SOW Cummins Generator Replacement Schriever LA - EW.pdf

PDF 477 KB Posted

Attached to
Cummins Generator Replacement- USDA, ARS, Schriever, LA Federal contract opportunity
Solicitation number
12405B24R0031
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to replace a diesel Cummins generator with a natural gas-powered generator at the USDA Agricultural Research Service Sugarcane Research Center in Schriever, LA.

The key requirements include disconnecting the existing generator, installing a new Cummins 40kW natural gas generator on a raised platform, installing a natural gas line, connecting the new generator to the existing automated transfer switch, and properly disposing of the old generator and diesel tank. All work must comply with local, state, and federal codes, as well as the ARS Facilities and Design Standards. Proposers are encouraged to conduct a site visit prior to submitting a detailed cost proposal in MS Excel and narrative description in MS Word. The contract has a period of performance of 120 days from the notice to proceed and requires use of bio-based materials where possible. The solicitation for this contract opportunity is a small business set-aside with a proposal due date of August 30, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Cummins Generator Replacement- USDA, ARS, Schriever, LA, newest first.
File Type Posted
Questions and Answers 12405B24R0031 final.pdf PDF
REVISED -SOW Generator Replacement Schriever LA - EW PW 8-21-24.pdf PDF
Sol_12405B24R0031.pdf PDF
SF-24 Bid Bond.pdf PDF
Experience Sheet.docx DOCX document
Wage Determination- Schriever LA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Cummins Generator Replacement Sugarcane Research Center

501 Bull Run Road, Schriever, LA 70395

Prepared by:

Everett Wilson

STATEMENT OF WORK:

Contractor shall furnish all labor, materials, and supplies to perform the following work for U. S.

Department of Agriculture, Agricultural Research Service, Sugarcane Research Center, 501 Bull Run Road, Schriever, LA 70395

All work shall be completed in accordance with all local, state, and federal codes and regulations. All work should meet the manufacturer’s requirements for all equipment used in the project. All work shall also meet the requirements of the ARS Facilities and Design Standards (P&P 242.1). The P&P 242.1 document can be found at: http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf. All work shall be accomplished in a professional manner and in accordance with good workmanship and acceptable practice.

Contractor is responsible for inspecting the site and for determining the exact dimensions and requirements of the project with input from site personnel prior to submitting proposal and detailed cost breakdown.

Contractor shall obtain at own expense all permits, licenses, and inspections required by all local, state, and federal authorities. Contractor shall submit written specifications for all materials and supplies to be used and included in the bid.

Contractor’s working hours shall be scheduled to coincide with the normal working hours (7am-4pm) at the site. Should it be necessary to schedule working hours other than normal working hours, contractor shall arrange for access to the work area with the Contracting Officer’s Representative (COR) at the site at least three days prior to the need.

Contractor shall notify and schedule utility outages at least 24 hours in advance.

During work, contractor shall maintain a safe work area around the site of repair and clearly mark danger areas with cones and safety tape. All unused and demolition materials shall be removed from the site by the contractor and shall not be placed in the owner’s disposal areas. The contractor will be responsible for replacing at their cost any property damaged at the site during the construction process.

PROJECT REQUIREMENTS:

Provide all labor, equipment, and materials required to:

The Integrated Water Modular Building at the USDA Ardoyne Farm in Schriever was serviced by a diesel Cummins ONAN DGCA 50 kW generator originally brought from Baton Rouge ARS location in 2010. The generator is no longer functioning and needs to be replaced. The generator was controlled by an automated transfer switch (Cummins OTEC SEC 7805857) and is fed 3-phase power from a transformer approximately 100 feet away. The project will entail disconnecting the current generator, installing a new natural gas-powered generator on a platform at least 18” above the ground that’s approved by Lab personnel, installing the required natural gas line, connecting the new generator to the existing transfer switch, and disposal of old generator and 250-gallon diesel tank. The new generator must be a direct Cummins replacement for the existing Cummins ONAN generator to be installed as only a Cummins will work with the existing transfer switch which will not be replaced. The direct replacement generator is available on GSA and is specified as such for compatibility with existing electrical equipment at the Lab:

40KW Diesel Standby Generator, Mfr. Part No.: C40 D6, Manufacturer: Cummins.

http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf

Site Visit:

Proposers are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a proposal is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.

Utilization of Bio-Based Products:

As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c) (3)), the Offeror certifies, by signing this offer, that bio-based products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 3201, subpart B) to be used or delivered in the performance of the contract, other than bio-based products that are not purchased by the Offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.

The contractor shall utilize products and material based from bio-based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at:

https://www.biopreferred.gov

Recycling.

Contractor shall make best effort to recycle any construction debris created during the contract.

Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. Contractor shall furnish a Site-Specific Safety Plan (SSSP) and the Government shall review the SSSP prior to the beginning any construction activities. SSSP shall be in typically accepted industry format.

Detailed Proposal: A detailed cost proposal is required. Provide all materials, labor, and equipment to fully and successfully complete the Statement of Work described in this document. Proposal cost detail shall be in MS Excel and the work description shall be in MS Word.

https://www.biopreferred.gov/

CONTRACTOR RESPONSIBILITY:

The project will be performed per the following specifications:

1. All work shall comply with existing local, state, and national codes, including guidelines and specifications included in the Americans with Disabilities Act. All work shall also meet the requirements of the ARS Facilities and Design Standards (P&P 242.1) which can be found at http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf. All work shall be accomplished in a professional manner and in accordance with good workmanship and acceptable practice.

2. Contractor will verify all dimensions and quantities of materials and existing site conditions prior to beginning work.

3. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.

4. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.

5. Contractor will provide daily reports of work performed to the COR.

6. Contractor shall remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site on a weekly basis.

7. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.

8. Contractor must have a superintendent responsible for overseeing this project.

9. Contactor will provide their restroom facility.

Material / Submittals:

The material for the entire work shall be as specified above. Submittals on all materials, including but not limited to proposed replacement generator unit, stand construction materials, wiring and natural gas plumbing, used on this project shall be submitted to the COR and Lab personnel for approval as noted in this document. The documents detailing the material covered by the submittals will be provided electronically.

Installation Procedure:

Contractor will verify all dimensions and site conditions prior to beginning work. Contractor will schedule the work between working hours as listed below. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall be responsible for always protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.

Damage to Property:

Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.

Inspection and Acceptance:

A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.

Project Schedule:

The completion of this project shall not exceed 120 days from date of notice to proceed (NTP). A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.

Work Hours:

Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M. except for Government holidays or at the discretion of the site with written approval obtained a minimum of 24 hours in advance.

CONTRACTOR RESPONSIBILITY:
Material / Submittals:
Installation Procedure:
Damage to Property:
Inspection and Acceptance:
Project Schedule:
Work Hours: