SOW Rodent Control Baton Rouge LA - EW LB 012224.docx

DOCX document 176 KB Posted

Attached to
Rodent Control Federal contract opportunity
Solicitation number
12405B24Q0090
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery

About this file

This document contains a statement of work and related federal contract opportunity for rodent control services. The statement of work details the required services of implementing an initial response service as well as monthly rodent baiting, trapping, and removal services at the Honey Bee Breeding, Genetics & Physiology Lab in Baton Rouge, Louisiana. The related federal contract opportunity is a request for quote seeking these rodent control services with a closing date of February 23, 2024. The solicitation will result in a firm fixed price contract awarded based on lowest price technically acceptable to the small business contractor that can demonstrate meeting the technical specifications and statement of work while having satisfactory past performance and price.

View the file

Other files for this federal contract opportunity

Other files attached to Rodent Control, newest first.
File Type Posted
Updated SOW Rodent Control Baton Rouge LA - EW LB 012224.docx DOCX document
Wage Rates.pdf PDF
Service Provisions 1119023.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Rodent Control Honey Bee Breeding, Genetics & Physiology Lab 1157 Ben Hur Road, Baton Road, LA 70820

Prepared by:

Everett Wilson

STATEMENT OF WORK:

Contractor shall furnish all labor, materials, and supplies to perform the following work for U. S. Department of Agriculture, Agricultural Research Service, Honey Bee Breeding, Genetics & Physiology Laboratory, Bldg. B11, 1157 Ben Hur Road, Baton Rouge, LA 70820.

All work shall be completed in accordance with all local, state, and federal codes and regulations. All work should meet the manufacturer’s requirements for all equipment used in the project. All work shall also meet the requirements of the ARS Facilities and Design Standards (P&P 242.1). The P&P 242.1 document can be found at: http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf. All work shall be accomplished in a professional manner and in accordance with good workmanship and acceptable practice.

Contractor is responsible for inspecting the site and for determining the exact requirements of the service with input from site personnel prior to submitting proposal and detailed cost breakdown.

Contractor shall obtain at own expense all permits, licenses, and inspections required by all local, state, and federal authorities. Contractor shall submit written specifications for all materials and supplies to be used and included in the bid.

Contractor’s working hours shall be scheduled to coincide with the normal working hours (7:30am-4pm) at the site. Should it be necessary to schedule working hours other than normal working hours, contractor shall arrange for access to the work area with the Contracting Officer’s Representative (COR) at the site at least three days prior to the need.

Contractor shall notify and schedule utility outages at least 24 hours in advance.

During work, contractor shall maintain a safe work area around the site of repair and clearly mark danger areas with cones and safety tape. All unused and demolition materials shall be removed from the site by the contractor and shall not be placed in the owner’s disposal areas. The contractor will be responsible for replacing at their cost any property damaged at the site during the construction process.

PROJECT REQUIREMENTS:

Provide all labor, equipment, and materials required to:

Implement initial response service as well as monthly services to ensure comprehensive rodent baiting/trapping (indoor and outdoor) for the above-mentioned property. After initial and monthly service is completed, maintain the rodent control service by checking outside bait stations and maintaining baiting/trapping activities on property to keep the Lab free from future infestation including once a week trapping and baiting and removing of dead rodents to permanently remove infestation.

Site Visit:

Proposers are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a proposal is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.

Utilization of Bio-Based Products:

As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c) (3)), the Offeror certifies, by signing this offer, that bio-based products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 3201, subpart B) to be used or delivered in the performance of the contract, other than bio-based products that are not purchased by the Offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.

The contractor shall utilize products and material based from bio-based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at:

https://www.biopreferred.gov

Recycling.

Contractor shall make best effort to recycle any construction debris created during the contract.

Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. Contractor shall furnish a Site-Specific Safety Plan (SSSP) and the Government shall review the SSSP prior to the beginning any construction activities. SSSP shall be in typically accepted industry format.

Detailed Proposal: A detailed cost proposal is required. Provide all materials, labor, and equipment to fully and successfully complete the Statement of Work described in this document. Proposal cost detail shall be in MS Excel and the work description shall be in MS Word.

CONTRACTOR RESPONSIBILITY:

The project will be performed per the following specifications:

1. All work shall comply with existing local, state, and national codes, including guidelines and specifications included in the Americans with Disabilities Act. All work shall also meet the requirements of the ARS Facilities and Design Standards (P&P 242.1) which can be found at http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf. All work shall be accomplished in a professional manner and in accordance with good workmanship and acceptable practice.

2. Contractor will verify all dimensions and quantities of materials and existing site conditions prior to beginning work.

3. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.

4. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.

5. Contractor will provide daily reports of work performed to the COR.

6. Contractor shall remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site on a weekly basis.

7. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.

8. Contractor must have a superintendent responsible for overseeing this project.

9. Contactor will provide their restroom facility.

Material / Submittals:

The material for the entire work shall be as specified above. Submittals on all materials used on this project shall be submitted to the Contracting Specialist as noted in this document. The documents detailing the material covered by the submittals will be provided electronically.

Service Procedure:

Contractor will verify all site conditions prior to beginning work. Contractor will schedule the work between working hours as listed below. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall be responsible for always protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.

Damage to Property:

Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.

Inspection and Acceptance:

A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.

Service Schedule:

This service shall be ongoing once the initial response is completed within 30 days from date of notice to proceed (NTP).

Work Hours:

Contractor work hours shall be Monday through Friday, seven thirty (7:30) A.M. to four (4) P.M. except for Government holidays or at the discretion of the site with written approval obtained a minimum of 24 hours in advance.

image1.png

File details come from the government source that posted it. Updated .