SOW - Boom Lifts.pdf
PDF 153 KB Posted
- Attached to
- 80ft Explosion Proof Boom Lifts Federal contract opportunity
- Solicitation number
- FA812523Q0012
About this file
This statement of work outlines requirements for two 80-foot explosion proof boom lifts to support corrosion control operations at Tinker Air Force Base. The boom lifts must be battery powered and certified for use in hazardous locations. They require a minimum 80-foot vertical reach and 120-degree jib articulation. Other specifications include an 8-hour battery life, fall protection system, compressed airlines, and safety features. Delivery is required to Building 2280 at Tinker AFB by the closing date of the small business set-aside solicitation from the Air Force Sustainment Center. The solicitation seeks pricing and plans to meet technical criteria for the boom lifts with a response deadline before the stated closing date. Training, manuals, and management responsibilities are also outlined in the statement of work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA812523Q0012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
(SOW)
For 80ft Explosion Proof Boom Lifts
PREPARATION DATE: 27 Sept 2022
PREPARING ORGANIZATION: 76 AMXG/MXDEC TINKER AFB OK 73145
1.0 SCOPE
The purpose of this Statement of Work (SOW) is to define the requirements for procurement of two (2) Explosion Proof Boom Lifts which shall be used to perform corrosion control operations on all weapon systems (E-3, KC-135, B-52, B-1B, Navy E- 6, Navy C-130, and AF C-130) in the 76 Aircraft Maintenance Group (76 AMXG). Two
(2) explosion proof boom lifts which are certified for use in a Class I, Division I hazardous location are required to support painting of Program Depot Maintenance (PDM) and contracted workloads in Building 2122, Building 2280, and Building 3225.
The explosion proof boom lifts provide the flexibility to perform tasks on various weapon systems and safer access to reach all areas of any aircraft. The boom lifts will help resolve facility support equipment, capacity, and capability limitations that currently exist throughout the Corrosion Control facilities.
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision and other items (e.g. Personal Protective Equipment (PPE)) necessary to perform the requirements of this SOW and contract as defined in this Statement of Work (SOW). The Contractor shall provide and use only new parts and material unless authorized by the Contracting Officer (CO).
1.1 BACKGROUND
The 76 AMXG paint facilities support corrosion control operations (painting and chemically depainting) on all PDM and contracted weapon systems. There are currently six (6) explosion proof boom lifts being shared in four (4) aircraft paint docks. The explosion proof boom lifts are equipped with OSHA certified fall arrest systems which allow the employees to work outside the basket, making it safer to access difficult to reach areas. The boom lifts are also designed to allow personnel to safely access all areas of an aircraft, which would otherwise require the use of expensive maintenance stands specially designed for each weapon system. These explosion proof boom lifts are Class I, Division I safety rated for painting operations. The explosion proof boom lifts shall be exposed to large quantities of water during washing, rinsing, and chemical depainting of aircraft. The explosion proof boom lifts shall enable personnel to safely access all areas of any weapon system, regardless of the facility and available support equipment.
The limited quantity to support multiple aircraft, frequent usage of the boom lifts, and traveling between four (4) different paint docks has caused immense wear and tear on existing equipment. Two (2) of the six (6) existing explosion proof boom lifts are 8 years old and need to be replaced due to high maintenance cost, age of the equipment, and downtime to repair which has led to additional process flowtime on aircraft. Over the past year, at least two out of the six existing boom lifts were inoperable due to on-going repairs. Two (2) new explosion proof boom lifts are required to accomplish the mission.
2.0 APPLICABLE DOCUMENTS
2.1 NON-GOVERNMENT STANDARDS AND OTHER PUBLICATIONS
2.1.1 OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
REGULATIONS TO INCLUDE, but not limited to:
a. OSHA 29 CFR 1910
b. OSHA 29 CFR 1926
c. ANSI Z359, Fall Protection Code
2.1.2 NATIONAL FIRE PROTECTION AGENCY (NFPA) Codes and Standards to include but not limited to:
a. NFPA 70, National Electric Code (NEC)
b. NFPA70E, National Electric Safety Code
c. NFPA 101, Life Safety Code
d. NFPA 241, Standard for Safeguarding Construction, Alterations, and Demolition
Operations
e. NFPA 30, Flammable and Combustible Liquids Code
NFPA publications may be found at the following web site: http://www.nfpa.org
2.1.3 UNIFIED FACILITY CRITERIA (UFCS) TO INCLUDE, but not limited to:
a. UFC 1-200-01, General Building Requirements
b. UFC 4-211-02NF, Corrosion Control and Paint Finishing Hangars
c. UFC3-420-01, Plumbing Systems
d. UFC 3-520-01, Interior Electrical Systems
e. UFC 3-600-01, Design: Fire Protection Engineering for Facilities
UFCs may be found at the following web site: http://www.wbdg.org.
