SOW.docx
DOCX document 19 KB Posted
- Attached to
- CRANE WASTE WATER PUMPS Federal contract opportunity
- Solicitation number
- N5005422Q0109
About this file
This document includes a statement of work and related federal contract opportunity solicitation. The statement of work defines requirements to supply and deliver three centrifugal waste water pumps and associated parts to replace equipment aboard the USS SAN ANTONIO LPD-17. Delivery is required by March 1, 2023 to a Navy facility in Norfolk, Virginia. The related federal contract opportunity solicitation seeks quotes to provide the pumps and parts as identified in the statement of work. Responses are due by August 5, 2022. Quotes will be evaluated on technical acceptability and price reasonableness. The solicitation is set aside for small businesses and provides contact information for questions. The Navy's Mid-Atlantic Regional Maintenance Center issued the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 52.212-5.pdf | ||
| Brand Name Justification.pdf | ||
| DD2345 Instructions dated Aug 2021.pdf | ||
| Combined Synopsis Solicitation.docx | DOCX document | |
| 52.212-5.docx | DOCX document | |
| DD2345 Presentation.pdf | ||
| DD2345 Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
USS SAN ANTONIO LPD-17
SSP: TPPC-LPD17-MARMCN22-CN01
Title: 1A,1B,2A & 2B Plumbing Waste Water Pump; replace Work Spec Items: 593-12-001 & 593-12-002
1.0. INTRODUCTION.
1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, and Norfolk, VA 23511.
2.0. GENERAL REQUIREMENTS
2.1. The Contractor shall supply and deliver the material listed in 2.1.1 complying with the following specifications:
| SOW Para no. |
| QTY |
| NAME OF PART |
| DRAWING # |
TECH MANUAL
| PIECE # |
| W/I # |
| W/I Para # |
| 2.1.1 |
| 3 |
| Pump, Centrifugal |
NSN: 4320-01-558-7307 (currently on order, but has an excessive lead time and will not arrive before the end of the ships availability)
S6226-SS-MMC-010 REV 2
| 107161-8 |
| 593-12-001 |
593-12-002 5.1.1
2.2 All material to be in accordance with Reference 3.4 of work spec item 593-12-001 & 593-12-002.
2.3 Required Date of Delivery: 3/01/2023 or best possible.
3.0. DELIVERY / ACCEPTANCE
3.1. Delivery shall be made to the following address:
DLA Distribution Norfolk RMC PROJ Bunker Hill Towaway Bldg. X136 Norfolk, VA 23511
Primary: Mr. Hubbeard Ervin Phone: (757) 373-8698 or (757) 278-8134
Secondary: Mr. Cunningham Phone: (757) 278-8148 RIC 17H
3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at FOB Destination. Shipping cost shall be included in the quote.
4.0 MATERIAL SHIPMENT NOTIFICATION
4.1 Notification of date and tracking information to be provided to the following upon shipment of material:
4.1.1. Allison Blair, allison.k.harding.civ@us.navy.mil, phone (757) 967-6077
4.1.2. Shephard Whitfield, shephard.l.whitfield.civ@us.navy.mil, phone (757) 967-6076
2 | Page
File details come from the government source that posted it. Updated .