SOW Water System Treatment SVC.pdf
PDF 253 KB Posted
- Attached to
- WATER SYSTEMS TREATMENT SERVICES Federal contract opportunity
- Solicitation number
- 36C261-20-Q-1164
About this file
This solicitation seeks proposals for water systems treatment services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 is soliciting quotes from SDVOSB companies to provide complete water treatment, sampling, and testing programs for steam, chilled water, heating water, and solar heating loops at VA Southern Nevada Healthcare System facilities. Services are required for equipment in Buildings 1, 2, 5, and 6 located at 6900 North Pecos Road in North Las Vegas, Nevada. The base period of performance is 12 months with four optional 12-month extensions. Quotes are due by September 30, 2020. Award will be made based on a comparative evaluation of technical capability and price. The successful offeror must comply with limitations on subcontracting and report executive compensation in accordance with FAR provisions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ 36C261-20-Q-1164.pdf | ||
| SCA WAGE DETERMINATION 2015-5593.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
ENGINEERING WATER SYSTEMS TREATMENT SERVICES
I. DESCRIPTION OF SERVICES/GENERAL INFO
1.0. SCOPE
VA Southern Nevada Healthcare System (VASNHS) is contracting water treatment services that provide a complete service-oriented water treatment, sampling and test program that supplies steam, chilled water service, and heating water service loops which include a solar heating loop. Access to these systems is located in Buildings 1, 2, 5, & 6. The contractor shall supply a complete service-oriented water treatment program. A major component of maintaining equipment involves chemical treatment, real time monitoring, and water sampling. The contractor shall provide trained, qualified and certified personnel to perform required tasks. In addition, contractor shall provide all the necessary equipment, tools, materials, supervision, repair, replacement, and other services necessary to perform water treatment services at
VASNHS facilities as defined in this Statement of Work (SOW) for Government-owned equipment.
Services shall be provided at the VASNHS medical center, located at 6900 North Pecos Road, North Las
Vegas, NV 89086. The contractor shall perform in accordance with all federal, state, and local regulations.
1.1.2 The water treatment program shall service steam boilers, chillers, chilled water system, open condenser water loops, 9 closed hot water heating loops, a refrigeration condenser loop, and a Glycol energy recovery loop, along with all associated piping for the equipment listed below. This list is not all inclusive of the Government owned equipment that may require monitoring, testing, or other services associated with the overall treatment program. Contractor is to supply all equipment and services for real time monitoring of HVAC Cooling Tower open loop.
Chilled Water:
Global GTCHB2234F2615PC Side-stream Filter with MS30ES20 filter cartridges.
Cooling Tower (Condenser Water):
In-Line, Real-Time monitoring system controlling 3 LMI metering pumps and condenser water bleed valve.
Puroflux PF64-060(B) centrifugal separator
Glycol:
Neptune 141-GFS251A.88
Steam/Condensate:
The steam system has three LMI chemical metering pumps for the Boiler treatment, sulfite, and amine .
Feed rates are set manually based on feed water / condensate testing by the operator.
Each boiler is equipped with a pot feeder for start-up/emergency treatment. The other systems are manually dosed with pot feeders.
1.2 FREQUENCY OF SERVICE & TEST REQUIREMENTS
1.2.1. The following charts denote the frequency of service and testing requirements.
1.2.1.1 Specific System: Cooling Tower System, Open Loop, Building 2.
Control
Parameters
Analytical
Method
Target
Range
Service Report Test
Frequency pH, Makeup Water PH meter Record Weekly pH, System Water PH Meter 8.0-9.0 Weekly
Conductivity, Makeup Conductivity Meter Record Weekly
Conductivity, System Water
Conductivity Meter ≤ 2400 ppm TDS Weekly
Corrosion Inhibitor Colorimetry 15 – 30 ppm Weekly
Calcium, Makeup
Water
DR890-PRG29 Record Weekly
Calcium, System Water DR890-PRG29 <100 ppm Weekly
Steel Corrosion
Inhibitor (Active
Polymer)
DR890 – PRG181 6-8ppm Weekly
Iron DR890-PRG33 <1.0 ppm Weekly
Free Halogen
(Chlorine)
Biocide
DR890-PRG 90 0.05-0.5 ppm Weekly
Bacteria:
Total Heterotrophic
Dip-slides 10^3-10^4 cfu/ml Weekly
Bacteria:
Sulphate Reducing
Analytical Lab Sample ND Semi-Annual
Bacteria:
Iron Related
Analytical Lab Sample
ND
Semi-Annual
Steel Corrosion
Inhibitor (Specify)
Coupons <1.0 mpy Semi-Annual
Copper Corrosion
Inhibitor (Specify)
Coupons <0.5 mpy Semi-Annual
ND = non detect
Note: Include tests for control parameters, from Program Calculation Sheet, Appendix A
1.2.1.2 Specific System: Chilled Water (Closed), Refrigerant Condenser Loop, Glycol Energy Recovery
System, and Hot Closed Systems, Buildings 1, 2, 5, 6 . See Appendix D & E
Control
Parameters
Analytical
Method
Target
Range
Service Report Test
Frequency
Corrosion Inhibitor
(Nitrite)
Titration 600-800 ppm Weekly pH
PH Meter <10.5 Weekly
Monthly for hot
Conductivity Conductivity Meter Record Weekly
Monthly for hot
Steel Corrosion
(Specify)
Coupons <1.0 mpy Quarterly
Copper Corrosion
(Specify)
Coupons <1.0 mpy Quarterly
Iron
(Total)
DR890-PRG33 <2.0 ppm Weekly
Monthly for hot
Copper
(Total)
DR890-PRG22 <2.0 ppm Weekly
Monthly for hot
Bacteria:
Total Heterotrophic
Dip-slide <10^3 cfu/ml Monthly
Bacteria:
Sulfate Reducing
Analytical Lab Sample ND Semi-annual
Bacteria:
