SOW.pdf

PDF 959 KB Posted

Attached to
Rigid Hull Inflatable Boats Federal contract opportunity
Solicitation number
N3225320Q0039
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document outlines a federal contract opportunity for Rigid Hull Inflatable Boats (RHIBs) maintenance services. Pearl Harbor Naval Shipyard seeks a qualified contractor to service RHIBs in accordance with provided specifications, with work taking place at the contractor's facility in Hawaii. Interested small businesses must have their own dry docking capabilities, and demonstrate technical expertise to complete the scope of work registered in SAM. Capability statements are due by April 8th for evaluation, with the actual solicitation to be posted for 10 days thereafter.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

HRMC (NMD)

USS MICHAEL MURPHY (DDG 112)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: HRMC-028-20

INCLUDES ALL CHANGES THROUGH 3/21/2020

DRAFT

INDEX

SHIP: USS MICHAEL MURPHY (DDG 112) HRMC-028-20

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-21 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 10/01/2019 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original

009-03 Toxic and Hazardous Substance; control 10/01/2019 Original

009-04 Quality Management System; provide 10/01/2019 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

08/31/2018 Original

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish

07/24/2019 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original

009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original

009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original

009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original

009-20 Government Property; control 10/01/2017 Original

009-21 Logistics and Technical Data; provide 10/01/2018 Original

009-23 Interference; remove and install 10/01/2018 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;

accomplish

10/01/2019 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

10/01/2018 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

10/01/2019 Original

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

01/14/2020 CH-1

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original

009-67 Integrated Total Ship Testing; manage 04/30/2018 Original

009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

10/01/2019 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

10/01/2018 Original

009-74 Occupational, Safety and Health Plan; accomplish 01/14/2020 CH-1

009-80 Ship Facilities; maintain 11/18/2016 Original

009-81 Compartment Closeout; accomplish 10/01/2019 Original

009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original

009-84 Threaded Fastener Requirements; accomplish 10/01/2018 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

03/06/2018 Original

009-99 Ship Departure Report; provide 07/18/2014 Original

009-100 Ship's Stability; maintain 03/06/2018 Original

ITEM_NO. TITLE CHANGE DATE CHANGE

009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

04/30/2018 Original

009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original

009-118 CG Deck Loading; accomplish 07/18/2014 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original

009-122 Temporary Padeye; install and remove 10/01/2018 Original

CHANGE DATETITLEITEM NO.

CATEGORY II. FY-21 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

CHANGE

009-32 Cleaning and Painting Requirements; accomplish 04/09/2019 Original

ITEM NO. TITLE

Hazardous Waste Produced on Naval Vessels; control077-11-001

Transfer of Boat Custody; accomplish583-31-001

Main Propulsion Diesel Engine (MPDE); repair583-31-002

Rigid Inflatable Boat (RIB); preserve583-31-003

Rigid Inflatable Boat (RIB) Alterations; accomplish583-31-004

Miscellaneous Components; replace583-31-005

SHIP: USS MICHAEL MURPHY (DDG 112) ITEM NO: 077-11-001

COAR: 16 PCN: OD01-L437

OD01-L443

CMP: NONE

PLANNER: UEHARA, CHRISTOPHER

SSP: HRMC-028-20 1 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification

SHIP: USS MICHAEL MURPHY (DDG 112)

SSP: HRMC-028-20 2 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, SSP: HRMC-028-20 3 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

Sodium Hydroxide _____ ____________ __________

Cleaning Solvents _____ ____________ __________

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ ____________ __________

(contaminated with a known hazardous waste)

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Rust Preventative)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic) _____ ____________ __________

Paints (Enamel, Latex, _____ ____________ __________

Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)

Paints (May include lead, _____ ____________ __________ cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ __________ lead, chromium)

Sludges (Contaminated with _____ ____________ __ a known hazardous waste)

Wool Felt (contaminated _____ ____________ __________

SSP: HRMC-028-20 4 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

with chromium and PCB's)

Lube/Fuel Oil Soaked Rags _____ ____________ __________

Paint/Flakes (Pressure Washing _____ ____________ __________

Ext Hull Surfaces)

Fuel Oil(Residual) _____ ____________ __________

Bilge Water _____ ____________ __________

Oil/Water _____ ____________ __________

AFFF/Water _____ ____________ __________

MEK Contaminated Rags _____ ____________ __________

3.5.1 Provide zero dollars for managing and disposing of all

hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.

