This document outlines a federal contract opportunity for water service line replacement in Sperry, Oklahoma. The Indian Health Service is seeking a firm, fixed price quote to furnish all labor, materials, equipment, transportation, and supervision necessary to replace an existing water service line in accordance with the attached statement of work and drawing. Quotes are due no later than February 23, 2024. The award will be made to the responsible, responsive offeror providing the lowest reasonable price quote that meets the technical specifications stipulated in the statement of work. The period of performance is 60 calendar days from notice to proceed. The solicitation is reserved for Indian-owned small businesses with a size standard of $45 million or less in accordance with NAICS code 237110.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ok30 (1).txt | TXT text file | |
| Bid Schedule.pdf | ||
| OEH-8 Proposed r1.pdf | ||
| SF18-95a Request for Quote.pdf | ||
| RFQ Construction Clauses-updated December 2023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Water Service Lines PVC Date: March 2017
Author: Ted Schlueter, P.E. Water Service Lines PVC
STATEMENT OF WORK
1.01 SUMMARY OF WORK TO BE DONE BY CONTRACTOR
A. Furnish and install a water service line as shown on the drawing.
1.02 SITE LOCATION
A. 11689 Park Farm Lane, Sperry, OK 74073
1.03 CONSTRUCTION SCHEDULE
A. Contact the Construction Inspector three business days before the start of any work.
B. Failure to perform work on the date scheduled will require 24-hour notice to rescheduling the work.
C. Leave all work exposed until inspected and approved. Work not inspected before it is covered will be re-exposed at the Contractor’s expense.
1.04 QUALITY ASSURANCE
A. Perform work under the direction of personnel licensed in the state including, but not limited to Plumbing.
1.05 WARRANTY
A. Provide a minimum one-year warranty for all materials and labor, covering defects in the materials or workmanship.
1.06 WATER SERVICE LINES (4-inch diameter and smaller)
A. PVC Pipe Material Requirements
1. Pipe shall be PVC 1120 pressure pipe made from class 12454 materials as defined by ASTM D-1784 with outside diameter dimensions of steel or cast iron pipe. The PVC compounds shall be suitable for potable water meeting NSF Standard No. 61.
PVC pipe shall be manufactured to meet the requirements of ASTM D2241. Use 20 foot pipe lengths. Joints are bell and spigot type.
a. Pressures less than or equal to 125 psi
1) Pipe: Use PVC Class 160 SDR 26 or Class 200 SDR 21 pipe.
2) Fittings: Use schedule 40 PVC (ASTM D-2466) or
Schedule 80 PVC (ASTM D-2467) fittings.
b. Pressures greater than 125 psi use pressure class of piping and fittings as shown on the bid sheet.
1.07 INSTALLATION
A. Install water service lines and appurtenances in the locations, sizes and materials shown on the drawings or staked in the field.
B. Water and sewer separation requirements.
Water Service Lines PVC Date: March 2017
Author: Ted Schlueter, P.E. Water Service Lines PVC
1. Maintain a minimum vertical separation between water service lines and sewer lines of 24 inches with the water service line placed above the sewer line.
Otherwise the water service line shall be constructed of ductile iron or placed within Steel Encasement Pipe for a 20-foot section centered at the crossing.
2. Maintain a minimum 10 foot separation between water service lines and sewer lines. Otherwise the water service line shall be constructed of ductile iron or placed within a Steel Encasement Pipe for the entirety of the length for which the minimum separation is not maintained.
C. Thrust blocking is to be provided at all changes in direction.
1.08 TRENCH
A. Depth: Minimum 30 inches.
B. Bottom: Free from stones greater than 1 inch, large dirt clods, and any frozen material.
C. Bedding: If the trench bottom is hardpan, rock, or has stones larger than 1 inch in diameter in the largest direction:
a. Over excavate 6 inches.
b. Place 6 inches of mechanically compacted imported bedding (maximum particle size 1 inch) under the pipe
c. Place pipe in trench.
d. Place 6 inches of mechanically compacted imported bedding (maximum particle size 1 inch) on the sides and above the pipe D. Backfill: restore trenches to initial grade.
1.09 TESTING
A. Before joints are covered, test pipe for leaks.
B. Visually inspect all connections and fittings for leaks in the presence of the
Construction Inspector.
C. Repair all leaks before backfilling.
1.10 DISINFECTION
A. Disinfect in accordance with AWWA C651 before placing in service.
1. Sample and test until 2 consecutive (minimum of 24 hours apart) negative Bac-T tests are obtained.
2. Provide a copy of the negative test to the Project Engineer.
1.11 CLOSEOUT ACTIVITIES
A. Restore the site as close as is practical to its original condition.
B. Provide record drawings to the Project Engineer.