This is a Statement of Work (SOW) for the repair of a Dual Point Davit Cradle on the United States Coast Guard vessel CGC FORWARD. The work requires the contractor to repair cracked welding on the forward cradle chock stay bracket of a Welin Lambie Dual Point Davit by removing the deteriorated plate, cleaning the cutout to good metal, installing a backing strip, fabricating a new steel insert, and performing full penetration welds in accordance with Surface Forces Logistics Center Standard Specification 0740 and MIL-STD-22D. The contractor must also conduct touch-up preservation on all new and disturbed surfaces to match existing adjacent surfaces per SFLC Standard Specification 6310, and perform both post-repair weight testing at 3,080 lbs and operational testing in the presence of the Coast Guard Inspector to ensure satisfactory operating condition and proper alignment of components.
The related solicitation (52000QR260025301) is a Request for Quote issued by the Department of Homeland Security US Coast Guard Surface Forces Logistics Center for the Dual Point Davit Repairs. This is a total small business set-aside (1300 employees NAICS 336611) processed under FAR Part 12 as simplified acquisition procedures with a firm-fixed price basis. The period of performance is June 15, 2026 through June 26, 2026, with work to be performed at CGC FORWARD, 4000 Coast Guard Boulevard, Portsmouth, Virginia 23703. Vendors must submit detailed product/service information, product data sheets, and a comprehensive cost breakdown for technical review. The government reserves the right to award on an all-or-none basis to the offeror submitting the lowest aggregate price. The point of contact is Engineer Officer Lieutenant Claire Gilliland at (508) 367-9123.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 25301 FAR CLAUSES.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dual Point Davit Cradle, Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to repair cracked welding on the forward cradle chock stay bracket for the Welin Lambie Dual Point Davit.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 905 WMEC 583-024, Rev G, OTHB Davit Arrangement Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation Coast Guard Publications Coast Guard Technical Publication (TP) CP-H5-0001-V0, Aug 2023, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 Thru 5558-15 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SLFC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References MIL-STD-22D, May 1979, Welded Joint Design
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, (Interferences). Known interferences include, but are not limited to the following:
· Deck grating
· Wire ropes
· Boat Davit cradle
· Cradle stay
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.3 Bracket alignment. The Contractor must utilize existing mounting plate to measure proper alignment of bracket when attached to cradle chock.
3.4 Weld repair. The Contractor must accomplish the following as designated by the Coast Guard Instructor and using Coast Guard drawings 905 WMEC 583-024 and 905 WMEC 583-025 and Coast Guard Technical Publication (TP) CP-H5-0001-V0 as guidance. See Figure 1 for repair details.
Remove deteriorated plate from bracket.
Clean cutout to good metal ensuring to remove previous metal deformation in lower left corner.
Tack weld backing strip on the inside of cutout.
Fabricate new steel insert to fit new hole dimensions Full penetration weld new insert in accordance with SFLC Std Spec 0740 and MIL-STD-22.
Weld bracket to new insert in accordance with SFLC Std Spec 0740 and MIL-STD-22.
3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.6 Weight test, post repairs. The Contractor must “Weight Test” test the affected boat cradle and chock to 3,080lbs in accordance with paragraph 3.2.8 of SFLC Std Spec 5000.
3.6.1 Test load must be applied to the bracket, in the same load direction as under normal operation.
3.7 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.7.1 Adjust chocks and keel/side blocks to ensure proper fit of CB-OTH.
3.7.2 Check alignment of the strut and ensure there is no binding of the strut within the bracket.
4. Place of Performance:
CGC FORWARD
4000 Coast Guard Blvd Portsmouth, VA 23703
5. Period of Performance:
Primary: 15 June 2026 – 26 June 2026
6. NOTES
Point of contact: Engineer Officer, Lieutenant Claire Gilliland (508) 367 9123 image1.jpeg