SOW.pdf

PDF 284 KB Posted

Attached to
Services for the PACE Solar Array Panels Federal contract opportunity
Solicitation number
80NSSC238111
Issued by
National Aeronautics and Space Administration Shared Services Center

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI//SP-EXPT

Effective Date: October 18, 2022

Expiration Date: October 18, 2027

Check https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use

400-FORM-0002 (4/16/2014)

PACE- PWR-SOW-0097, Revision B Plankton, Aerosol, Cloud, ocean Ecosystem (PACE), Code 427

Services for the PACE Solar Array Panels Statement of Work

National Aeronautics and Space Administration

Goddard Space Flight Center Greenbelt, Maryland

GSFC PACE CMO

10/18/2022 Released

Services for the PACE Solar Array Panels SOW PACE-PWR-SOW-0097, Revision B ii

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

Services for the PACE Solar Array Panels Statement of Work Signature/Approval Page

Prepared By:

Melyane Ortiz-Acosta

Reviewed By:

Jennifer Ellefson Bradley Weidema Beth Weinstein Gary Davis

Approved By:

David Kim

Electronic Signatures available online at: https://ipdtdms.gsfc.nasa.gov/ iii

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

Preface

This document is under Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission signature-controlled document. Changes to this document require prior approval of the applicable Product Design Lead (PDL) or designee. Proposed changes shall be submitted in the PACE Technical Data Management System (TDMS) via a Signature Controlled Request (SCoRe), along with supportive material justifying the proposed change.

iv

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

Change History Log

Revision Effective

Date Description of Changes

(Reference the CCR & CCB/ERB Approval Date) Revision - 09/01/2022 Baseline Release following the approval of PACE-SCoRe-4298 Revision A 10/11/2022 Updated following the approval of PACE-SCoRe-4454 Revision B 10/18/2022 Updated following the approval of PACE-SCoRe-4477 v

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

Table of Contents

1.0 Introduction

1.1 General Information

1.2 Scope

2.0 description of tasks

2.1 TASK 1

2.1.1 Cleaning and Visual Inspection

2.2 Task 2

2.2.1 Cleaning and Visual Inspection

2.2.2 Repair

2.2.3 Spare Parts Storage

2.3 Task 3

2.3.1 Cleaning and Visual Inspection

2.3.2 Repair

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

1.0 INTRODUCTION

1.1 GENERAL INFORMATION

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that will extend the high-quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records.

PACE is classified as a Category 2 mission, per the criteria in NASA Procedural Requirement (NPR) 7120.5E, NASA Space Flight Program and Project Management Requirements. The mission classification is C according to NPR 8705.4B, Risk Classification for NASA Payloads.

This document defines the work to be performed by the Contractor in the design, development, fabrication, and delivery of the PACE Solar Array Panels.

1.2 SCOPE

The contractor shall provide the necessary personnel, services, tools, equipment, and materials necessary to inspect, clean and repair the hardware in accordance with the requirements of this SOW and the documents referenced herein.

This SOW defines the contractor tasks, responsibilities, documentation, and schedule, either within this document or by reference.

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

2.0 DESCRIPTION OF TASKS

A summary of the expected actions for each task is included at the end of this section in Table 1.

2.1 TASK 1

The PACE solar array panels provide electrical power for the PACE observatory. To ensure proper operation, they will require visual inspection and cleaning to address any contamination issues that may have occurred during the wing level integration activities. The time frame for this effort is between December 2022 and January 2023.

2.1.1 Cleaning and Visual Inspection

The Contractor shall visually inspect and clean each solar panel (total of 3 panels, which were manufactured under contract 80GSFC20C0005) for any contamination using procedures that the Contractor has developed for this purpose. If the Contractor finds damage to solar cells, cover glasses, interconnects, or any other component that the Contractor assembled onto the solar panels, the Contractor shall document and provide a copy of any damage noted.

2.2 TASK 2

The PACE solar array panels provide electrical power for the PACE observatory. To ensure proper operation, they will require cleaning and visual inspection to find any damage that may have occurred during integration and testing with the observatory in Greenbelt, Maryland. Any damage found to be of significance will need to be repaired to bring the solar panels back to full operating condition. The time frame for this effort is in FY 2023 no earlier than (NET) April 2023.

2.2.1 Cleaning and Visual Inspection

The Contractor shall visually inspect and clean each solar panel (total of 3 panels, which were manufactured under contract 80GSFC20C0005) for damage using procedures that the Contractor has developed for this purpose. If the Contractor finds damage to solar cells, cover glasses, Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

interconnects, or any other component that the Contractor assembled onto the solar panels, the Contractor shall document and provide a copy of any damage noted.

2.2.2 Repair

If the Contractor finds damage to solar cells, cover glasses, interconnects, or any other component that the Contractor assembled onto the solar panels, NASA will review the damage list and provide approval on a line-by-line basis. The Contractor shall repair or replace such damaged component(s) using the procedures that the Contractor has developed for this purpose as requested by NASA.

2.2.3 Spare Parts Storage

The Contractor shall retain and properly store all spare solar cells and parts (previously purchased under 80GSFC20C0005) for the PACE solar array until after the launch of the PACE observatory (nominally in 2024).

2.3 TASK 3

The PACE solar array panels will also need to go through visual inspection to find any damage that may have occurred during its shipment from NASA GSFC to the launch site payload provider facility (PPF) in Central Florida. The nominal plan is to only inspect the outer panel, but if there is an issue during shipping or damage identified on the outer panel, then the Contractor shall inspect all 3 panels. Any damage found to be of significance will need to be repaired to bring the solar panels back to full operating condition. The time frame for this effort is between November 2023 and January 2024.

2.3.1 Cleaning and Visual Inspection

The Contractor shall visually inspect and clean the outer solar panel of the wing (as baseline) for damage using procedures that the Contractor has developed for this purpose. If the Contractor finds damage to solar cells, cover glasses, interconnects, or any other component that the Contractor assembled onto the solar panels, the Contractor shall document and provide a copy of any damage noted.

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

2.3.2 Repair

If the Contractor finds damage to solar cells, cover glasses, interconnects, or any other component that the Contractor assembled onto the outer solar panel (as baseline), NASA will review the damage list and provide approval on a line-by-line basis. The Contractor may repair or replace such damaged component(s) on each solar panel using the procedures that the Contractor has developed for this purpose as requested by NASA.

Task Number Action Timeframe

Inspection and cleaning of wing (3 panels)

After wing assembly.

December 2022 and January 2023

2a Inspection and cleaning of wing (3 panels)

After Observatory mechanical environmental testing.

NET April 2023.

2b Repair of wing (3 panels) After Observatory mechanical environmental testing.

NET April 2023.

3a Inspection and cleaning of outer panel only

After transportation to launch site.

November 2023-January 2024.

3b Inspect, clean and repair wing (3 panels), only if needed

After transportation to launch site.

November 2023-January 2024.

Table 1: Action summary per task