SOW- Electrical Stations MOCP 07022021jd (1).docx
DOCX document 2 MB Posted
- Attached to
- Transformers and Electrical Posts - MOC-P Federal contract opportunity
- Solicitation number
- NMAN0000-22-00059
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination OR202100080.pdf | ||
| Construction Template FAC 2022-01.docx | DOCX document | |
| Equivalent Rate 113R-09Sep2021.pdf | ||
| Images with notes Electrical posts.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
STATEMENT OF WORK
INSTALLATION OF POWER STATIONS IN PARKING LOT
NM-AN0000-22-00059
1. BACKGROUND:
1.1. The National Oceanic and Atmospheric Administration (NOAA) operates a wide assortment of hydrographic survey, oceanographic research and fisheries survey vessels. These vessels are operated by NOAA's Office of Marine and Aviation Operations. Ships located in the Atlantic are managed by the Marine Operations Center-Atlantic (MOC-A) in Norfolk, Virginia. Ships located in the Pacific are managed by the Marine Operations Center-Pacific (MOC-P) in Newport, Oregon. Ships located in Hawaii are managed by the Marine Operations Center-Pacific Islands (MOC-PI). The ships are run by a combination of NOAA commissioned officers and civilian professional mariners. The civilian mariners include licensed masters, mates and engineers, and unlicensed members of the engine, steward and deck departments. In addition, survey and electronic technicians operate and/or maintain the ship's mission, communication and navigation equipment. The ship's officers and crew provide mission support and assistance to embarked scientists from various NOAA laboratories as well as the academic community.
2. OVERVIEW:
2.1. At our NOAA Newport, OR MOC-P location we want to install 6 power stations in the laydown area parking lot and add 220 outlets outside the generator room in support of the small boat program.
3. TECHNICAL SPECIFICATIONS:
3.1. 3.1. The items below are some general specifications that are required for the installation to meet or be equivalent to.
3.1.1. Power Supply: A new power supply needs to be installed which includes a breaker in 1000 watt panel, transformer from 480 volt to 208/120 vac 3 phase 75 KVA to be mounted above the current transformer. This transformer will feed a Panel board interior 225amp 120/208vac 30amp circuit.
3.1.1.1. Under 100 watt panel, drill a hole into the cinder block for conduit.
3.1.2. Power Stations/Stanchions : The six power stations need an RV-style connection box mounted on individual stanchions mounted on a concrete footing. The boxes and stanchions need to be weather resistant and made of stainless steel grade which only allow minimal surface rust.
3.1.2.1. Each box needs a (1)125 volt 50 amp plug, (1) 125 volt 30 Amp plug and (1) Single gang GFI plug.
3.1.2.1.1. 20/30/50 amp Midwest Parkmate Stainless Steel
3.1.2.1.2. Midwest Parkmate Stainless Steel post mount RV pedestal with composite head.
3.1.2.2. All exterior wiring needs to be buried to each stanchion and feed up through the center.
3.1.2.3. The locations of stanchions need to be setback from curb to prevent vehicles from hitting them and may include installing parking bollards.
3.1.2.3.1. The bollards are made of steel, filled with concrete, painted yellow and mounted to a concrete footing. STATEMENT OF WORK NM-AN2120-21-XXXX 3
3.1.3. 220 Plugs: There needs to be (2) 220 volt 50 amp plugs mounted on the exterior of the west side of the generator room and each plug of two most common plugs styles to support welding operations.
4. Site visit available for measurements
4.1. NOAA facility has access controls in place to prevent the spread of the COVID-19 virus including but not limited to conducting a medical screening with a designated point of contact beginning 4 days prior to requiring access to the facility. Face masks are required at all times on the NOAA facility. 6ft social distancing is required to be maintained whenever possible.
4.2. The contractor may be restricted from accessing the facility without notice, the contractor will not be held responsible for delays to work resulting from NOAA access restrictions.
5. DELIVERABLE SCHEDULE:
5.1. All work must be completed within 120 days of award.
6. PLACE OF PERFORMANCE or DELIVERY ADDRESS:
6.1. 2002 SE Marine Science Drive, Newport OR 97365
7. SPECIAL CONSIDERATIONS:
7.1. Permit requirements for the City of Newport
8. TECHNICAL POINT OF CONTACT:
Name: Lisa Evans Title: Supply Technician Marine Operations Center - Pacific 2002 SE Marine Science Drive Newport, Oregon 97365 Office: 541-867-8736 image1.png
File details come from the government source that posted it. Updated .