3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They

SSP: HRMC-028-20 5 of 5 ITEM NO: 077-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: USS MICHAEL MURPHY (DDG 112) ITEM NO: 583-31-001

COAR: 28 PCN: OD01-L436

OD01-L442

CMP: NONE

PLANNER: LUCERO, CHRIS

SSP: HRMC-028-20 1 of 2 ITEM NO: 583-31-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Transfer of Boat Custody; accomplish

1.2 Location of Work:

1.2.1 Contractor's Facility

1.3 Identification:

1.3.1 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080047, Hull Identification Number:

7MRB0805

1.3.2 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080046, Hull Identification Number:

7MRB0806

2. REFERENCES:

2.1 Attachment (A), Boat Custody Form

3. REQUIREMENTS:

3.1 The Contractor shall pick up and deliver crafts via trailers to contractor facility.

3.1.1 The Contractor shall pick up the crafts identified in 1.3.1 and 1.3.2 within 72 hours after the awarding of contract.

3.1.2 The GOVERNMENT will provide trailer for crafts transport and contractor shall place boats on jack stands and keel blocks upon receipt of crafts at which time trailers shall be turned over to the

GOVERNMENT.

3.1.3 The Contractor shall be responsible for each vessel from the time of receipt, till the delivery of the vessels to the GOVERNMENT.

3.1.4 Prior to sea trials, the GOVERNMENT will provide trailers for transport.

3.1.5 The Contractor shall inspect each trailer to ensure all load bearing surfaces, bunks and/or any areas which may contact each craft for fairness, protrusions and any irregularities which may scratch or mar newly repaired areas.

Report: KTR received custody of 7MRB907 and 7MRB908 (AC) -

AVAILABILITY

COMPLETION 0

days

3.2 Upon receiving custody of the vessels listed in 1.3 from the activity, complete Part A of 2.1. Submit one copy, in approved transferrable media to the SUPERVISOR, within 24 hours after receiving the vessels.

SSP: HRMC-028-20 2 of 2 ITEM NO: 583-31-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Report: KTR transferred custody of 7MRB907 and 7MRB908 to Pearl Harbor engine shop.

(AC) -

AVAILABILITY

COMPLETION 0

days

3.3 After returning custody of the vessels listed in 1.3 to the activity, complete Part B of 2.1. Submit one copy, in approved transferrable media to the SUPERVISOR, within 24 hours after delivery of the vessels.

3.3.1 The Contractor shall be responsible for delivery to and from boat launch, for all necessary sea trials to prove all work has been completed in accordance with the requirements of each Work Item within the availability.

3.3.2 Upon completion of crafts and satisfactory sea trials, the Contractor shall provide services and materials to shrink wrap each craft identified in 1.3.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SHIP: USS MICHAEL MURPHY (DDG 112) ITEM NO: 583-31-002

COAR: 16 PCN: OD01-L447

OD01-L441

CMP: NONE

PLANNER: UEHARA, CHRISTOPHER

SSP: HRMC-028-20 1 of 4 ITEM NO: 583-31-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Main Propulsion Diesel Engine (MPDE); repair

1.2 Location of Work:

1.2.1 Engine Bay

1.3 Identification:

1.3.1 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080047, Hull Identification Number:

7MRB0805

1.3.2 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080046, Hull Identification Number:

7MRB0806

2. REFERENCES:

2.1 Standard Items, (FY-21)

2.2 S9008-HM-BIB-010, Boat Information Book (BIB) for 7-Meter Rigid Inflatable Boat (RIB) Hulls 7MRB0801 thru 7MRB0824.

2.3 7MRB-1841 Rev C, Drawing Index

2.4 7MRB-1842 Rev A, Outboard Profile Arrangement

2.5 7MRB-1843 Rev B, Inboard Arrangement

2.6 7MRB-1844 Rev B, Miscellaneous Construction

2.7 7MRB-1845 Rev A, Machinery and Steering

2.8 7MRB-1846 Rev B, Piping System

2.9 7MRB-1847 Rev C, Electrical Systems

2.10 7MRB-1848 Rev B, Hoisting Arrangement

2.11 301-5107573 Rev C, Man Overboard Indicator (MOBI) Installation, (GEN/47B)

2.12 583-5108341, Fuel Return Valve Locking Device, (GEN/52A)

2.13 180-5109418, QSB Series Engines Starter Magnetic Switch Mounting Bracket, (GEN/55A)

2.14 602-5109421 Rev A, Boat Contact Information label Plate, (GEN/56C)

2.15 256-5110970 Rev A, Replace Coolant Inline Heaters with Block Heaters on Cummins engines, (GEN/65C)

2.16 Gen/66B Boat Alt Document PDF, QSB 5.9 Engines Coolant Level Sensor Removal, (GEN/66B)

2.17 529-5108646 Rev A, Bilge Pump Replacement/Relocate, (7MRB/33C)

2.18 320-5109472 Rev A, Power Distribution System Electrical Upgrade, SSP: HRMC-028-20 2 of 4 ITEM NO: 583-31-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

(7MRB/37B)

2.19 520-5110118 Rev C, Cummins QSB Engine Seawater Pump Replacement, (7MRB/40B)

3. REQUIREMENTS:

3.1 Accomplish the following repairs to each craft identified in 1.3.1 and 1.3.2 using 2.2 through 2.10 for guidance

3.1.1 Provide services and material to accomplish, remove and reinstall MPDE assemblies, Soda Blast and preservation of each MPDE assembly. Ensure that blast media does not enter or damage any sensitive engine components such as, starter, alternator, pulley bearings, wiring, electronic equipment, and internal engine components. Prime/paint engines white. Do NOT paint hoses or paint/deface data plates.

3.1.2 Provide services and material to accomplish paint/preservation to (4 EA/craft) motor mounts and (4 EA/craft) motor mount engine brackets.

(V)(G) "VISUAL INSPECTION AND PRESSURE TEST"

3.1.3 Remove existing, clean, inspect, pressure test, reseal using new gaskets/seals, and reinstall, each engine after cooler, and each engine heat exchanger.

3.1.3.1 Submit one legible copy, in approved transferrable

media, of a report listing the results of 3.1.3 to the SUPERVISOR within 24 hours of completion of test.

3.1.4 Drain existing and replenish with new, each MPDE lube oil and fresh water coolant in its entirety.

3.1.5 Remove existing and install new, each MPDE lube oil filter, fuel filter and RACOR fuel filter element.

3.1.6 Remove, prepare and paint each RACOR fuel filter housing.

3.1.7 Remove existing and install new, each engine flywheel

dampener/coupling plate (located in the MPDE bell housing).

3.1.8 Remove existing and install new, each MPDE electrical harness assemblies and each vessel harness assembly from MPDE to vessel “J” box

3.1.9 Remove existing and install new, each electric fuel prime pump (lift pump).

3.1.10 Remove existing and install new, (3 each/craft) fresh water cooling hoses and SS clamps.

3.1.11 Remove existing and install new, (2 each/craft) MPDE drive belts.

3.1.12 Remove existing and install new, each raw water hose from sea cock to sea water strainer using new T-bolt SS double clamps at each connection.

3.1.13 Remove existing and install new, engine air filter for each

SSP: HRMC-028-20 3 of 4 ITEM NO: 583-31-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

craft.

