Statement of Work Bldg 2320 Storage System Replacement
1. General The 87 CS Asset Management office (87 CS/SCOS) is responsible for receiving and distributing all IT assets for AF units on JB MDL. This Statement of Work (SOW) addresses the need to repair the current rack storage system as it is no longer functional. This system supports the sole location for storage of all JB MDL computer, server, and network equipment assets on the Joint Base.
2. Scope of Work The contractor will be required to provide and remove/install components in order to repair the current rack system mechanism in the warehouse area of Building 2320. This will include removal and disposal of the old rack system mechanism as necessary. The system will be required to match the current storage capacity and provide mobile racks to preserve existing storage and retrieval capabilities. The system provided should be fully functional without any additional equipment or services.
3. Objectives
· Provide a fully functional mobile storage system
· Minimal modification to the existing facility
4. Personnel The selected vendor will provide delivery and installation of the storage system and accessories. The selected vendor will provide all necessary material handling equipment such as forklifts or lift platforms to complete the installation. The selected vendor will be responsible for the proper disposal of all packaging/crating materials and/or other waste generated in the installation process. All work must be performed Monday through Friday between the hours of 7:30 am and 4:00 pm. No work will be performed on weekends, federal holidays, JB MDL family days or before/after the hours specified on weekdays unless prior approval of the contracting officer’s representative is obtained.
5. Equipment Requirements Bldg 2320
· (3) Mobile pallet rack carriages 74’4 ½” in Length
· Each Row consists of (6) 12’ wide pallet rack sections back to back.
· Total of 36 pallet sections of pallet rack.
· (72 Positions with 2-Tier Shelving)
· (108 Sections with 3-Tier Shelving)
6. Deliverables Installation shall begin within 4 weeks of award and shall be complete within 45 business days.