SOW.pdf

PDF 475 KB Posted

Attached to
Precision Filters Conditioners and Cables Federal contract opportunity
Solicitation number
80NSSC25913552Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This Statement of Work (SOW) details NASA Armstrong Flight Loads Lab's procurement requirements for precision testing equipment. The agency requires 3 HP4F/LP4FP Quad Charge/IEPE Conditioners with 8-Pole Bandpass Filters, capable of programmable high-pass and low-pass filtering across frequencies ranging from 1 Hz to 204.6 kHz, 8 input cables (4-foot, Combo D to BNC Male), and 2 output cables (4-foot, DD50P to 16-Channel BNC Male). The equipment will support ground vibration testing using high-temperature accelerometers. Delivery is specified for 30-60 days after receipt of order (ARO) to NASA Armstrong Flight Research Center in Edwards, California.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

The Armstrong Flight Loads Lab requires the purchase of Precision Filters Conditioners and Cables to help perform ground vibration testing (GVT) using high-temp accels.

2. Characteristics, Scope, and Specs

Qty Description

28304-HP4F/LP4FP Quad Charge/IEPE Conditioner with 8-Pole Bandpass Filter.

High-Pass "Flat"" Filters, Programmable Fc from 2 Hz to 204.6 kHz. Low-Pass "Flat/Pulse" Filters, Programmable Fc from 1 Hz to 102.3 kHz, Pulse Mode, 2 Hz to

204.6 kHz, Flat Mode

CB-COMBOD-4BNCM-4 Input Cable. Combo D to 4 ea. BNC Male Connectors, 4-foot length. Used to Connect to 28304/28314/28324 Card Charge /IEPE Inputs

CB-DD50P/16BNCM-4 Output Cable. DD50P to 16-Channel BNC Male, 4-foot length.

Used for Quad Channel Card Outputs via 50-pin Output Connectors.

3. Place of Performance

NASA Armstrong Flight Research Center B-4876, WH 6, Lilly Ave Edwards, CA 93524

4. Period of Performance

30-60 days ARO

File details come from the government source that posted it. Updated .