERS AT CONTRACTOR’S LOCATION AND RETURN SAME CYLINDERS BACK TO GOVERNMENT LOCATION WITHIN THREE
(3) DAYS FROM DATE OF PICKUP. The Government tests its own cylinders. If the Contractor discovers that an empty cylinder is "out of test date" then Contractor shall return empty cylinder to Government. BUILDING 3 LOCATION.
$___________ PER REFILL x 160 REFILLS (UN) (ESTIMATED, AS-NEEDED BASIS) =
$ __________________TOTAL PRICE
CLIN 1004 MONTHLY RENTAL CHARGES FOR ONE (1) ACETYLENE CYLINDER (150-300 SOURCE SELECTION INFORMATION SEE FAR 2.101 AND 3.104 CUBIC FOOT) CYLINDER. BUILDING 3 LOCATION.
$__________ PER MONTH x 12 MONTHS (MO) = $__________
CLIN 1005 – CYLINDER EXCHANGE, REPLACE EMPTY ACETYLENE CYLINDER WITH FULL CYLINDER ON AN AS-NEEDED BASIS. BUILDING 3 LOCATION.
$ __________PER EXCHANGE x 1 EXCHANGE (UN) (ESTIMATED, AS-NEEDED BASIS) =
CLIN 1006 – SHIPPING CHARGES. ESTIMATED BREAKDOWN AS FOLLOWS: FIVE (5) HIGH PURITYNITROGEN SHIPMENTS. EIGHT (8) REGULAR NITROGEN SHIPMENTS. ONE (1) ACETYLENE SHIPMENT.
$______________PER SHIPMENT x 14 SHIPMENTS (JB) (ESTIMATED, AS-NEEDED BASIS) =
CLIN 1007 – HAZMAT FEES. ESTIMATED BREAKDOWN AS FOLLOWS: FIVE (5) HIGH PURITY NITROGEN SHIPMENTS. EIGHT (8) REGULAR NITROGEN SHIPMENTS. ONE (1) ACETYLENE SHIPMENT.
$________________PER SHIPMENT x 14 SHIPMENTS (JB) (ESTIMATED, AS-NEEDED BASIS) = $ $_______________
TOTAL AMOUNT FOR CLINS 1001-1007:
Option Year Two CLINS:
CLIN 2001 – MONTHLY RENTAL CHARGES FOR FOURTEEN (14) HIGH PURITY NITROGEN CYLINDERS. OPEN SHED LOCATION.
$______________ PER MONTH x 12 MONTHS (MO) = $______________
CLIN 2002 – HIGH PURITY NITROGEN CYLINDER EXCHANGE, REPLACE EMPTY CYLINDERS WITH FULL CYLINDERS ON AN AS-NEEDED BASIS. OPEN SHED LOCATION.
CLIN 2003 – GOVERNMENT-OWNED 255 CUBIC FOOT NITROGEN CYLINDERS. CYLINDER REFILL ON AN AS-NEEDED BASIS. CONTRACTOR SHALL REFILL CYLINDERS AT CONTRACTOR’S LOCATION AND RETURN SAME CYLINDERS BACK TO GOVERNMENT LOCATION WITHIN THREE
(3) DAYS FROM DATE OF PICKUP. The Government tests its own cylinders. If the Contractor discovers that an empty cylinder is "out of test date" then Contractor shall return empty cylinder to Government. BUILDING 3 LOCATION.
$___________ PER REFILL x 160 REFILLS (UN) (ESTIMATED, AS-NEEDED BASIS) =
$ __________________TOTAL PRICE
CLIN 2004 MONTHLY RENTAL CHARGES FOR ONE (1) ACETYLENE CYLINDER (150-300 SOURCE SELECTION INFORMATION SEE FAR 2.101 AND 3.104 CUBIC FOOT) CYLINDER. BUILDING 3 LOCATION.
$__________ PER MONTH x 12 MONTHS (MO) = $__________
CLIN 2005 – CYLINDER EXCHANGE, REPLACE EMPTY ACETYLENE CYLINDER WITH FULL CYLINDER ON AN AS-NEEDED BASIS. BUILDING 3 LOCATION.
$ __________PER EXCHANGE x 1 EXCHANGE (UN) (ESTIMATED, AS-NEEDED BASIS) =
CLIN 2006 – SHIPPING CHARGES. ESTIMATED BREAKDOWN AS FOLLOWS: FIVE (5) HIGH PURITYNITROGEN SHIPMENTS. EIGHT (8) REGULAR NITROGEN SHIPMENTS. ONE (1) ACETYLENE SHIPMENT.
$______________PER SHIPMENT x 14 SHIPMENTS (JB) (ESTIMATED, AS-NEEDED BASIS) =
CLIN 2007 – HAZMAT FEES. ESTIMATED BREAKDOWN AS FOLLOWS: FIVE (5) HIGH PURITY NITROGEN SHIPMENTS. EIGHT (8) REGULAR NITROGEN SHIPMENTS. ONE (1) ACETYLENE SHIPMENT.
$________________PER SHIPMENT x 14 SHIPMENTS (JB) (ESTIMATED, AS-NEEDED BASIS) = $ $_______________
TOTAL AMOUNT FOR CLINS 2001-2007: $_______________ __________________
NOTE:
The nitrogen cylinders that we use at our facility are DOT 3AA 2015 and we have one DOT 3AA 2265 cylinder. These particular cylinders were at one time medical oxygen cylinders and they were downgraded to Nitrogen cylinders. These Nitrogen Cylinders are used to hold the Nitrogen High Purity Grade: 99.995%.
1. The other nitrogen cylinders are DOT 3AA2400C are located in the open storage areas and they are used to hold the Zero Grade: 99.998%.
2. The Nitrogen gas supplier should be able to determine the psi for each cylinders based on the cylinder type, (DOT 3AA2015, DOT 3AA 2265, and DOT 3AA2400C) dimensions and pressure capacities for each high pressure steel cylinders.
3. High Purity Grade : 99.995% Cubic feet : 230
4. Zero Grade : 99.998% Cubic feet: 305
5. Purified Acetylene 99.6% Cubic feet: 300
Source Selection Information See 2.101 and 3.104 For Official Use Only