3.1.14 Remove existing and install new, (7 each/craft) high pressure fuel lines.

(Q)(G) "DYNO TEST"

3.1.15 Provide services to DYNO test each engine before

reinstallation into craft using 009-90 tech rep to verify proper operation, reinstall each MPDE upon SAT dyno test.

3.1.15.1 Submit one legible copy, in approved transferrable

media, of a report listing the results of 3.1.15 to the SUPERVISOR within 24 hours of completion of test.

3.1.15.2 MPDE shall be aligned upon installation onboard each craft.

3.1.15.3 All engine fluids shall be filled/topped off upon

installation.

3.2 Accomplish the following Main Propulsion Diesel Engine (MPDE) repairs to the craft identified in 1.3.2, in area 1.2, using 2.2 through

2.10 for guidance.

3.2.1 Remove existing and install new, the Mercury Bravo 2 Outdrive assembly including the complete Mercury Transom assembly.

3.2.2 Remove existing and install new, the console Starboard side hand rail assembly.

3.2.3 Procure and install Coxswains Backrest Assembly.

(V)(G) "OPERATIONAL TEST"

3.3 Perform a bay trial/operational test to each craft identified in

1.3.1 and 1.3.2 to prove each component repaired or installed throughout this work availability are up to OEM standards and in accordance with 2.2 through 2.19

3.3.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.3 to the SUPERVISOR within 24 hours of completion of test.

3.3.2 Install 20 Gal of diesel fuel for each craft identified in

1.3.1 and 1.3.2.

3.3.3 Submit one legible copy, in approved transferrable media, with recommended repairs of any hull, mechanical, electrical, and any accessory discrepancy found during the performance of 3.2 to the SUPERVISOR within 24 hours of completion of testing.

3.3.4 Upon completion of a satisfactory bay trials, wash engine and entire craft with soap and water, fresh water flush engine raw water cooling system and clean entire bilge areas.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

SSP: HRMC-028-20 4 of 4 ITEM NO: 583-31-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SHIP: USS MICHAEL MURPHY (DDG 112) ITEM NO: 583-31-003

COAR: 16 PCN: OD01-L440

OD01-L446

CMP: NONE

PLANNER: UEHARA, CHRISTOPHER

SSP: HRMC-028-20 1 of 4 ITEM NO: 583-31-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Rigid Inflatable Boat (RIB); preserve

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080047, Hull Identification Number:

7MRB0805

1.3.2 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080046, Hull Identification Number:

7MRB0806

2. REFERENCES:

2.1 Standard Items, (FY-21)

2.2 S9086-TX-STM-010, Naval Ships' Technical Manual Chapter 583, Volume 1, Boats and Small Craft

2.3 S9086-VD-STM-010 Rev 3, Naval Ships' Technical Manual Chapter 631, Preservation of Ships in Service - General

2.4 T9008-B4-MAN-010, Inspection and Repair Manual for Fiber Reinforced Plastic Boats and Craft

2.5 Liaison Action Record (LAR): GEN-1504, Alternative Paint Option for Navy Boats

2.6 Systems and Specifications, SSPC Painting Manual, Volume 2

3. REQUIREMENTS:

3.1 Accomplish the following preservation for each craft identified in

1.3.1 and 1.3.2.

3.2 Record the existing periphery lines, exact locations, painted stenciling, and colors and dimensions of painted coatings, and non-skid deck covering on each exterior surface from keel to the top of the console for each craft.

3.3 Shroud the entire DRYBERTH areas to contain debris and airborne contaminants generated by surface preparation and painting for each craft.

3.4 Accomplish the preservation to hull exterior above and below waterline, deck surfaces, console exterior, transom, aft storage box and all other gel coated surfaces not receiving non-skid deck covering for painting, in accordance with 2.2 through 2.5.

3.4.1 Colors shall be in accordance with recorded scheme listed in 3.2.

SSP: HRMC-028-20 2 of 4 ITEM NO: 583-31-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.4.2 Clean, recondition, restore/re-stencil all aluminum placards in its entirety for each craft. Lettering shall be legible.

