SOW Window Washing with Count and pics.pdf
PDF 339 KB Posted
- Attached to
- S299--Window Wash for VAPAHCS Federal contract opportunity
- Solicitation number
- 36C26122Q0445
About this file
This statement of work outlines requirements for window washing services at multiple buildings across three divisions of the Veterans Affairs Palo Alto Health Care System in California. The contractor will be responsible for removing and cleaning all windows and screens both inside and outside at over 50 buildings, with an estimated total of nearly 6,000 windows. Key tasks include removing dirt and other substances from windows and frames, safely reinstalling screens, and following all OSHA and COVID-19 guidelines. Work must be scheduled in advance and coordinated with facility points of contact, taking place on weekdays between 8am and 4:30pm excluding federal holidays. The contractor will be required to re-clean any areas not meeting standards at no additional cost.
A related sources sought notice seeks information from capable firms to provide these window washing services. Responses are due by May 4, 2022 and should include organizational details and confirmation of small business size in SAM. The NAICS code is 561790 with a size standard of $8 million. This is for information gathering purposes only and does not constitute a solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26122Q0445.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK – WINDOW WASHING
A. GENERAL:
Furnish all labor, supervision, materials, and equipment necessary to accomplish complete window washing services as described herein that identify the buildings and the estimated number of windows and screens that require cleaning. A site visit is recommended since some windows may require rappelling to be cleaned. The contractor will be required to replace any window units or fixtures damaged during accomplishment of contracted services. The individuals to be contracted at each division are:
Palo Alto Division: Stanford Anderson, ECS 650-621-0119 Menlo Park Division: Gary Mason, ECS 650 621-0119 Livermore Division: Alphonso Farquharson, ECS 650 444-7520
B. WORK HOURS:
1. Normal Work Hours: The service schedule will be developed between the contractor and
Contractor’s Technical Representative (COTR) prior to any service being performed.
Work should be performed in November and June.
2. National Holidays: The eleven holidays observed by the Federal Government are: New Years
Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day and Christmas Day and any other day specifically declared by the President of the United States to be a national holiday.
C. SPECIFICATIONS:
1. Removing and cleaning screens
2. Cleaning windows (inside and out)
3. Cleaning frames, sills, and sashes (inside and out)
4. Reinstall screens after cleaning – note some screens are screwed in and tools will be required to remove and replace them.
5. All cleaning tasks shall be accomplished to meet all standards as follows:
a) Remove all paint, dirt, soil and other substances that may be found on the windows.
Screens removed for cleaning must be replaced and securely fastened. Some screens may be attached by screws that will require tools to remove.
b) All damages caused by contractor’s personnel will be repaired to previously existing condition at contractor’s expense.
c) Contractor must follow OSHA guidelines, policies, procedures, and directives, as well as fire and safety regulations of the medical center.
d) Work of the contractor is to be coordinated to prevent conflicts with the treatment of patients and the functioning of the facility. No medical apparatus will be moved without approval.
e) The contract personnel must report to EMS prior to beginning work for each day and shall report back to EMS what they accomplished during the day before leaving the Medical Center grounds. For the Jefferson Barracks (JB) Division, report to Bldg. 6, Room A-238. For the John Cochran (JC) Division, report to Bldg. 6, Fourth Floor, Room A-238.
f) Contract personnel must wear identifying clothing, such as caps or shirts with contractor logo while on Medical Center grounds and follow Covid 19 GUIDELINES.
g) Contact project manager to submit to EMS, the plan for how areas/rooms are to be serviced each workday.
h) Contracting is required to re-clean where deficiencies have been noted at no additional expense to the Government. Re-cleaning is to be accomplished within five (5) working days of identification. Re-cleaning is required until the deficiency has been corrected.
Payment will be withheld unit all areas are cleaned to the satisfaction of the VA.
Work Inspected by EMS personnel.
i) All work is to be performed in accordance with the guidelines established by Federal, State and Local ordinances and with contractor’s procedures manual and quality control manual.
D. HOURS OF OPERATION: Normal business hours are 8:00 a.m. to 4:30 p.m., Monday through
Friday, excluding Federal Holidays. The eleven holidays observed by the Federal Government are:
New Year’s Day, Martin Luther King’s Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving, Christmas, and any other day specifically declared by the President of the United States to be a national holiday.
E. SCHEDULING: The contractor shall provide a written work schedule identifying when the work will be accomplished no later than the date identified in this solicitation for work to begin. For example:
A schedule identifying when work will be accomplished shall be furnished no later than July 30, 2015. All work must be scheduled through individuals identified in paragraph 2 of this section.
F. QUALITY ASSURANCE:
Performance Objective Performance Threshold
All screens and windows will be washed according to VA expectations.
Contractor will be required to re-clean windows and/or screens not meeting VA’s standards.
G. CONTRACTOR PERSONNEL BADGES AND PARKING:
1. The contractor shall provide the COTR with a list of contractor employees expected to enter the buildings. While on VA premises, all contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility.