2.1.4 INTERNATIONAL CODE COUNCIL (ICC) CODE PUBLICATIONS TO
INCLUDE
a. International Building Code
b. International Fire Code
ICC publications may be found at the following web site: http://www.iccsafe.org
2.1.5 Air Force Engineering Technical Letters (ETLs) as listed at the following web site:
http://www.afcesa.af.mil/library/etl
2.1.6 National Electrical Manufacturers Association
a. NEMA 250-2014 (Enclosures for Hazardous Wet locations) http://www.nfpa.org/
3.0 SPECIFICATIONS
3.1 SPECIFICATIONS
a. The contractor shall provide two (2) battery-powered Explosion Proof Articulating Boom Lifts that shall be used for painting.
b. The Explosion Proof Articulating Boom Lifts shall be 3rd party certified by a globally recognized certification organization (such as…Underwriters Laboratories (UL), Factory Mutual (FM), etc…) for use in a Class I, Division I hazardous location.
c. The explosion proof boom lifts shall be equipped with customized lift fall protection systems for exiting the platform and performing tasks up to six feet from the platform. The fall protection system shall be certified by a Qualified Fall Protection Engineer documenting the designed system meets OSHA/ANSI Z359 requirements.
d. The explosion proof boom lifts shall be equipped with batteries that are capable of continuous operation for a minimum of 8 hours. A spare battery shall be provided for each boom lift to allow continuous operational use of the boom lifts between shifts.
e. The explosion proof boom lifts shall have two foam filled tires and two solid conductive tires.
f. The contractor shall provide a battery charger for each of the explosion proof boom lifts. The existing power sources provide 480V, 3-Phase AC Power.
g. The explosion proof boom lifts shall have a weight capacity to support a minimum two (2) persons with tools, a minimum platform weight capacity of 500lbs.
h. The explosion proof boom lifts shall be equipped with compressed airlines to support the operation of pneumatic powered tools (paint guns, sanders, HEPA vacuum equipment, etc.). All hardware must be rated for compressed air at 100-
120 PSI.
i. The boom lifts shall be used in a wet environment (chemical de-painting and washing of aircraft) and shall be designed with NEMA enclosures for wet hazardous locations.
j. The boom lifts shall be equipped with the following safety features:
a. movement alarm
b. emergency stop
c. tilt alarm
d. battery charge indicator
k. The boom lifts shall have a bump protection system designed to stop movement of the platform if the bucket were to come in contact with an object.
3.1.1 DIMENSIONS
The contractor shall provide boom lifts that are capable of reaching a minimum of 80 feet vertically and articulate to allow access to difficult to reach areas of any aircraft (tail section – verticals and horizontals). The boom lift shall also be equipped with an articulating jib that will provide access and maneuverability to all areas of the aircraft.
The jib shall have a minimum range of articulation of 120 degrees. The boom lift platform shall have inside dimensions no less than 35” x 95”.
3.1.2 ELECTRICAL CHARACTERISTICS
The explosion proof boom lifts shall be independently certified by an industry recognized laboratory for use in a NFPA 70 (National Electric Code) Class I, Division I hazardous location in which aerospace spray painting/depainting operations shall occur.
The NFPA 70 requirements include:
Class I, Division 1
A Class I, Division 1 hazardous location is a location where ignitable concentrations of flammable gases, vapors or liquids:
• can exist under normal operating conditions;
• may exist frequently because of repair or maintenance operations or because of leakage; or
• may exist because of equipment breakdown that simultaneously causes the equipment to become a source of ignition
Equipment intended for use in a Class 1, Division 1 area must be of the explosion proof, intrinsically safe or purged/pressurized type.
Per 29 CFR 1926.449, an explosion proof apparatus is defined as: "Apparatus enclosed in a case that is capable of withstanding an explosion of a specified gas or vapor that may occur within it and of preventing the ignition of a specified gas or vapor surrounding the enclosure by sparks, flashes, or explosion of the gas or vapor within and that operates at such an external temperature that a surrounding flammable atmosphere will not be ignited thereby."
3.1.5 DELIVERY
The boom lifts shall be delivered to Building 2280, Tinker AFB, OK 73145 and shall be offloaded from the delivery truck/trailer by the contractor.
