SOW_Evaluation_criteria.pdf

PDF 71 KB Posted

Attached to
Lands End and Wagon Park CRI Federal contract opportunity
Solicitation number
140L3723Q0100
Issued by
Department of the Interior Bureau of Land Management Idaho Region

About this file

This document outlines evaluation criteria for a cultural resources inventory contract. The contractor will be evaluated on completing a file search and developing a historic context for the project area utilizing various existing data sources. Identified cultural resources must be recorded according to standards, with site forms including location maps, feature sketches, and bibliographies. National Register evaluations are required and must contain justifications for eligibility determinations. Draft and final reports must adhere to reporting guidelines. Safety is a priority, and hazards should be reported. The contractor must represent the Bureau of Land Management professionally and maintain open communication with the Contracting Officer's Representative.

This evaluation criteria document corresponds to a federal contract opportunity issued by the Bureau of Land Management Idaho Region to conduct a Class III cultural resources inventory for the Lands End and Wagon Park project areas.

View the file

Other files for this federal contract opportunity

Other files attached to Lands End and Wagon Park CRI, newest first.
File Type Posted
Sol_140L3723Q0100_Amd_0001.pdf PDF
Sol_140L3723Q0100.pdf PDF
BLM_UCRD_2021_S_Ps.docx DOCX document
SOW.pdf PDF
Map_Wagon_Park50k.pdf PDF
Map_Lands_End_75k.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Evaluation Criteria

TASK I-II FILE SEARCH, HISTORIC CONTEXT, INVENTORY AND RESOURCE

IDENTIFICATION

The file search and Historic Context will be evaluated on the following criteria:

1. Compliance to the standards and procedures set for in the State Protocol Agreement and

Guidelines and Procedures for Inventory, Evaluation and Mitigation of Cultural Resources 2017.

2. Emphasis will be placed on a complete file search of the area utilizing existing cultural resource data. Available existing cultural resource data shall include, but not limited to, BLM Upper

Colorado River District cultural resource inventory records, Colorado State Institutional

Archives, Repositories; listed properties in the State Historic Sites Inventory, National American

Engineering Records, and Historic American Buildings Survey records, and the Colorado Office of Archaeology and Historic Preservation COMPASS cultural resource database. Other available sources of information may be obtained from, and not limited to, State and National Registers, published and unpublished manuscripts, aerial photographs, General Land Office maps, Mining

Ledgers, historical photographs, Museums and library reference material. Data gathered will then be used to develop a Historic Context overview of the project area for prehistoric, historic and potential Traditional Cultural Properties.

3. Historic Context will be specific to the research area and contain research questions that are equally relevant and specific to the study’s subject matter. Copy and pasted regional Historic

Contexts are not acceptable unless previously discussed with COR/PI. A Historic Context and research questions from other previous reports that are within a reasonable distance of the study area can be re-used with the consent of the COR/PI.

4. File search timing: A Historic Context draft with research questions will be submitted to the

Contracting Officer’s Represented (COR) for review before fieldwork commences.

Task II consists of completion of a Class III inventory as defined in Guidelines and Procedures for

Inventory, Evaluation and Mitigation of Cultural Resources. This will be evaluated on the following criteria:

1. Compliance to the standards and procedures set for in the State Protocol Agreement and

Guidelines and Procedures for Inventory, Evaluation and Mitigation of Cultural Resources.

2. Complete and timely coverage of the survey area.

TASK III-RECORD AND EVALUATE IDENTIFIED HISTORIC/ARCHEOLOGICAL

RESOURCES.

Task III consists of two parts: part 1: recording identified cultural sites and part 2: evaluation of those sites.

All identified cultural resources shall be recorded in detail utilizing BLM Colorado Handbook of Guidelines and Procedures for Inventory and appropriate site forms. Following the BLM Guidelines for sites with relevant diagnostics, features, or other notable characteristics on each site shall be accompanied with a detailed site sketch map, feature sketch, and the site location identified on a USGS 1:24000 quadrangle map. In addition, all site forms shall have appropriate listed bibliographies of associated utilized/known references associated with site form. Incomplete site forms will be regarded as unfinished product.

Inconsistencies will be corrected prior to acceptance and given state trinomial numbers. National Register of Historic Places (NRHP) evaluations will contain thorough justifications, for or against, eligibility for nomination to the NRHP. Site integrity will be thoroughly considered with the evaluation. These justifications will be evidence based and will be applied consistently throughout the project area. No site will be left unevaluated or classified as Needs Data without the consent of the COR/PI. The COR/PI shall be notified if sites are identified that are landscape level or extend beyond 100m from the defined survey area.

TASK IV-V DRAFT AND FINAL INVENTORY REPORT

Task IV consists of writing the Draft Report. This task consists of data synthesis of the results from previous

Tasks to develop a final report. The report will reflect all fieldwork results accomplished during this contract.

Emphasis will be placed on the adherence to reporting standards procedures set forth in the State Protocol

Agreement and Guidelines and Procedures for Inventory, Evaluation and Mitigation of Cultural

Resources 2017. The Draft report will contain minimal grammatical or typological errors and should require minimal editing.

The Draft Report will be submitted in a timely fashion in accordance to the contract. One complete copy of a draft inventory report presenting results, including appropriate maps, tables, photographs, sketches, and a final copy of electronic GIS site data shall be submitted for BLM review.

The Final Report (Task V) is considered the final deliverable and will be a finished product. Deliverables will be submitted electronically, via a FTP site or mailed drives.

Other Evaluation Criteria:

1. The contractor represents the BLM and will conduct operations in a professional manor.

Littering, damaging property, causing resource damage or any violation of the law in the execution of this contract will not be tolerated. Conflicts with other stakeholders should be brought to the COR’s attention as soon as possible.

2. Continued communication and open discussion with COR or PI are strongly encouraged. Site visits with the COR or PI are encouraged.

3. Safety of the contractor’s or other stakeholder’s personnel is extremely important. The UCRD has extreme terrain and weather. None of these surveys are worth getting anyone hurt. Unsafe working conditions will be brought to the COR/PI’s attention immediately and hazard reduction/mitigation strategies will be implemented.

File details come from the government source that posted it. Updated .