Iron Related
Analytical Lab Sample ND Semi-annual
Bacteria: Nitrifying Analytical Lab Sample Minimal Semi-annual
Bacteria: Denitrifying Analytical Lab Sample Minimal Semi-annual
1.2.1.3 Specific System: Steam Boiler System, Building 2.
Control
Parameters
Analytical
Method
Target
Range
Service Report Test
Frequency
Makeup Water pH PH meter Record Weekly
Makeup Water
Conductivity
Conductivity Meter Record Weekly
Makeup Water -
Hardness
Drop Test Record Weekly
Makeup Water Total
Alkalinity
DR890-PRG29 Record Weekly
Feedwater – Hardness Drop Test 0-2 ppm Weekly
Feedwater – Iron
DR890-PRG33 <1.0 ppm Weekly
Feedwater – pH
PH meter 8.3-10.5 Weekly
Feedwater –
Conductivity
Conductivity Meter ≤ 300 µmhos Weekly
Feedwater – P
Alkalinity
Titration Record Weekly
Feedwater – M
Alkalinity
Titration Record Weekly
Feedwater –Boiler
Treatment
DR890-PRG181 20-25ppm Weekly
Boiler – P Alkalinity Titration <300 Weekly
Boiler – M Alkalinity Titration <100 Weekly
Boiler – Oxygen scavenger Residual
Sulfite low level test kit 30-60 ppm Weekly
Boiler – Conductivity On-Line Conductivity
Meter
<4500 µmhos Weekly
Boiler –Neutralized
Conductivity
DR890-PRG29
Boiler – iron DR890-PRG33 <1.0 ppm Weekly
Condensate -
Conductivity
Conductivity Meter <100 µmhos Weekly
Condensate – pH PH meter 8.0-10.0 Weekly
Condensate – Hardness Drop Test 0-1 ppm Weekly
Condensate – Iron DR890-PRG33 <1.0 ppm Weekly
1.2.1.4 Industrial Water Systems
System Location Analytical
Test Method
Service Report Test
Frequency
Water Tank #1 Water Tank Yard A, B, C, E, F Monthly
Water Tank #3 Water Tank Yard A, B, C, E, F Monthly
Water Tank #4 Water Tank Yard A, B, C, E, F Monthly
Cooling Towers BLD 2 A, B, C, D,E, F Weekly
Industrial Water
System Bldg 2, Rm 2-110 A, B, C, D, E Monthly
1.2.1.5 Industrial Water System Analytical Test Method:
A. Chlorine residual, Free/Total; DPD Colorimeter USEPA (Hach Field Test)
B. Conductivity / TDS; Ultrameter II Conductivity Meter
C. PH; Ultrameter II PH Meter.
D. Hardness; Drop Test, Titration
E. Water Temperature, Ultrameter II, or Contact Thermometer.
F. Dip-slide, Heterotrophic Bacteria, & Mold Indicating
1.2.2. METHOD OF TREATMENT
1.2.2.1. The contractor shall provide water treatment products to prevent scale, corrosion, fouling and microbiological fouling within all heating, chilled, and cooling water systems.
1.2.2.2. Water treatments shall be performed as indicated by testing on each system in all buildings.
1.2.2.3 Sodium Nitrite, or other corrosion inhibitor, applied to closed loops shall always include Leak
Detection Dye.
1.2.2.4. Evaluate the flows, pressure and Total Dissolved Solids (TDS), weekly.
1.2.2.5. Cooling towers shall be treated by acid or soft water blend control. See Appendix B for system.
1.2.2.6 Delivery of all water treatment chemicals to points-of use shall be placed on spill containment pallets. It is the contractor’s responsibility to ensure all safety precautions for chemicals have been taken.
1.2.2.7 Chemical Tanks - The tanks MUST provide the following features:
Tank level indicators to determine chemical levels.
