This document outlines a statement of work and related federal contract opportunity notice. The statement of work calls for acquiring a turbomolecular pump with integrated converter/power supply to support experimentation in a high vacuum environment at NASA's Kennedy Space Center. The contractor must provide the specified turbomolecular pump model and accessories, install the pump on an existing vacuum chamber to achieve a minimum vacuum capability of 1x10^-5 Torr by May 31, 2024. The related sole source contract notice indicates NASA intends to award Leybold USA as the sole provider to acquire this commercial turbomolecular pump. Responses to compete this procurement were due by March 7, 2024.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements The objective of this purchase is to acquire a turbomolecular pump with integrated converter/power supply. The Lunar Electrostatic Discharge and Dust Mitigation (LEDM) tool calls out experimentation in high vacuum environment in a laboratory environment.
2. Characteristics, Scope, and Specs
The contractor shall perform the following duties:
Provide the selected turbomolecular pump 412200V0716 and all of its miscellaneous support accessories such as the main cable 411320V03.
Provide installation support for the turbomolecular pump onto the vacuum chamber currently existing in the Electrostatics and Surface Physics Laboratory located at NASA Kennedy Space Center.
Validate that the installed turbomolecular pump meets the minimum vacuum capability of E − 5 Torr listed in the KSC-PLN-2322_ESPL-ALC-001.
Complete installation in a timely manner to support LEDM tool development schedule, so installation must be completed before the end of Q2 of FY24.
3. Place of Performance NASA Kennedy Space Center, FL.
4. Period of Performance The period of performance shall be begin March 15, 2024 through May 31, 2024.