SOW.pdf
PDF 199 KB Posted
- Attached to
- PORTABLE BACKPACK SPECTRORADIOMETER Federal contract opportunity
- Solicitation number
- 80NSSC238747
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FORMAT
Malvern Panalytical, ASD August 12, 2022
PR: 4200818747
Background
A Malvern Panalytical ASD 4HR NG backpack spectrometer will be used to carry out field measurements of leaf and canopy spectra. The measurements will support the calibration and validation, algorithm development, and modeling components of the NASA Surface Biology and Geology mission. These measurements will be carried out in field sites where other ecological measurements are currently being made, such as eddy covariance from flux towers.
Scope
Contractor shall provide one Malvern Panalytical ASD 4HR NG backpack spectrometer.
Requirements
The ASD shall match the following unit and accessories:
- 1 FieldSpec 4 HR NG
- RadCal 25 Deg FR Bare Fiber Optic
- Fore Optic Lens for FieldSpec 4 Hi-Res N
- Radiometric Calibration 6 Degree Full-ra
- Fore Optic Lens, 18 Degree Field-of-view
- RadCal 18 Degree Field-of-view Lens
- Remote Cosine Receptor, Full-sky
- RadCal Remote Cosine Receptor
- Contact Probe, Plant
- Leaf Clip Version 2
- Accessory Power Cable 1.5 meter
- Remote Trigger, 1.5 Meter
- NIR4006 Spare bulb for Contact Probe variants A122300 & A122317.
- Spectralon, 10X10-inch, Calibrated, 99%
- 10x10 Spectralon Plastic&Export Case Kit
- Near Infrared REMOTE Included App Training
- Integrating Sphere, RTC, 3ZC Reflectance
- Power Supply, Assembly, 12 VDC 70 Watt
- GPS, Positional Receiver, Bluetooth
- Battery, Aux NiMH High Current
- Battery Charger, NiMH
- Cable, NiMh Battery to Instrument
- Tripod, Medium-Duty, All-Purpose
- Instrument Controller
Deliverables or Delivery Schedule
Deliverables shall be 1 (one) ASD. The delivery shall be made in the fall of 2022. All standard manufacturer and/or vendor manuals and documentation shall be provided accompanying the hardware.
Place of Performance
Work to prepare, certify, package, and ship the ASD shall be completed at vendor/contractor facility.
Period of Performance
Performance period shall be ARO through shipment and follow-up to confirm items received in good order per standard contract closeout.
File details come from the government source that posted it. Updated .