Flooded suction inlets for chemical pumps to ensure pumps do not loose prime, or provide self-priming pumps.
Containment basins capable of 150% of the tank storage capacity.
Tank sizing shall be appropriate for chemical use; chemical shall be a minimum quantity of 31 days without replenishment.
Chemical labels clearly visible on outside of tank.
SDS sheets attached to tank container.
Tank to tank chemical transfer preferred, when pumping from drums, empty drums shall be removed from VAMC property within 3 working days.
Full spill containment.
1.2.2.7.1 Liquid chemicals shall be stored on site in Mini Porta Feed or equal containers. Containers shall be stainless steel or double walled polyethylene tanks as appropriate. Containers shall be supplied and maintained by the water treatment contractor.
1.2.2.7.2 All chemicals shall be directly injected in to their respective loops via corporation stop injectors whenever provided. Pot feeders are available at the boilers (start-up), and all closed loops.
1.2.3. TESTS
1.2.3.1. Routine Testing. The routine Cooling Tower testing to be performed according to the chart in
1.2.1.1, Closed Loops according to 1.2.1.2 and Boiler testing performed according to chart in 1.2.1.3.
which will provide results showing:. Total Hardness, P Alkalinity, M Alkalinity, OH Alkalinity, Total
Alkalinity, pH, Conductivity/TDS, Silica, Phosphates/orthophosphates, Nitrite, Calcium Hardness, Free
Chlorine, Sulfite, Iron and Copper. Routine testing by the Contractor shall also provide services as listed in Appendix B and C. The contractor shall submit documentation of results and recommendations accurately and within required timeframe in accordance with Paragraph 1.2.10.1.
1.2.3.2. Weekly water tests and treatment for each operating system in building 2 shall provide:
Boilers and Steam:
Orthophosphate (PO4) (Operating Boiler’s water)
Sodium Sulfite (SO3) (Operating Boilers)
P-Alkalinity (Operating Boiler’s water)
Conductivity (µmhos/cm) (Operating Boiler’s water and Feed Water)
Total Hardness, pH, iron, and conductivity (Feed Water, Condensate, High Pressure Drain, Condensate from Bldg 1.
Add neutralizing amine blend to treatment tank, for injection into steam header outlet piping.
Determine gallons/day feed rate for sodium polymethacrylate* and add to proper tank with proper adjustments to feed rate. (*or recommended chemical.)
Add sodium sulfite in chemical feed tank for feedwater treatment.
Add sodium hexametaphosphate*, caustic flake*, and adjustments for feed rates to boiler chemical feed tanks. ( *or recommended chemical).
Sodium Nitrite added to (Hot & Chilled) closed loops to provide protection of metal piping and maintain residual.
Cooling Tower / Open Condenser Loop:
Organophosphonate
Oxidizing and Non-Oxidizing Biocides
1.2.4. STANDARDS. The contractor shall inspect, monitor and document the cooling water characteristics for a stable condition. Conductivity Total Dissolved Solids (TDS) range shall be maintained within 2000 to 2500 µmhos/cm. The contractor shall conduct weekly total bacteria count tests on cooling tower water samples utilizing a dip-slide culture test. ORP measurements will be taken on condenser water to verify relationship between Biocide effective ness and corrosion of tower metal, maintain range of 250 to 450 mV. The contractor shall use test results to change or optimize the biocide feed rates and the timing of the biocide feed applications to maintain bacteria counts at 10,000 CFU/mL or less. The bacteria count, determined by dip-slide culture, shall be reported weekly on the service trip report and provided accordingly to 1.2.10.1.
1.2.4.1. The following standards apply to each operating system in building 2 and shall be on contractor’s report. The contractor shall maintain systems within the standards listed in paragraph 1.2.4:
Boilers
Phosphate (PO4) = 15 – 25 PPM
P-Alkalinity (CaCO3) = 300 – 600 PPM
Sulfite (SO3) = 30 – 60 PPM
Neutralized Conductivity (µmhos/cm): 3000-3500
Boiler PH = 10.5 – 12.0 PPM
Condensate:
PH = 8.3 – 9.2 SU
Conductivity= < 100 µmhos
Sodium Softeners: (Hardness Maximum) 1 PPM or 7.1 grains
Low Temperature Hot Water Heat (HWH) – the following standards apply:
Nitrite = 1000-1500 ppm in nitrite. Test and record pH, conductivity, iron, copper.
Chilled Water – the following standards apply:
Nitrite = 600-800 ppm as nitrite. Test and record pH, conductivity, iron, copper.
Contractor shall clean and replace Side-Stream filters as necessary.