3.1.6 MANUALS
The contractor shall furnish a minimum of four (4) hardcopies of the Operation and Maintenance manuals at delivery of each explosion proof boom lift. Electronic versions of the Operational and Maintenance manuals shall be provided in addition to the minimum four (4) hardcopies. The manuals shall provide recommended guidance and instructions on operation of the equipment and preventative and remedial maintenance.
a. Maintenance Manuals. The contractor shall supply his recommendations for an on-going maintenance program. Program recommendations shall include recommended inspection criteria, intervals and periodic and long-term maintenance operations. As built drawings shall include illustrated parts breakdown showing part numbers for replacement parts. Recommendations shall also include quantities and frequency of repair parts to be kept on hand for frequent repairs.
b. Inspection Manuals
c. Training Manuals
d. Spare Parts List – The contractor shall provide a recommended spare parts list and information on cost and sources of supply.
3.1.7 TRAINING
The contractor shall support Government personnel by providing on-site training/demonstration of operation and maintenance of the equipment. The training shall be provided at time of delivery.
3.2 MANAGEMENT REQUIREMENTS
The contractor shall ensure the following requirements are accomplished:
3.2.1 CONTRACTOR PERSONNEL
Contractor employees who are required to communicate with Government personnel shall have the ability to clearly read, write, and speak English.
4. GENERAL REQUIREMENTS
Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0600-1400 hours. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or Government POC must be present with the Contractor.
These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.
FOLLOWING IS MANDATORY FOR ANY WORK PERFORMED ON BASE
Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health.
The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.
Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker Air Force Base Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and Complex procedures per Oklahoma City Air Logistics Complex (OC- ALC) Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e- Publishing website at www.e-publishing.af.mil for downloading or ordering.
Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911.
The Contractor shall immediately report all environmental violations to the GPOC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:
One (1) copy to CO, two (2) copies to the GPOC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:
1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.
Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this SOW.
Foreign Object Damage (FOD) and Dropped Object Prevention: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground
Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5.
(Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the Government POC or the YouTube site, http://www.youtube.com/watch?v=tYcbodjFPnM.
The Contract Manager shall provide written certification to the Government POC for each employee within ten (10) business days after the contract award date. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the Government POC prior to the employees starting work in the OC-ALC shops. Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the Government POC.
Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.
Visitors Pass: The Contractor shall contact the Government POC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The Government POC will assign a sponsor for the Contractor from within the organization.
The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS.
The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.
Foreign Nationals: The Contractor shall notify the Government POC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.
Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated Occupational Safety Instruction”, as established by this contract and Appendix C. The Contractor shall notify the CO, Government POC, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, Government POC, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.
Combating Trafficking in Persons: IAW DFARS PGI 222.17, the COR shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:
a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.
b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.
c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.
d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.
Speak up for safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.
A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.
Events that present imminent danger to personnel or catastrophic damage to property we empower our employees to intercede to ensure continued safe operations.
Communicating Hazards Of Workplace (CHOW): Contractor’s onsite representative communicates all hazards being introduced to the worksite by the Contractor. This is accomplished prior to commencement of work and refreshed daily during performance, IAW Contractor’s Site Safety Plan.
Safety and Health Plan: The Contractor shall be responsible for compliance with the OSHA Public Law 91-596. The Contractor shall submit a Safety and Health Plan (SHP) and corresponding site safety checklist to the CO and the COR (see Appendix C).
Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the
Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.
| 1.0 SCOPE |
| 1.1 BACKGROUND |
| 2.0 APPLICABLE DOCUMENTS |
| 2.1 NON-GOVERNMENT STANDARDS AND OTHER PUBLICATIONS |
| 2.1.1 Occupational Safety and Health Administration REgulations TO INCLUDE, but not limited to: |
| 2.1.2 NATIONAL FIRE PROTECTION AGENCY (NFPA) Codes and Standards to include but not limited to: |
| 2.1.3 UNIFIED FACILITY CRITERIA (UFCS) TO INCLUDE, but not limited to: |
| 2.1.4 INTERNATIONAL CODE COUNCIL (ICC) CODE PUBLICATIONS TO INCLUDE |
| 2.1.5 Air Force Engineering Technical Letters (ETLs) as listed at the following web site: http://www.afcesa.af.mil/library/etl |
| 3.0 SPECIFICATIONS |
| 3.1 SPECIFICATIONS |
| 3.1.1 DIMENSIONS |
| 3.1.2 ELECTRICAL CHARACTERISTICS |
| 3.1.5 DELIVERY |
| 3.1.6 MANUALS |
| 3.1.7 TRAINING |
| 3.2 MANAGEMENT REQUIREMENTS |
File details come from the government source that posted it. Updated .