SOW - Mooring Winch Component Procurement Install Updated.docx
DOCX document 28 KB Posted
- Attached to
- Mooring Barge Winch Component Federal contract opportunity
- Solicitation number
- W912EE23Q0020
About this file
This scope of work document and solicitation request quotes for replacement components for four mooring winches on a US Army Corps of Engineers mooring barge. The contractor must provide replacement motors, pumps, and controls that meet the detailed technical specifications provided, including minimum displacement, pressure ratings, speeds, flows, dimensions, materials, and control system requirements. Quotes are due no later than March 23, 2023 and shall be submitted electronically to the USACE Vicksburg District. The solicitation is a 100% small business set-aside being conducted by the Department of the Army Corps of Engineers Vicksburg Engineering District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EE23Q0020 Winch Components.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mooring Barge Winch Component Procurement
Scope of Work The Mat Sinking Unit of the US Army Corps of Engineers, Vicksburg District, requires a contractor to provide replacement components used to operate four (4) of the mooring winches on Mooring Barge 7403. The winches on our mooring barge are used to position the barge and therefore the concrete mats that are sunk into the Mississippi River. The winches are run by an Oilgear motor (model # MFS-225, part # R506546-906) and Oilgear pump (model # PVLKVH-250, part # R716819). The contractor shall provide replacement motors, pumps, and controls for four of the winches on the mooring barge. The required specifications for each component is listed below in the requirements section.
Requirements – Motor
· Axial piston fixed motor
· Minimum displacement – 355 cm^3 (21.6 in^3)
· Minimum required nominal pressure – 350 bar (5075 psi)
· Minimum required maximum pressure – 400 bar (5800 psi)
· Minimum required maximum speed (nominal) – 2000 rpm
· Minimum inlet flow at nominal speed – 2240 rpm
· Minimum torque at nominal pressure – 1978 Nm (1458 ft-lb)
· Rotary stiffness – 96.1 kNm/rad (1237.09 ft-lb/deg)
· Moment of inertia for rotary group – 0.102 kg·m^2 (0.02089 lb/ft^2)
· Maximum angular acceleration – 144.86 rad/s^2
· Case volume – 3.5 liters (0.92 gallons)
· Weight – approximately 110 kg (242.5 lbs)
· Drive shaft – 60 mm (2.36 in)
· Minimum permissible radial force at 52.5 mm from shaft collar – 1.5 kN (337 lbf)
· Minimum permissible axial force, when standstill or in non-pressurized conditions – 2500 N (562 lbf)
· Bearing flushing flow – 16 liters/min (4.23 gallon/min)
· Working port size – 1-1/2” – threads – M16 x 2, 21 mm deep, SAE J518 standard – delivered with protective cover (must be connected)
· Drain port 1 size – M33 x 2, 18 mm deep, DIN 3852 standard – delivered with protective cover
· Drain port 2 size – M33 x 2, 18 mm deep, DIN 3852 standard – plugged
· Bearing flushing port size – M14 x 15, 12 mm deep, DIN 3852 – plugged
· Splined shaft in accordance with DIN 5480
· Must align with applicable pump in accordance with pump requirements
· Parallel keyed shaft in accordance with DIN 6885
· Must align with applicable pump in accordance with pump requirements
· Long-life bearings
· Fixed bent-axis design
· Flushing and boost pressure valves mounted
· Pressure relief valves required
· Counterbalance valve required
· 8-hole mounting flange
· HDD speed sensor mounted
Requirements – Pump
· Parker Denison GOLD CUP P30 or equivalent hydrostatic transmission piston pump
· Variable displacement, closed circuit hydraulic pump
· Max displacement – minimum 30 in^3/revolution
· Continuous pressure – minimum 5000 psi
· Intermittent pressure – minimum 5500 psi
· Max pump speed at full stroke – 1800 rpm
· 4-bolt mounting flange standard – SAE F/ISO 177-4
· Keyed shaft standard – SAE F / ISO 50-1
· Must align with applicable motor in accordance with motor requirement
· Splined shaft standard – SAE F / ISO 50-4
· Must align with applicable motor in accordance with motor requirement
· Weight of pump without controls – maximum 850 lbs
· Rotating inertia – no more than 975 lb-in^2
· Maximum continuous allowable case pressure – 75 psi
· Minimum flow at max displacement at 1500 rpm – 195 gallons/minute
· Internal Auxiliary Pump – Parker Denison GOLD CUP P30S or equivalent
· Displacement – 2.81 in^3/revolution
· Flow