Open Condenser Loop (Cooling Towers) – the following standards apply:
Conductivity= 3200 µmhos / TDS= ≤ 2400 ppm
Organophosphonate = 15 – 30 ppm, PTSA trace = 160 – 170
Biocide = .05 – 0.5 ppm
1.2.5. MONITORING. The contractor shall inspect, monitor and document each system listed in
Appendix B, C, D, & E. to measure effectiveness of the treatment program. The contractor shall inspect, monitor and document the below mentioned conditions. Results shall be documented IAW Section 1.2.10 and provided to COR.
Scale formation onto waterside surfaces
Corrosion of waterside metal surfaces
Slime producing bacteria within the bulk water (dip-slide test)
Make-up water rate
Bleed-off/Blowdown rate
Chemical treatment feed rates
1.2.6. INSPECTIONS
1.2.6.1. The contractor shall perform weekly inspections of the cooling tower, boilers and heat exchange systems to include: chemical feed equipment, chemical feed point locations, and sampling locations. This shall include weekly inspections of the side-stream filter installed in the condenser water system .
Adjustments shall be made to backwash timing and frequency. Results and recommendations shall be documented IAW Section 1.2.10.1 and provided to COR.
1.2.6.2. The contractor shall conduct internal and external inspections of steam generation equipment during seasonal shutdowns and perform external inspections when the steam generation equipment is on-line.
1.2.6.3. The contractor shall inspect and document all waterside surfaces of opened heat exchangers and chillers for proper water treatment according to the type of system, its size and location . Inspection results shall include: the tube sheet, end bells, water box, and the end of the tubes.
1.2.7. REVIEWS AND ANALYSIS.
1.2.7.1. The contractor shall conduct a review and analysis of cooling and heating system operating logs and cooling tower including side-stream filters, heat exchangers, and closed system water treatment testing logs. The Contractor shall maintain an electronic data-site of all information. Trend analysis data generated using software shall be included in the Quarterly Report IAW 1.2.10. The contractor shall identify, document correctly, and submit to the COR, quarterly, any potential problem areas and assess trends of chemical consumption, costs, and residuals.
1.2.7.2. The contractor shall document results and recommendations for purposes of long-range planning.
Documentation shall be IAW Section 1.2.10.3 and provided to COR.
1.2.7.3. The contractor shall provide actual values of: Bleed-off/Blowdown, Make-up, Drift, Cycles of concentration, and Chemical Feed Rates. The contractor shall document and compare values to theoretical values, and industry standards. The Contractor shall make recommendations to the government to optimize operations. All final decisions are by the government. Documentation shall be IAW Section
1.2.10.3.
1.2.7.4. The contractor shall document the collection of and analyze scale and other deposits found in the system. Results and recommendations shall be IAW Section 1.2.10.3 and provided to COR.
1.2.7.5. Condensate Quality Profile. A Quality Profile shall be created and documented for each condensate stream. Information and targeted performance guidelines shall include:
pH (properly cooled) 8.0 – 9.0
Iron <0.10 ppm
Conductivity < 50 µmhos/cm
This data shall be reported quarterly IAW Section 1.2.10.2, report shall include all corrective action taken and provided to COR.
1.2.8. STUDIES. The contractor shall perform and document the following studies:
1.2.8.1. Corrosion Studies. Documented Corrosion studies shall include maintain continuous exposure periods for 90 days, conduct coupon analysis, review results and changes in the water treatment program to maintain acceptable Cooling Technology Institute (CTI) standards for Mild Steel Corrosion Rate
(<5.00 mpy) and Copper Corrosion Rate (<.50 mpy). Boiler and heat exchange systems shall be maintained IAW American Society of Mechanical Engineers (ASME) standards.
1.2.8.2. Annual Flow Rate and Elusion Studies. The contractor shall provide flow rate and elusion studies on ion exchange equipment to evaluate: Operation, Mechanical Status and Efficiency.
1.2.9. BOILER FEEDWATER (BFW)
1.2.9.1. The contractor shall evaluate the overall Boiler Feed water (BFW) program for compliance with
American Society of Mechanical Engineers (ASME) and Cooling Technology Institute (CTI) control parameters and operational procedures, Federal and State of Nevada Environmental Protection Agency regulations and environmental compliance issues. The contractor shall inform the government orally and in writing quarterly and annually of all compliance problems associated with the operation of the industrial water treatment program.
1.2.9.2. Evaluate and report, the boiler feed water characteristics to establish siteline data within the first month of contract.
1.2.9.3. Maximum cycles of concentration (no cycles to exceed 30) sited on the following ASME
Guidelines: The contractor shall calibrate Government chemical feed and control equipment to maintain water chemistry within industry specifications. Calibration of all monitoring equipment shall be performed accurately and at specified frequency. The calibration results shall be documented and available to COR as requested.
1.2.10. REPORTS AND OTHER DOCUMENTS. The contractor shall send a copy of reports to the
Contracting Officer Representative (COR). All urgent problems regarding maintenance of water treatment parameters shall be discussed with the COR on the day of discovery referenced in 1.3.5.2. All reports shall be submitted electronically to the Facility COR.
