SOW_Seeding_West.pdf
PDF 261 KB Posted
- Attached to
- West Fire Seeding, 1000 acres Federal contract opportunity
- Solicitation number
- 140L3723Q0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3723Q0015_Amd_0001.pdf | ||
| West_Final_24K.pdf | ||
| Wage_Determination_2015-5439_r20.pdf | ||
| Sol_140L3723Q0015.pdf | ||
| West_NAP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L3723Q0015
UNITED STATES DEPARTMENT OF INTERIOR
BUREAU OF LAND MANAGEMENT
Little Snake Field Office
455 Emerson Street
Craig, Colorado 81625
Statement of Work
West Fire Seeding
SECTION A – SCHEDULE OF ITEMS
Item Description Est. Quantity Unit
1 Seeding – West Fire 1000 Acres
PERFORMANCE TIME: Date of award – December 31, 2023. The area must have at least 1 inch of continual snow cover.
ESTIMATED START WORK DATE: February 23, 2023
PERFORMANCE PERIOD: All work must be completed within the period of performance.
SECTION B - SPECIFICATIONS APPLICABLE TO SEEDING EQUIPMENT
B.1.1 DESCRIPTION OF WORK - The Contractor shall seed 1000 acres at ~10 pounds per acre. No ground disturbance will be allowed. BLM will provide the seed in 50 lb. bags.
B.1.2 LOCATION OF PROJECT UNIT – The project area is located approximately 58 miles Northwest of
Maybell, CO. Lat/long of the site is 40°59.452 x-108°57.242 Maps showing the specific project areas are attached at the end of this document.
B.1.3 SUMMARY OF PROJECT UNITS TO BE TREATED –
Item Est. Acres to be seeded Elevation Est. Lbs Seed
1 1000 8000-9400 ft. 8,500 lbs
B.1.4 SECURITY OF EQUIPMENT – The Contractor may leave their equipment at the work site however the
Contractor shall be responsible for the equipment if it should be lost, stolen, vandalized or damaged.
B.2.1 CONTRACTOR FURNISHED ITEMS - The Contractor shall provide all labor, transportation, fuel, tools and equipment necessary to perform the requirements of this contract.
B.2.2 SEED APPLICATION EQUIPMENT - The Contractor shall evenly distribute the designated seed at the rates specified. Application equipment shall be equipped for carrying seed with distribution mechanism including release, shutoff, and spreading device which can be calibrated for spreading seed at the prescribed rate in an acceptable manner and uniform pattern. Seed application equipment shall include lids/covers which fasten securely to prevent seed from blowing out.
B.2.3 GLOBAL POSITIONING SYSTEM - Application equipment furnished by the Contractor shall be capable of electronically mapping application routes to ensure seed is applied evenly and completely and at the specified rates. Within three days of project completion, shapefiles/maps of application routes shall be submitted to the COR (Contracting Officers Representative).
B.2.4 GOVERNMENT-FURNISHED PROPERTY – BLM will provide GPS compatible files that depict the seeding boundaries and work location maps of the project area. BLM will provide the pre-mixed seed in
50 lb. bags
SECTION C - SPECIFICATIONS APPLICABLE TO SEEDING
C.1.1 DISTRIBUTION OF SEED - All seed (government furnished) will be available for pick up from the
Little Snake Field Office at 455 Emerson St., Craig, CO.
C.1.2 APPLICATION – Apply mixed seed at a uniform rate per horizontal acre, minimizing overspray outside of treatment boundaries. Seed strips shall be distributed in such a manner as to provide uniform seed distribution. Such distribution shall not vary more than 10 percent above or below the specified pounds per acre. Seed application mapping data/mapping from the application equipment shall be provided to the Government following application. Seed application rate per acre is specified below.
Seed Application Rate Per Acre
Item No. Project Name Pounds Per Acre
1 West Fire 8.5
C.1.3 GOVERNMENT FURNISHED GPS COORDINATES – GPS compatible files that depict project boundaries will be provided. Boundaries will not be marked on the ground.
C.1.4 NOTIFICATION REQUIREMENTS – Notify the BLM representative at least 24 hours prior to commencing seeding operations.
C.1.5 Immediately notify the COR of any application equipment incident.
SECTION D - INSPECTION, ACCEPTANCE, MEASUREMENT, PAYMENT
D.1.1 INSPECTION
D.1.2 The COR or PI will spot inspect seeded areas for sufficient seed coverage.
D.1.3 Where skips or insufficient application are documented during “on the ground inspections” by the COR, retreatment will be required at no extra cost to the Government or a deduction in payment will be calculated.
D.2.0 ACCEPTANCE
D.2.1 Acceptance will be based upon the satisfactory completion of the requirements in Section C.1.2
APPLICATION. The acceptable quality level is 95%. Meaning 95% of the designated seeded area must meet the requirements in C.1.2. If the acceptable quality level is found to be below 95%, per acre deduction will be made for any acres not meeting the specifications.
D.3.0 MEASUREMENT
D.3.1 The determination of the acreage of completed work will be made from contactor provided data and converted by BLM in a shapefile. Area measurements required under this Contract will be measured on a horizontal plane.
D.3.2 Remeasurement of the acreage under this Contract will be made upon the written request of the
Contractor. The request for remeasurement must be made in writing within 10 calendar days after completion of the work. If remeasurement indicates a difference of not more than 5 percent from the original measurement, the Contractor shall pay the actual cost of the remeasurement. Payments will be based on the second measurement where the difference between measurements is more than 5 percent.
Where the difference is less than 5 percent, the results of the first measurement will be used.
D.4.0 PAYMENT
D.4.1 INVOICING – Invoice(s) shall be submitted through the following website:
https://www.ipp.gov
D.4.2 Payment for seeding will be based on the actual number of acres seeded as applied according to the contract specifications within designated project boundaries and in accordance with Section C.1.2
APPLICATION.
D.4.3 If a deduction is determined necessary, it will be based on the awarded per acre price multiplied by the number of acres not meeting the specifications in C.1.2.
SECTION E – ATTACHMENTS
West Seeding Project Maps
File details come from the government source that posted it. Updated .