This statement of work outlines requirements for replacing doors at Facility 316 at Vance Air Force Base in Oklahoma. The contractor will provide and install one set of double doors approximately 76 inches by 96 inches with Kawneer doors, gray tinted tempered glass, concealed rod panics, surface closers, and IC core cylinders with pull handles. The contractor must schedule work in advance with the base, have a representative on site to supervise the work, and be responsible for cleaning up and removing all waste materials. The work must be completed within seven days of starting. This relates to the federal contract opportunity posted by the Department of the Air Force Air Education and Training Command to provide a set of doors for Facility 316.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Set of Doors RFQ.docx | DOCX document | |
| PR-TMP-01 Rev 8.0 Annual Commercial Item Acquisition Reps Certs.docx | DOCX document | |
| W-9 2018.pdf | ||
| FN-TMP-14 Vendor Authorization Request.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FACILITY 316 Replace Doors
WT #13128575
VANCE AFB, OK
June 27, 2023
PART 1 GENERAL
1.01. LOCATION
A. Location of work to be accomplished under this statement of work is at Vance AFB Enid, Oklahoma. Specific location is the Fitness Center Facility 316 Northwest doors.
1.02. SCOPE OF WORK
A. The work covered under this statement of work shall consist of the following: Contractor will provide and install 1 set of doors for facility 316.
1. One Set double Doors, approx. 76” x 96”
2. Kawneer Doors w/ standard concealed rod panics
3. Gray tinted/clear insulated tempered glass
4. IC core cylinders w/ pull handles
5. Standard surface closers
6. Installation of doors
1.03. SCHEDULE OF WORK
A. Contractor will schedule work times in advance of arrival on site with the Lead, Structures Shop or the Structures Supervisor.
B. Contractor may work evenings or weekends. As long as the facility manager agrees to the schedule, this may be accomplished.
C. Contractor will be liable for any and all replacement cost for facility damage caused while performing assigned work.
1.04. CONTRACTOR’S REPRESENTATIVE
A. A representative of the contractor shall directly supervise accomplishment of this work. The representative shall be responsible for coordinating all phases of work with Contracting Office. The representative shall be on the job site or readily accessible at all times work is being performed and shall have authority to execute no cost field changes on behalf of the contractor if agreed to by all parties involved.
B. This person will also be responsible for all quality control of the job site and will be held responsible by the Contracting Office for the removal and installation of all products in accordance with this statement of work. The representative shall be competent and familiar with all phases of work under his authority. The contractor’s representative shall have in his possession a minimum of one pager or cell phone with local telephone number; this telephone number will be on record with Contracting Office.
1.05 PROVIDED SERVICES AND UTILITIES
A. Electricity: All reasonable required amount of electric power will be made available to the contractor by Contracting Office from the nearest suitable and available connection.
B. Water/Latrine: All reasonable required amount of water will be made available to the contractor. Latrine on location will be made available to installers.
1.06 INSPECTION
A. The work will be conducted under the general direction of the Contracting Office and is subject to the inspection of the appointed inspectors to ensure strict compliance with the terms of the contract.
1.07 EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERALS OR WASTE)
A. All waste materials resulting from accomplishment of this work shall become the property of the Contractor. The Contractor will remove all waste from this project off the installation. No removed materials may be left on the installation once it is completed.
1.08 SPECIAL MATERIALS
A. Prohibited Material; The manufacturer of materials that are to be used in this contract has certified that the product does not contain mercury, toluene, chlorinated solvents, hydrolysable chlorine derivatives, ethylene base glycol ethers and their acetates, nor any carcinogen, as defined in 29 CFR 1910,1200. Materials used shall not contain lead and hexavalent chromium compounds. In addition, the Contractor shall comply with federal regulation 16 CFR-1303 in the use of lead, use on touch-up for damaged furniture or any interior surface of a facility. If lead based paint is used it shall be tested as specified ASTM-D 3335, the lead content shall not exceed 0.006 percent by weight of the dry film and the test for chromium content shall be negative.
B. At no time shall class 1 Ozone Depleting Chemical (ODC’s) be specified and shall not be used unless otherwise allowed by the Contracting Administrator
Part 2 EXECUTION
2.01 PREPARTION / INSTALLATION
A. All work will be completed within seven days of beginning the work.
B, The Contractor working with the Contracting Office inspector will at all times provide a working schedule to CE Operations Management.