1.2.10.1. Weekly reports. The contractor shall prepare a written report each week. This report shall describe the results of routine tests (Section 1.2.3.1), the results of system inspections (Section 1.2.6). The reports shall contain recommendations and written proposed corrective actions. The contractor shall review the report with the COR/CO within seven (7) calendar days of data collection.
1.2.10.2. Quarterly reports. The contractor shall prepare a quarterly written report, accurately and on time, due by the 15th of Jan, Apr, Jul, and Oct. This report shall describe conditions of each water system.
The reports shall include those items discussed in Section 1.2.5 and the effectiveness of the treatment program and any areas of concern/problems incurred with recommendations for correction. The report shall include all chemical usage (Volume) by the contractor. The contractor shall conduct meeting with the COR and go over the Quarterly report.
1.2.10.3. Annual Reports. An annual report shall be compiled and submitted by the last day of the 11th month of each contract year, for each industrial water system. Each report shall describe sampled trends throughout the year, start and end conditions, and those items identified in Sections 1.2.7 through 1.2.9.
The report shall include total yearly chemical usage by the contractor. The contractor shall meet with the
COR and affected Contracting Officer and go over the Annual report.
1.2.11. Reserved
1.3. QUALITY CONTROL. The contractor shall establish and maintain a complete Quality Control
Plan (QCP) to ensure the requirements of this contract are met. Contractor shall develop and implement procedures to identify, prevent and ensure non-concurrence of defective services. A QCP shall be provided to the Contracting Officer within 30 days after contract award and as changes occur, a copy shall be provided to the COR. The quality control plan is subject to revisions, by the Contracting Officer, and shall be accomplished (at no cost to the government) to ensure quality service. Contractor compliance with the QCP will be monitored by the government. Records of quality control shall be made available, at any time to the government.
1.3.1. QUALITY ASSURANCE
1.3.1.1. Performance Evaluation Meetings. The contractor shall conduct quarterly meetings with the government to discuss long range plans, technical recommendations and the effectiveness of the water treatment programs. The contractor shall coordinate with the COR to organize and schedule meetings, during normal duty hours Monday through Friday (0730 -1600).
1.3.2. VEHICLES. Contractor shall transport personnel and materials from issue points to points-of-use.
1.3.3. MATERIAL
1.3.3.1. Compatibility: The contractor shall only use chemicals that have no detrimental effect on the equipment. Chemicals shall be used in accordance with manufacturer's instructions.
1.3.3.2. Contractor shall maintain a current listing of quantities of each chemical stored. Current inventory listing for each storage location shall be prominently displayed at each site.
1.3.3.3 All containers used to hold, mix, or transfer treatment chemicals shall be appropriately labeled using standard hazard placards or stickers and shall be labeled to identify contents as referenced by the
SDS.
1.3.4. Reserved
1.3.5. Contractor Employees
1.3.5.1. The contractor shall provide a primary and alternate person to represent the contractor for implementation and application of various boilers, cooling tower and chilled water treatment programs on
Site. The contract employee shall be formally trained or certified, to the extent to have a functional understanding of all aspects of water testing and treatment, be thoroughly familiar with testing, and treatment chemicals, test apparatus, and treatment equipment necessary to prevent scale and corrosion in the systems and equipment of the Energy Plant, and Medical Center. The contractor shall provide a primary person to provide technical advice in regard to the circumstances at hand. A designated alternate(s) shall act for the contractor when the Primary is unavailable. The designation of the Primary and alternate person shall be submitted in writing to the Contracting Officer (CO) prior to contract performance. The contractor shall provide telephone numbers for the primary and alternate for after normal duty hours.
1.3.5.2. The contractor shall respond to emergency service calls (during normal duty hours which are
0730 – 1600 HRS, Monday through Friday) within two (2) hours from the time of oral notification of a problem. After normal duty hours (1601 – 0729) and Saturday and Sunday, the contractor personnel shall meet within four (4) hours from the time of notification, to meet with the government.
1.3.5.3. The contractor shall furnish an identifying badge, which shall include as a minimum, the employee's name and the contractor name. Each employee shall wear the badge on the outer clothing and the badge shall be visible at all times.
1.3.5.4 The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest.
1.3.5.5. The contractor shall be able to perform inspections through an elliptical opening of 11x15 inches.
1.3.6. WORK HOURS
1.3.6.1. Normal Hours. The contractor shall perform the services required under this contract during the following hours: 0730-1600 HRS, Monday through Friday. The contractor may work, with prior approval of the Contracting Officer's representative, extended hours to ensure timely completion of work at no additional cost to the government.
1.3.6.2. Emergency Services. The contractor shall provide services to support emergency situations for the water treatment facilities 24/7. Contract service technician must be able to report to the Facility within
2 hours after request for emergency service.
