SOW - Preventative MX Lenel CVN software.docx

DOCX document 34 KB Posted

Attached to
CVN Service Agreement Federal contract opportunity
Solicitation number
FA488720Q0028
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to CVN Service Agreement, newest first.
File Type Posted
Solicitation Amendment FA488720Q00280002 SF 30.pdf PDF
Solicitation Amendment FA488720Q00280001 SF 30.pdf PDF
CVN Badge MX RFI Response.pdf PDF
Statement of Work 8 Jul 2020 Rev1.pdf PDF
Solicitation - FA488720Q0028.pdf PDF
Wage Determination 2015-5469 Rev 11.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

56th FW/CVN ADVANCED PROGRAMS OFFICE

LUKE AIR FORCE BASE ARIZONA

MEMORANDUM FOR: 56 CONS DATE 21April 20

FROM: 56 FW/CVN

SUBJECT STATEMENT OF WORK: Preventative Maintenance for Current Lenel Software

Quarterly Preventative Maintenance Agreement to perform inspections, testing and adjustments of card reader controlled doors, surveillance cameras, perimeter door position switches, equipment enclosures and server/storage equipment racks as required. The Maintenance Agreement should include: back-up of access control system configuration; archiving of cardholder database/transaction logs; back-up video management system configuration; confirm correct recording preferences (application reprogramming excluded); de-fragment all hard drives as needed; run system-wide diagnostic reports in order to identify nuisance alarms and/or faulty equipment (if needed, repairs performed pursuant to Service Agreement); and optimize video recording storage arrays as needed (application reprogramming excluded). The Preventative Maintenance Agreement should address any vulnerability assessments required to identify gaps in current electronic security protection scheme and Customer interview regarding needs analysis.

Quarterly inspections will be performed by a Lenel certified technician.

Preventative Maintenance should include the following:

1. Battery testing of all system backup batteries with replacement of these batteries as needed at no additional cost.

2. System checks including, error logs, false alarms, trouble conditions, badge printer errors

3. Reader and door hardware function testing.

4. Camera focusing, cleaning, and adjustments.

5. System backup configuration.

Options requested outside normal quarterly maintenance:

· System software configuration changes or additions

· Additional system use training and/or refresher training

· Custom report generation

· Equipment replacement (if equipment is provided by the Government)

· Design requests

Ability to provide Technical support

Period of Performance 12 month base period with 4 quarters, with 4 option periods.

Documentation will include the following:

1. Quarterly reports after each inspection.

image1.jpg

File details come from the government source that posted it. Updated .