B. Once work is complete, area will be cleared of any debris caused by contractor.
END OF STATEMENT OF WORK
| SHORT TERM ORGANIZATION HAZARDOUS MATERIAL INVENTORY1 |
| PROJECT RESOURCES INC. / DEL-JEN INC. |
1. PRIME CONTRACTOR / ORGANIZATION:
1. E-MAIL
1. PHONE
1. FAX
1. DATE
1. PRIME COTR / POC
1. PHONE
1. FAX
1. CONTRACT NUMBER
1. SUB-CONTRACTOR / ORGANIZATION
1. SUB-CONTRACTOR / POC
1. PHONE - FAX
1. WORKPLACE / BUILDING NUMBER
1. CONTRACTING OFFICER
1. CONTRACTING OFFICER SIGNATURE
1. PHONE
1. FAX
1. DATE
1. EXPECTED START DATE
1. EXPECTED END DATE
1. PROJECT / TASK DESCRIPTION
22. PRODUCT IDENTIFICATION
| Product Name/Part Number |
| Material Manufacturer 2 |
| Stock Number 3 |
| Solid Liquid Gas |
| Unit of Issue4 |
| Container Type |
| Max Amount Onsite at any Time 5 |
| Anticipated Amount Used for Project |
| Actual Amount Used 6 |
| Process Type 7 |
| Task Description and Application Method 8 |
FOOTNOTES:
1. This form is used for initial approval of hazardous materials and to report subsequent usage. Include all materials, which contain an EHS, TRI, CERCLA hazardous substance, toxic chemical, generates a hazardous waste after use, and/or requires a Material Safety Data Sheet.
1. Attach a copy of each MSDS
1. Identify National Stock Number if known. If unknown, leave blank, and HMMP will complete.
1. Identify amount in container & the units item is measured in, i.e. gallon, ounces, lbs, etc.
1. Identify maximum amount present (stored and used) at any one time on Vance AFB.
1. Report actual quantities used at the end of the project, or when directed otherwise.
1. See Table 1—Process Types for appropriate codes.
1. Use the Task Description and Application Method section to indicate specific process/product information, e.g. weight of each component in a kit, mix ratios, disposal info, etc.) Government will also use this section to indicate authorization status.
PD 500-1 10 Jun 10
SHORT TERM ORGANIZATION HAZARDOUS MATERIAL INVENTORY
| Product Name/Part Number |
| Material Manufacturer 2 |
| Stock Number 3 |
| Solid Liquid Gas |
| Unit of Issue 4 |
| Container Type |
| Max Amount Onsite at any Time 5 |
| Anticipated Amount Used for Project |
| Actual Amount Used 6 |
| Process Type 7 |
| Task Description and Application Method 8 |
| 23. Usage Reporting Schedule | |
| TABLE 1—PROCESS TYPES |
| CODE |
| PROCESS DESCRIPTION |
| CODE |
| PROCESS DESCRIPTION |
| 1. |
| Asbestos removal and disposal |
| 1. |
| Fiberglass or composite applications |
| 1. |
| Asphalt paving |
| 1. |
| Renovation, specify process |
| 1. |
| Abrasive blasting; specify substrate, blast media and surface area cleaned |
| 1. |
| Stationary internal combustion engines, gasoline; specify size, gallons of fuel burned, & hours of operation |
| 1. |
| Adhesives |
| 1. |
| Stationary internal combustion engines, diesel; specify size, gallons of fuel burned, & hours of operation |
| 1. |
| Brazing |
| 1. |
| Sanding, specify substrate and surface area sanded |
| 1. |
| Chemical or physical analysis |
| 1. |
| Surface coating, brush or roller applications |
| 1. |
| Cutting, oxy-fuel; specify substrate |
| 1. |
| Surface coating, spray applications in filtered enclosures |
| 1. |
| Cutting, plasma arc; specify substrate |
| 1. |
| Surface coating, HVLP spray applications in filtered enclosures |
| 1. |
| Cutting, mechanical process, specify substrate |
| 1. |
| Surface coating, airless spray applications in filtered enclosures |
| 1. |
| Construction, specify process |
| 1. |
| Surface coating, electrostatic spray applications in filtered enclosures |
| 1. |
| Demolition, specify process |
| 1. |
| Surface coating, thermal spray applications in filtered enclosures |
| 1. |
| Degreasing operations using solvents |
| 1. |
| Surface coating, spray applications outdoors |
| 1. |
| Fuel combustion |
| 1. |
| Surface coating, HVLP spray applications outdoors |
| 1. |
| Grinding, specify substrate and surface area |
| 1. |
| Surface coating, airless spray applications outdoors |
| 1. |
| Industrial boiler operations |
| 1. |
| Welding, oxy-fuel; specify substrate and filler material |
| 1. |
| Natural gas combustion |
| 1. |
| Welding, electric arc; specify substrate and filler material |
| 1. |
| Paint stripping, chemical |
| 1. |
| Soldering, specify substrate and filler material |
| Weekly |
| Monthly |
REMARKS / NOTES:
Common Units of Issue:
BG = Bag DZ = Dozen BT = Bottle GL = Gallon BX = Box JR = Jar CA = Cartridge KT = Kit CF = Cubic Foot LB = Pound CN = Can OZ = Ounce CO = Container PG = Package CY = Cylinder PT = Pint DR = Drum QT = Quart RO = Roll
Container Types: Metal, Cardboard, Plastic, Glass
PD 500-2 10 Jun 10 image10.png image1.png