2. An access badge will be given to the contractor’s employee upon entrance into VA buildings.
The contractor employee must safeguard the access badge and immediately report any lost, stolen, or destroyed badges to the COTR. All contract personnel must properly display their access badges.
Access badges must be worn at or above the waist (facing forward.). The contractor’s employees must return the access badge(s) to the COTR or designee at the end of each pick up process.
3. The contractor shall be required to comply with all security policies/requirements of (your facility). All security policies/requirements must be met, and employees cleared prior to the contractor performing work under this contract. Employees that cannot meet the security and clearance requirements shall not be allowed to perform work under this contract.
4. It is the responsibility of the contractor’s personnel to park in the appropriate designated parking areas. Parking information shall be coordinated with each facility COTR.
5. VAPAHCS does not validate or make reimbursement for parking violations of the contractor’s personnel under any circumstance.
K. INTERFERENCE TO NORMAL FUNCTION: Contractor may be required to interrupt their work at anytime so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment and carts.
1. In the event of an emergency, contractor services may be stopped and rescheduled at no additional cost to the government.
2. Contractor personnel shall inform the COTR or the designee of the need to gain access to secured areas. If access is required to secure areas, prearranged scheduling will be made with COTR or designee.
PAVAHCS, Palo Alto Division, Menlo Park Division and Livermore Division
Note: The below cited data is for information purposes only and is not intended to furnish the bidder an approximate number of windows and screens that require cleaning. The successful bidder will be required to clean all windows and screen on buildings identified regardless of the window/screen count.
Palo Alto Division
BUILDING AREA WINDOWS SCREENS
100 Inside/Outside All windows All screens screens/frames
101 Inside/Outside All windows All screens
520 Inside/Outside All windows All screens
7 Inside/Outside All windows All screens
6 Inside/Outside All windows All screens
5 Inside/Outside All windows All screens
4 Inside/Outside All windows All screens
500 Inside/Outside All windows All screens
MB-1 Inside/Outside All windows All screens
MB-2 Inside/Outside All windows All screens
MB-3 Inside/Outside All windows All screens
MB-4 Inside/Outside All windows All screens
50 Inside/Outside All windows All screens
710 Inside/Outside All windows All screens
Palo Alto Division Continued
T-50 Inside/Outside All windows All screens
9 Inside/Outside All windows All screens
8 Inside/Outside All windows All screens
102 Inside/Outside All windows All screens
54 Inside/Outside All windows All screens
105 Inside/Outside All windows All screens
T-6 Inside/Outside All windows All screens
T-6B Inside/Outside All windows All screens
T-7A Inside/Outside All windows All screens
T-7B Inside/Outside All windows All screens
T-7C Inside/Outside All windows All screens
T-7D Inside/Outside All windows All screens
51 Inside/Outside All windows All screens
530 Inside/Outside All windows All screens
Menlo Park Division
321 Inside/Outside All windows All screens
329 Inside/Outside All windows All screens
322 Inside/Outside All windows All screens
400 Inside/Outside All windows All screens screens/frames
331 Inside/Outside All windows All screens screens/frames
347 Inside/Outside All windows All screens screens/frames
360 Inside/Outside All windows All screens screens/frames
349 Inside/Outside All windows All screens screens/frames
350 Inside/Outside All windows All screens screens/frames
351 Inside/Outside All windows All screens screens/frames
352 Inside/Outside All windows All screens screens/frames
370 Inside/Outside All windows All screens screens/frames
334 Inside/Outside All windows All screens screens/frames
371 Inside/Outside All windows All screens screens/frames
T-365 Inside/Outside All windows All screens
Livermore Division
62 Inside/Outside All windows All screens
64 Inside/Outside All windows All screens
88 Inside/Outside All windows All screens
90 Inside/Outside All windows All screens screens/frames
T-34 Inside/Outside All windows All screens screens/frames
30 Inside/Outside All windows All screens screens/frames
65 Inside/Outside All windows All screens screens/frames
6 Inside/Outside All windows All screens screens/frames
T-10 Inside/Outside All windows All screens screens/frames
T-12 Inside/Outside All windows All screens screens/frames
T-16 Inside/Outside All windows All screens screens/frames
63 Inside/Outside All windows All screens screens/frames
74 Inside/Outside All windows All screens
Window count
Palo Alto Bldg.# #Windows Menlo Park Bldg.# #Windows Livermore Bldg.# #Windows
710 517 321 162 62 320
500 480 329 23 64 95
100 773 322 14 88 73
101 94 400 29 90 60
102 61 331 157 T-34 13
105 216 347 206 30 20
520 61 360 158 65 18
530 382 349 78 6 4
4 252 350 83 T-10 T-12 T-16 63 74 37
5 356 351 83
7 280 352 83
MB1 - MB4 146 370 34
T6 11 334 32
T7C 7 371 13
T7D 15 T-365 78
9 174
6 286
54 6
Total Count for each site 4117 1233 640
Total for all sites 5990
Average size of window is 5ft by 6ft
Window examples:
Building 100 Palo Alto
Bldg. 710 and Bldg. 5 Palo Alto