1.3.6.3. Seasons. The heating season (Winter) is from 1 October to 31 May and the cooling season
(Summer) is from 1 June to 30 September. The actual dates are sited on temperature. If changes in dates occur, the government will notify the contractor.
1.3.7. RECOGNIZED HOLIDAYS
Except for emergencies, the contractor is not required to provide service on the following government-observed holidays:
New Year’s Day January 1st
Martin Luther King’s Birthday 3rd Monday in January
President’s Day 3rd Monday in February
Memorial Day Last Monday in May
Independence Day July 4th
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veteran’s Day November 11th
Thanksgiving Day 4th Thursday in November
Christmas Day December 25th
1.3.7.1. When a holiday falls on a Saturday, the preceding Friday shall be considered a holiday. When a holiday falls on a Sunday, the following Monday shall be observed. If a task, falls on one of the above listed holidays, the contractor shall perform said task on the next workday immediately following the holiday.
1.3.8. SITE CLOSURE
1.3.8.1. In the event the government determines it necessary to close the site due to adverse weather, a site or local disaster, security problems or other events, the contractor shall not receive any form of notification. The contractor shall notify all employees.
1.3.9. CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES DURING CRISIS.
1.3.9.1. All services to be performed under the contract have been determined to be non-essential for performance during crisis. Contractor shall support an activation, exercise of contingency plans outside the normal duty hours, or crisis. The site could be closed because of security problems or other events.
Should one of these situations occur, The Contracting Office would determine which services are required during the crisis.
1.3.10. FIRE PREVENTION
1.3.10.1. The contractor shall comply with all requirements of the National Fire Codes.
1.3.10.2. The contractor shall not weld or use any flame apparatus without obtaining clearance from the
VA. The contractor shall notify the VA 24 hours in advance of the intended use of any flame apparatus.
The contractor shall, when using flame apparatus, provide fire protection devices, such as non-combustible coverings and fire extinguishers and take other precautions, as directed by the VA.
1.3.11. DAILY CLEAN UP
1.3.11.1. The contractor shall keep the storage and work areas clean of all debris on a daily basis or more often as required. All empty containers and drums shall be removed from the points-of-use or IP by the contractor. All spill containers shall be kept clean.
1.3.12. ENVIRONMENTAL PROTECTION
1.3.12.1. Contractor is responsible to follow requirements in Section 01 02 20 (General Environmental
Protection Requirements).
1.3.12.1.1. The following Submittals from Section 01 02 20 are required:
1.3.12.1.2. Item A. Written identification of contractor’s environmental coordinator and alternate, and phone numbers. See part 3.01, Contractors Environmental Coordinator, paragraph B. This is required within 5 days of the award of contract.
1.3.12.1.3. Item I. Site Specific Spill Plan. See part 3.08, Spill Prevention, Control, and Reporting, paragraph A. This is required within 5 days of the award of contract and to be reviewed annually.
1.3.12.1.4. Item K. A current Resource Conservation and Recovery Act (RCRA) training certificate for employees handling hazardous waste on site. See part 3.10, Hazardous Waste Management paragraph B.
1.3.12.1.5. If at any time the scope of work changes, the contractor must follow the requirements under the required submittal that is applicable.
1.3.13. SECURITY
1.3.13.1. Emergency phone number is 911.
1.3.13.2. VA Police Dispatch phone number is 702-791-9000 Ext 13333
1.3.13.3. Energy Plant outside line is 702-643-0907
II. SERVICES SUMMARY.
2.1. Performance Requirements Summary
2.1.2 Summary Table:
Performance
Indicator
Performance
Standard
Performance
Threshold
Method – Type of
Surveillance
Reference
Cooling Tower
Treatment
Maintain Treatment levels
Maintain levels in accordance with parameters in Table
1.2.1.1 to a 90% accomplishment
Weekly testing 1.2.4
Chilled Water
System
Treatment
Maintain Treatment levels
Maintain levels in accordance with parameters in Table
1.2.1.2 to a 90% accomplishment
Weekly testing 1.2.4.1
Closed Loop
Treatment
Maintain Treatment levels, perform coupon checks
Maintain levels in accordance with parameters in Table
1.2.1.2 to a 90% accomplishment
Monthly testing.
Quarterly coupon change-out, submitted for analysis
1.2.4.1
Boiler Water
Treatment
Maintain Treatment levels, Recommend changes to chemical pumps and blowdown settings
Maintain levels in accordance with parameters in Table
1.2.1.3 to a 90% accomplishment
Weekly testing 1.2.4.1
Records and
Report
Management
Reports filled out timely and delivered to Utility Supervisor or COR
Weekly – within 7 days of collection.
Monthly – Within 7 days of collection.
Quarterly – on time.
Annually – Before end of contract. To a 100% accomplishment
Meetings with
COR, one on one.
1.2.10
Inspections Inspect Cooling
Towers, Boilers, and
Heat Exchangers during maintenance periods
Check for indications of corrosion, under-treatment, over-treatment. Make recommendations that show results.