· At 1500 rpm – 6.5 gallons per minute
· At 1800 rpm – 7.8 gallons per minute
· Replenishing pressure – replenish pressure minus case pressure – 180 – 220 psi
· Servo pressure – servo pressure minus case pressure at 0 psi discharge pressure
· 308-420 psi
· Servo pressure – for HI-IQ control units – servo pressure minus case pressure at 5000 psi at system pressure range 0 to 5000 psi
· 500-650 psi
· Compensator response per SAE J497 @ 5000 psi
· Off-stroke seconds – 0.1
· On-stroke seconds – 1.8
· Compensator adjustment – 2000 psi per turn
· Torque turn rotary servo shaft – 20 in-lbs
· Maximum inlet at auxiliary pump inlet – 200 psi
· Standard factory compensating pressure – 1000 psi
· Quick change valve block that is easy to service
· Quick change controls that are easy to service
· Dampened low inertia rocker cam that is more stable and quieter/faster than other designs
· Zero-backlash rotary service design
· Field adjustable compensator override – can be adjusted easily without removing machinery
· Precision barrel bearing to allow for high speeds, high pressure and long life
· Versatile controls that can be located on either side of pump depending on orientation of machinery
· Auxiliary pump able to be changed without disassembling transmission
· SAE drive shafts allowable
· Shafts seals able to be changed without disassembling transmission
· One piece stroking vane/cam
· Pressure loaded stroking vane seals
· Rocker cam displacement indicator
· Modulated servo pressure
· Standard SAE split flange connections and SAE mounting standards
· Parker 9A controls or equivalent
· Electrohydraulic stroker w/adjustable maximum volume stops
· Control displacement in proportion to electric current from 0 to 350 mA (24V) or 0-650 mA (12V)
· Control signal – pulse width modulated signal
· Current signal to one coil drives pump in one direction and to other coil for opposite direction.
· Adjustable maximum displacement stops included
· Hysteresis – 5% typical, 8% maximum
· Linearity – 8 %
· Response – 1.8 seconds for zero to full stroke or back
· 2% repeatability
· Temperature null shift - <2% per 100°F
· Servo pressure requires – 200-1000 psi, 400 nominal
· Manual override with Allen wrench/hex key
· All fluid types
· DIN 43650 type AF electrical connector
· Secondary control torque limiter included
Requirements – Controls
· Parker IQAN or equivalent control system
· Consists of controller(s), display module, and all ancillary equipment
· 24 VDC
· Pressure, temperature, tilt sensors
· Fault detection for shorts/broken wires
· Deutsch connectors
· #6 SAE port connectors
· Controller – IQAN XC42 or equivalent
· To be installed in hull with pump, mounted to bulkhead
· NEMA 4 plastic/fiberglass enclosure
· Connections sealed with Roxtec or equivalent
· Inputs: digital, analog, voltage, current, frequency
· Outputs: digital, analog, and PWM (proportional)
· Receives input from pump/servo
· Send output to pump control
· Receives input/sends output to/from operator control station
· Remote diagnostics capability for phone/tablet via bluetooth
· New control station on main deck at winches in same location as existing station
· Station shall be at suitable height for standing while operating
· Connected to controller in hull via Canbus/J1939 connections
· 7” minimum touchscreen display module
· Program logic and display all-in-one
· Allow digital and analog inputs
· Joystick(s)/control(s) as needed to operate P30 (or equivalent) pump
· Fault detection capability for shorts/broken wires
General Requirements
· Contractor is required to install all new pumps, motors, controls, and ancillary equipment for four (4) of the winches on Mooring Barge 7403.
· Mat Sinking Unit personnel will be responsible for removing the existing equipment including the pumps, motors, controls, and ancillary equipment
· Contractor shall provide new drop-in frames to house the provided motor and pump (for all four sets of motors/pumps)
· To be installed by the contractor
Delivery and Installation Period
· All requirements shall be completed no later than June 30, 2023.
Security Requirements
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Antiterrorism (AT) Level 1 training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).
Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.
Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
File details come from the government source that posted it. Updated .