3.4.2.1 Prepare transom hull number location to ensure there are no cracks prior painting.

3.4.3 Accomplish degreasing/cleaning prior to surface preparation.

(V)(G) "CLEANLINESS"

3.4.3.1 Ensure that the surface is free of contaminants in

accordance with SSPC-SP 1 of 2.6 for the craft identified in 1.3.1.

(V)(G) "CLEANLINESS"

3.4.3.2 Ensure that the surface is free of contaminants in

accordance with SSPC-SP 1 of 2.6 for the craft identified in 1.3.2.

3.4.4 Surface preparation shall be accomplished by using high pressure wash to remove marine growth and loose light paint or touch-up, in accordance with 2.3, paragraph 631-5.2.6, or to ensure all surfaces to be painted are properly prepared, achieve a minimum of 95 % surface abrasion using a minimum of 320 grit sandpaper.

(V)(G) "SURFACE PREPARATION"

3.4.4.1 Verify surface preparation for the coating systems used in accordance with the manufacturer's instruction identified in

2.5 for the craft identified in 1.3.1.

(V)(G) "SURFACE PREPARATION"

3.4.4.2 Verify surface preparation for the coating systems used in accordance with the manufacturer's instruction identified in

2.5 for the craft identified in 1.3.2.

(V)(G) "PRELIMINARY HULL/STRUCTURAL INSPECTION PRIOR TO PAINTING"

3.4.5 Accomplish a preliminary hull & structural inspection prior to painting and after surface preparation of areas listed in 3.4 for structural integrity, deterioration, pitting, cracks, areas of damage or distortion and surface blemishes for the craft identified in 1.3.1.

3.4.5.1 Submit a report in approved transferrable media, listing type, extent and locations of defects found in 3.4.5 to the

SUPERVISOR.

3.4.5.2 Accomplish a total of 15 square foot of fiberglass

repairs located at the hull, deck, console, console access doors and aft storage box using the report submitted in 3.4.5.1 for guidance and in accordance with 2.4 for the craft identified in

SSP: HRMC-028-20 3 of 4 ITEM NO: 583-31-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1.3.1.

(V)(G) "PRELIMINARY HULL/STRUCTURAL INSPECTION PRIOR TO PAINTING"

3.4.6 Accomplish a preliminary hull & structural inspection prior to painting and after surface preparation of areas listed in 3.4 for structural integrity, deterioration, pitting, cracks, areas of damage or distortion and surface blemishes for the craft identified in 1.3.2.

3.4.6.1 Submit a report in approved transferrable media, listing type, extent and locations of defects found in 3.4.6 to the

SUPERVISOR.

3.4.6.2 Accomplish a total of 15 square foot of fiberglass

repairs located at the hull, deck, console, console access doors and aft storage box using the report submitted in 3.4.6.1 for guidance and in accordance with 2.4 for the craft identified in 1.3.2.

(V)(G) "COATING INSPECTION FOR EACH COAT (CONSISTS OF COATING THICKNESS,

HOLIDAYS, AND CLEANLINESS)"

3.4.7 Accomplish WFT / DFT measurements of each paint coat applied.

A gage shall be used to verify the application of proper paint thickness for each paint coat in accordance with 2.5 for the craft identified in 1.3.1.

(V)(G) "COATING INSPECTION FOR EACH COAT (CONSISTS OF COATING THICKNESS,

HOLIDAYS, AND CLEANLINESS)"

3.4.8 Accomplish WFT / DFT measurements of each paint coat applied.

A gage shall be used to verify the application of proper paint thickness for each paint coat in accordance with 2.5 for the craft identified in 1.3.2.

(V)(G) "FINAL HULL/STRUCTURAL INSPECTION AFTER PAINTING"

3.4.9 Accomplish a final preservation and structural inspection upon preservation completion. Paint application shall be like-new finish, contains a high uniform gloss, with no signs of holidays, runs, sags, chips, swirls, surface defects, orange peel texture, and or surface contaminants present for the craft identified in 1.3.1.