COR to attend inspections
1.2.6
Inventory
Management
Sufficient testing and treatment materials on site to ensure plant condition not affected
All treatment levels in all systems maintained to a 90% accomplishment.
Daily checks by
COR, contractor notified by email of low levels or missing items
1.0
Appendix B
*The procedures set forth in the Inspection of Services Clause will be used to remedy all deficiencies.
The re-performance times will be sited upon sensitivity of the issue.
III. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
3.1. GENERAL.
3.1.1 The government will provide, without cost, the facilities, equipment, materials, and/or services listed below.
3.1.2. PROPERTY.
3.1.2.1. Storage Facilities. The government will provide storage for equipment and materials not to exceed a thirty (30) day supply. The government will not be responsible for the protection or loss of any equipment and materials. The contractor shall obtain approval from before storing equipment or chemicals.
3.2. UTILITIES.
3.2.1. Contractor must provide written request prior to use of government utilities for those outside of the normal use. This written request must be approved by the COR before the contractor uses any
Government utilities.
3.3. PHYSICAL SECURITY. The contractor shall safeguard all government property provided for contractor's use. At the end of each work period, all government facilities, equipment and materials shall be secured. The contractor shall conform to all local regulations, for safeguarding the government furnished facility and material contained therein.
3.3.1. Key Control. The contractor shall establish and implement accountability methods of ensuring all keys issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued to them by the government.
3.3.2. The contractor shall report, the same day, upon loss to the COR occurrences of a lost or duplicated key to the office that issued the key.
3.3.3. Lost Keys. In the event keys, other than master keys, are lost or duplicated, the contractor shall contact, the same day, C.O., regarding rekey or replace the affected lock or locks without cost to the government. The government has the option to replace the affected lock or locks or perform rekeying and deduct the cost of such from the monthly payment due the contractor.
3.3.4. The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor's employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in work in those areas.
3.4 PROTECTION OF GOVERNMENT PROPERTY AND PERSONNEL
3.4.1. The contractor shall accomplish the work in accordance with the provisions of Federal, State, American Standard Safety Code for Building Construction, American Standard Association, applicable parts of, Site Safety and Fire Prevention regulations and instructions. The COR shall assist in matters of safety to ensure compliance with all contract safety requirements.
3.4.2. Damages of any nature caused by contractor shall be repaired or replaced by the contractor at no expense to the Government. If the contractor does not satisfactorily repair or replace the damaged property, the Government reserves the right to make the necessary corrections. The contractor shall reimburse the Government for consequential damages and for all materials and labor expended for the corrections.
3.4.3. The contractor shall furnish, and place, barricades to maintain traffic. All access drives and doors shall be clear at all times.
Appendix A
TECHNICAL DEFINITIONS.
Tests. Regular on-site system sampling conducted during each service visit.
Surveys. A detailed inspection or review.
Scale. A hard coating or layer of chemical materials on internal surfaces of cooling tower systems or boiler pressure parts.
Metallurgical Analysis. Testing that determines the cause of metal deterioration in cooling tower systems or boiler pressure parts.
ORP Oxidation Reduction Potential, measurement of the tendency of a chemical substance to oxidize or reduce another chemical substance. Has a relationship to Biocide reactions.
Welch-Allyn fiber optic inspection. A high-level inspection system that examines tube bundles in great detail to determine if gross deficiencies in water treatment exist.
High Temperature Hot Water (HTHW). Heating system water that is generally circulated at temperatures from 320 to 440 degrees.
Condensate. Condensed water resulting from the removal latent heat from steam.
Deaerator Oxygen Analysis. A study to determine the oxygen removal efficiency of the deaerator. The collected data assists in predicting the potential for oxygen related problems in the feedwater and boiler system(s).
Embrittlement Analysis. A study of the embrittling characteristics of the boiler water.
Controlled Limits. Operating parameters (boundaries)
Elution Studies on Ion Exchange Equipment. A series of tests conducted on the softeners, dealkalizers or demineralizers to determine the efficiency of the regeneration cycle. The collected data is evaluated by drawing an elution curve. The information reveals the regenerate concentrations at all stages of the cycle.
Steam Purity Analysis. A study monitoring the quality of the steam being produced to determine the steam purity.
Corrosion Studies on Feedwater/Condensate Systems. A study to determine the corrosion rates of the pre-boiler systems. The collected data provides information relating to the corrosion protection provided by the chemical treatment program.
Quantitative Deposit Analysis. A study to determine the composition of a deposit.
Resin Analysis. A study generally performed to determine the efficiency of zeolite resin in water.
