SOW for Facility Security Upgrade July 2020.pdf
PDF 139 KB Posted
- Attached to
- Simulator Facility Security Upgrade Federal contract opportunity
- Solicitation number
- FA483020Q0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA483020Q0017 Combo.pdf | ||
| Single Source Justification for Advantor Security upgrade June 2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
347th Operations Support Squadron - A1C Justin Wood Rescue Simulator Facility
Building 673, Moody AFB, Georgia - Security Enhancement Project
STATEMENT OF WORK JULY 2020
Project Purpose:
To upgrade existing security features to the A1C Justin Wood Rescue Simulator Facility, Moody AFB, GA, Building 673. Additional security features requested include Access Control System (ACS) expansion, and Closed Circuit Television (CCTV) monitor system. This will include adding access controls to an exterior door, video monitoring at two exterior doors and one internal door. Building security representative require the ability to monitor exterior and internal conditions at CCTV locations through two monitor locations in the building, and remotely allow for exterior door release based on security parameters and policies.
Scope of Work/Requirements:
1). Install one (1) ACS Prox and PIN card reader on exterior door facing Sijan Road. Existing door has mag locks, door position switches, request to exit PIR, and emergency egress button. ACS must be integrated into SFXi System Control Suite to allow for programing of the exit door.
2). Install remote door release buttons in room 103 and room 213 by which exterior access controls can be released. System must be controlled through an Advantor desk top work station (DIVARIP).
3). Install three (3) CCTV camera system (not integrated with IDS) at exit door facing facility parking lot, at exit door facing Sijan Road, and corridor/door entry to secure area. CCTV must have the ability to be monitored by two Contractor provided monitors (at least 24 inch) installed in room 103 and 213. CCTV system must have record capability for at least two weeks (14 days), and have associated equipment/work station for CCTV programing. No tampers will be required.
4).Provide and install Infraguard expansion panel in room 206 to accommodate additional features.
5). Provide the 120 VAC from the client-provided breaker box to the infraguard expansion panel.
6). Ensure doors are listed and integrated in the IG2 ACS panel.
7). Install as required, new low-voltage cabling and is possible, use existing conduit.
8). Install and program the access control to support a global free exit (door lock release) on fire alarm.
Quality Assurance:
1). A performance verification test will be required prior to turnover to the Government
2). A Submittal package is required that includes project specification sheets, and design drawings.
3). Provide an As-built drawing in PDF format no-later than 120 days after completion of the work.