(V)(G) "FINAL HULL/STRUCTURAL INSPECTION AFTER PAINTING"

3.4.10 Accomplish a final preservation and structural inspection upon preservation completion. Paint application shall be like-new finish, contains a high uniform gloss, with no signs of holidays, runs, sags, chips, swirls, surface defects, orange peel texture, and or surface contaminants present for the craft identified in 1.3.2.

3.5 Remove existing and install new in its entirety, each non-skid deck

SSP: HRMC-028-20 4 of 4 ITEM NO: 583-31-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

covering and apply Safety Walk edge sealing compound, in accordance with

2.2 and 2.3.

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SHIP: USS MICHAEL MURPHY (DDG 112) ITEM NO: 583-31-004

COAR: 16 PCN: OD01-L444

OD01-L438

CMP: NONE

PLANNER: UEHARA, CHRISTOPHER

SSP: HRMC-028-20 1 of 3 ITEM NO: 583-31-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Rigid Inflatable Boat (RIB) Alterations; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080047, Hull Identification Number:

7MRB0805

1.3.2 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080046, Hull Identification Number:

7MRB0806

2. REFERENCES:

2.1 Standard Items, (FY-21)

2.2 S9008-HM-BIB-010, Boat Information Book (BIB) for 7-Meter Rigid Inflatable Boat (RIB), Hulls 7MRB0801 thru 7MRB0824

2.3 7MRB-1841 Rev C, Drawing Index

2.4 7MRB-1842 Rev A, Outboard Profile Arrangement

2.5 7MRB-1843 Rev B, Inboard Arrangement

2.6 7MRB-1844 Rev B, Miscellaneous Construction

2.7 7MRB-1845 Rev A, Machinery and Steering

2.8 7MRB-1846 Rev B, Piping System

2.9 7MRB-1847 Rev C, Electrical Systems

2.10 7MRB-1848 Rev B, Hoisting Arrangement

2.11 301-5107573 Rev C, Man Overboard Indicator (MOBI) Installation, (GEN/47B)

2.12 583-5108341, Fuel Return Valve Locking Device, (GEN/52A)

2.13 180-5109418, QSB Series Engines Starter Magnetic Switch Mounting Bracket, (GEN/55A)

2.14 602-5109421 Rev A, Boat Contact Information label Plate, (GEN/56C)

2.15 256-5110970 Rev A, Replace Coolant Inline Heaters with Block Heaters on Cummins engines, (GEN/65C)

2.16 Gen/66B Boat Alt Document PDF, Gen/66B Boat Alt Document PDF, QSB

5.9 Engines Coolant Level Sensor Removal, (GEN/66B)

2.17 529-5108646 Rev A, Bilge Pump Replacement/Relocate, (7MRB/33C)

2.18 320-5109472 Rev A, Power Distribution System Electrical Upgrade, SSP: HRMC-028-20 2 of 3 ITEM NO: 583-31-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

(7MRB/37B)

2.19 520-5110118 Rev C, Cummins QSB Engine Seawater Pump Replacement, (7MRB/40B)

2.20 180-5110620 Rev A, Engine Mount Replacement (7MRB/44B)

2.21 Fuel System Modifications, Lubricity System Removal (7MRB/45B Document)

2.22 261-5110784, Lubricity System Removal

2.23 320-5111088 Rev A, Shore Power Warning Label Plate Fabrication

(7MRB/49C)

2.24 342-5111310 Rev A, Smartcraft System Display Upgrade (7MRB/51C)

2.25 441-5111497 Rev A, Tactical Radio Outlet Installation, (7MRB/52C)

2.26 303-5111514, Bilge Pump System Power Modification, (7MRB/53A)

2.27 7MRB/58A PDF, Hoisting Condition Warning Label Plate (7MRB/58A)

2.28 422-5112200, Navigation Lighting Upgrade, (7MRB/64C)

2.29 Safe Boat Operations Placard, (7MRB/66A PDF Document)

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION & OPERATIONAL TEST"

3.1 Accomplish visual inspection on structural/hull, mechanical, and electrical components and operational testing to crafts identified in

1.3.1 and 1.3.2, in area 1.2, using 2.2 through 2.10 for guidance.