Appendix B
Cooling tower tonnage, Building 2
Building
Number
Capacity in
Approx Tons
Sidestream
Filters Tower Treatment Operation
2 6,500 N/A Acid or Softwater
Blend
Year Round
HVAC MAIN COOLING TOWER OPEN LOOP
The water treatment program shall include all cooling tower systems and all water pre-treatment equipment. The water treatment program shall include all chemical products, equipment, tools, supervision, professional consulting services, and any additional items necessary to perform the services as specified in the SOW.
The cooling towers consist of five cells.
The water treatment program shall provide control and remote monitoring capability for the following:
Controller capable of the following features:
Monitor system conductivity
Monitor system pH
Monitor system ORP, Oxidation Reduction Potential
Flow switch
Chemical levels in chemical feed tanks/containers
Monitor makeup water use (via contacting head water meter)
Monitor blow down water use (via contacting head water meter)
Receive 4-20mA inputs and provide direct control of system parameters based on input signals.
Provide data logging features, with download capability to a PC via Ethernet or wireless network
“Real-Time” monitoring of scale/corrosion inhibitor levels in the cooling tower systems whenever they are running.
“Real-Time” monitor for both planktonic (free flowing) and sessile (attached) microbiological activity in re-circulating cooling water systems.
Multiple controller inputs
Multiple controller outputs
Online corrosion monitors to log corrosion data “Real-Time” so that immediate chemistry changes can be made.
Appendix C
Building 2 Systems, and Equipment
Boilers:
Three natural gas fired, 25,000 pound per hour, fire tube, 100 PSIG
Domestic Water:
3 sodium zeolite softeners.
3 charcoal bed filters.
Condensate Return:
One condensate receiver
Deaerators:
One 20,000 pound per hour, spray and tray type
Feedwater Pumps:
Three electric driven pumps
Boiler Chemicals Currently Used:
Sodium Bisulfite
Sodium Sulfate
Cyclohexylamine
Diethylethanolamine
Morpholine
Potassuim Bisulfite
Cobalt Sulfate
Methanol
Sodium Hydroxide
Glutaraldehyde
Alkaline Liquid Bromine
WATER FILTER SYSTEM
The carbon filter-based system produces 150 gallons of water per minute at 3-5 microns nominal filtration. The system uses a triple tank with all tanks in parallel with staggered backwash and is located in building two. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations. All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.
HVAC HOT WATER SYSTEM (Closed Loop)
Hot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set-point. Building 1- five loops, building 2, Boiler room- one loop, building 5- one loop, Building 6- one steam heated loop and one solar heated loop.
Systems must be closely monitored and sampled at least monthly; corrosion indicator coupons examined every 90 days. Water treatment shall be on an as needed basis to control any corrosion.
Appendix D
Building 1,2, 5 & 6 Systems and Equipment
1. HVAC HOT WATER SYSTEM (Closed Loop)
Hot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set point. Building 1- Four Loops: D&T
Basement; Room BD-423 D&T, Ambulatory Basement; BB-208, Admin Basement; BD-160, MH
Basement; BE-101, Emergency Department extension (roof-top). Building 2 – one loop, Boiler Room, building 5- one loop, basement, building 6- one loop (steam heated) & one loop (solar heated), room to be determined (currently under construction). Systems must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion and maintain proper residual.
2. REFRIGERANT CONDENSER WATER SYSTEM (Closed Loop)
Chilled water system for cooling the condenser water for freezers, and refrigerators. Water is continuously circulated in a closed loop through plate/frame heat exchangers to maintained temperature set point. Building 1, Fourth floor. System must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion.
3. HVAC ENERGY RECOVERY SYSTEM (GLYCOL LOOP, 30%)
The glycol and water run-around coil system are an energy recovery system for the HVAC air handling units located in Building 1, on the fourth floor and the roof. All the individual water systems are combined into a single fill and chemical addition location. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations. All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.
4.HVAC SOLAR ENERGY HEATING SYSTEM
The Solar Energy Heating System for Building 6 is designed to capture heat from solar panels on the roof and use that heat through the closed loop system to heat up, directly or augment, the building heating/re-heat system. The solar heating system is integrated with the steam heating system utilizing the same circulating pumps and the same heat exchangers. Treatment must be sufficient in chemical nature to provide corrosion inhibitor to all piping, and freeze protection to the exposed panels/piping in colder months. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations. All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.
Appendix E
Chilled Water System
BUILDING SYSTEM Operation Frequency Side Filter
2 Chilled Water, Closed Loop
Five 1300-ton chillers
Year-round Monthly Yes
Appendix F
Price Per Test – To be utilized for any additions or subtractions in future testing requirements.
Conductivity; Conductivity Meter $1.00
PH; PH Meter $1.00
Chlorine Residual, Free/Total; DPD Colorimeter USEPA (Hach Field Test) $5.00
Hardness; Drop Test, Titration $5.00
Water Temperature (Hot & Cold), Contact Thermometer $5.00
Dip-slides $6.00
Nitrite $5.00
File details come from the government source that posted it. Updated .