3.1.1 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR within 24 hours of completion of test and inspection.

3.2 Accomplish the requirements of Boat Alteration GEN/47B on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.11.

3.3 Accomplish the requirements of Boat Alteration GEN/52A on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.12.

3.4 Accomplish the requirements of Boat Alteration GEN/55A on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.13.

3.5 Accomplish the requirements of Boat Alteration GEN/56C on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.14.

3.6 Accomplish the requirements of Boat Alteration GEN/65C on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.15.

3.7 Accomplish the requirements of Boat Alteration GEN/66B on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.16.

3.8 Accomplish the requirements of Boat Alteration 7MRB/33C on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.17.

3.9 Accomplish the requirements of Boat Alteration 7MRB/37B on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.18.

3.10 Accomplish the requirements of Boat Alteration 7MRB/40B on crafts

SSP: HRMC-028-20 3 of 3 ITEM NO: 583-31-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

identified in 1.3.1 and 1.3.2, in accordance with 2.19.

3.11 Accomplish the requirements of Boat Alteration 7MRB/44B on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.20.

3.12 Accomplish the requirements of Boat Alteration 7MRB/45B on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.21 and 2.22.

3.13 Accomplish the requirements of Boat Alteration 7MRB/49C on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.23.

3.14 Accomplish the requirements of Boat Alteration 7MRB/51C on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.24.

3.15 Accomplish the requirements of Boat Alteration 7MRB/52C on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.25.

3.16 Accomplish the requirements of Boat Alteration 7MRB/53A on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.26.

3.17 Accomplish the requirements of Boat Alteration 7MRB/58A on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.27.

3.18 Accomplish the requirements of Boat Alteration 7MRB/64C on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.28.

3.19 Accomplish the requirements of Boat Alteration 7MRB/66A on crafts identified in 1.3.1 and 1.3.2, in accordance with 2.29.

3.20 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SHIP: USS MICHAEL MURPHY (DDG 112) ITEM NO: 583-31-005

COAR: 16 PCN: OD01-L439

OD01-L445

CMP: NONE

PLANNER: UEHARA, CHRISTOPHER

SSP: HRMC-028-20 1 of 3 ITEM NO: 583-31-005

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Miscellaneous Components; replace

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080047, Hull Identification Number:

7MRB0805

1.3.2 Quantity (One EA), 7 Meter Rigid Inflatable Boat (RIB), Mfr.

Willard Marine Inc., APL: 72A080046, Hull Identification Number:

7MRB0806

2. REFERENCES:

2.1 Standard Items, (FY-21)

2.2 S9008-HX-BIB-010, 7-Meter Rigid Inflatable Boat (RIB) Hulls 7MRB0801 Thru 7MRB0824

2.3 7MRB-1841 Rev C, Drawing Index

2.4 7MRB-1842 Rev A, Outboard Profile Arrangement

2.5 7MRB-1843 Rev B, Inboard Arrangement

2.6 7MRB-1844 Rev B, Miscellaneous Construction

2.7 7MRB-1845 Rev A, Machinery and Steering

2.8 7MRB-1846 Rev B, Piping System

2.9 7MRB-1847 Rev C, Electrical Systems

2.10 7MRB-1848 Rev B, Hoisting Arrangement

3. REQUIREMENTS:

3.1 Accomplish the following repairs to each craft identified in 1.3, in area 1.2, using 2.2 through 2.10 for guidance.

3.1.1 Remove existing and install new in its entirety, (1

each/craft) drive shaft assembly, paint each driveshaft color black.

3.1.1.1 Paint with 1” white lettering on the driveshaft to read

“NO STEP”

3.1.1.2 Paint driveshaft containment Hoops black, fore and aft hoops.

3.1.1.3 Reinstall drive shaft assemblies with the “slip-yoke” facing AFT

3.1.2 Remove existing and install new in its entirety, each forward support bearing assembly and aft driveshaft support bearings

SSP: HRMC-028-20 2 of 3 ITEM NO: 583-31-005

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

assembly.

3.1.3 Remove existing and replace with new, (1 each/craft) fuel stripper pump assembly.

3.1.4 Provide with new and install, (1 each/craft) fuel stripper pump valve handle

3.1.5 Remove existing and replace with new, (1 each/craft) FLOCS pump assembly.

3.1.6 Remove existing and install new, trim pump assembly complete with solenoids and mounting bracket for each craft.

3.1.7 Remove existing and install new, (2 each/craft) Optima Blue Top Marine batteries P/N 8016-103.

3.1.8 Remove existing and install new, (2 each/craft) 5LB fire extinguishers.

3.1.9 Remove existing and install new, each steering wheel assembly.

3.1.10 Provide with new and install the missing Helm Throttle/Shift lever position indicator placard for each craft.

3.1.11 Remove existing and replace with new, each aft deck scupper “elephant trunks” (2 each/craft).

3.1.12 Provide services and material to re-upholster each storage box seat, each console seat and each coxswain backrest cushions, color shall be lite gray and attach using new snaps for each craft.

3.1.13 Remove existing calking and reseal the transom/deck

connection areas in its entirety.

3.1.14 Remove existing and install new, (4 each/craft) securing latches, console/deck and stowage box/transom.

3.1.15 Remove existing and install new, (4 each/craft) rubber securing latches, console seat and stowage box lid.

3.1.16 Remove existing and install new, (2 each/craft) aft storage box to deck hinge assemblies.

3.1.17 Remove existing and install new, (4 EA/craft) console

electrical connector assemblies for the each, blue light, siren speaker, search light and stern light.

3.1.18 Remove existing and install new, each shore power panel “battery charger” and “Engine Coolant PreHeater” breakers.

3.1.19 Remove existing and install new, each shore panel polarity indicators (1 red, 1 green, each craft).

3.1.20 Remove existing and install new, (4 each/craft) Main

Breakers. (“trim” -100 amp, 12V panel -70 amp, 24V panel -30 amp, and cummins DC converter -7.5amp.).

3.1.21 Remove existing and install new, each Standard Horizons VHF radio model GX2200 radio assemblies.

3.1.21.1 Fill/glass VHF radio mounting opening to fit new units.

3.1.22 Remove existing and install new, each VHF radio antennae and

SSP: HRMC-028-20 3 of 3 ITEM NO: 583-31-005

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

antennae mounting hardware.

3.1.23 Remove existing and install new, ignition switch (start, run, off) for each craft.

3.1.24 Remove existing and install new, dimmer switch located on the “Start” panel.

3.1.25 Remove existing and install new, each navigation Compass assembly.

3.1.26 Provide and install hand held spot for each craft.

3.1.27 Remove existing and install new, (6 each/craft) securing pins and lanyards.

3.1.28 Remove existing and install new in its entirety, (1 EA/craft) outdrive trim pump assembly and pump to transom trim hoses.

3.1.29 Remove existing and install new, (2 EA/craft) shift cable assemblies, adjust cables to OEM specifications.

3.1.30 Remove existing and install new, (1 EA/craft) double wire locking securing pins with lanyards for the stern light post.

3.1.31 Remove existing, and install new in its entirety, each hatch/access door seals (6 each craft).

3.1.32 Provide services and material to inspect each fuel tank assembly for corrosion/leaks. Report findings to supervisor.

3.2 Accomplish an operational test of all newly installed and disturbed equipment, using manufacturer's instructions, to ensure that equipment functions properly with optimum performance.

3.2.1 Submit one report, in approved transferrable media, listing the results of the requirements of 3.2 to the SUPERVISOR.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

File details come from the government source that posted it. Updated .