This document package includes a scope of work and attachments for a federal contract solicitation to supply class III riprap rock for a habitat restoration project. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District St Paul as number W912ES24Q0026. The scope of work outlines specifications for rock gradation and testing methods, approved quarry sources in Minnesota, daily reporting requirements, and closeout documentation including quality control records. Attachments include maps of the project site, submittal forms, a blank submittal register, and worksheets for gradation analysis. The solicitation seeks bids for supplying graded rock riprap to be used in constructing habitat features at the Bass Ponds habitat restoration project location in Scott County, Minnesota.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Class III Gradation.pdf | ||
| 24Q0026 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
FOR
Bass Ponds HREP Rock Supply Contract Scott County, MN
October 2023
SOLICITATION NO. W912ES24Q0026
US Army Corps of Engineers St. Paul District
Bass Ponds HREP Rock Supply Contract Scott County, MN
W912ES24Q0026
10/11/23
3.1 ATTACHMENTS
a. Vicinity, Site, and Aerial Maps
b. Submittal Transmittal Form (ENG Form 4025)
c. Sample Submittal Register
d. Blank Submittal Register (ENG Form 4288-R)
e. Approved Material Sources
f. Riprap Gradation Analysis Worksheet, Method A
g. Riprap Gradation Analysis Worksheet, Method B
h. USGS Bloomington MN 7.5 Minute Quadrangle
-- End of Section --
SECTION 01 11 19 Page 11
Attachment a. – Vicinity, Site, and Aerial Maps
Scott County Savage, MN Vernon Ave
Friday, July 21, 2023 12:15:15 PM - 5. 90%_plan_set_2May2019 (1).pdf - Adobe Acrobat Pro (32-bit)
River Access Loading/
Attachment b. – Submittal Transmittal Form (ENG Form 4025)
U.S. Army Corps of Engineers (USACE)
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.
DATE TRANSMITTAL NO.
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)
TO: FROM: CONTRACT NO. CHECK ONE:
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL
SPECIFICATION SEC. NO. (Cover only one section with each transmittal) PROJECT TITLE AND LOCATION THIS TRANSMITTAL IS FOR: (Check one)
FIO GA DA CR DA/CR DA/GA
ITEM
NO.
(See
Note 3) a.
DESCRIPTION OF SUBMITTAL ITEM
(Type size, model number/etc.)
b.
SUBMITTAL
TYPE CODE
(See Note 8) c.
OF
COPIES
d.
CONTRACT DOCUMENT
REFERENCE
CONTRACTOR
REVIEW
CODE
g.
VARIATION
Enter "Y" if requesting a variation
(See Note 6) h.
USACE
ACTION
CODE
(Note 9) i.
SPEC.
PARA. NO.
e.
DRAWING
SHEET NO.
f.
REMARKS I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.
NAME OF CONTRACTOR
SIGNATURE OF CONTRACTOR
SECTION II - APPROVAL ACTION
ENCLOSURES RETURNED (List by item No.) NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY DATE
ENG FORM 4025, MAY 2017 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2
INSTRUCTIONS
1. Section I will be initiated by the Contractor in the required number of copies.
2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.
3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.
4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.
5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.
6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.
7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.
8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.
Submittal types are the following:
SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout
9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal
Action Codes in column i of Section I. The Submittal Action Codes are:
A -- Approved as submitted.
B -- Approved, except as noted on drawings. Resubmission not required.
C -- Approved, except as noted on drawings. Refer to attached comments.
Resubmission required.
D -- Will be returned by separate correspondence.
E -- Disapproved. Refer to attached comments.
F -- Receipt acknowledged.
X -- Receipt acknowledged, does not comply with contract requirements, as noted.
G -- Other action required (Specify) K -- Government concurs with intermediate design. (For D-B contracts) R -- Design submittal is acceptable for release for construction. (For D-B contracts)
10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.
ENG FORM 4025, MAY 2017 Page 2 of 2
Attachment c. – Sample Submittal Register
SUBMITTAL REGISTER
CONTRACT NO.
W912ES24Q0026
TITLE AND LOCATION
Bass Ponds HREP Rock Supply Contract
CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G # R A P H
G O V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 11 19 SD-01 Preconstruction Submittals Submittal Control Document 1.5.2 G (ENG Form 4288-R)
Method Of Processing Riprap 2.1.5 G Material Sources 2.2.1.1 G Pre-Delivery Site Survey 3.6 G Weighing Plan 1.2.1.1.1 G Tests For Acceptability Of 2.3 G Alternative Source Material
SD-04 Samples Samples Of Materials 2.3.2 G Riprap Sample 2.4.4
SD-06 Test Reports Daily Report 1.2.1.1 Gradation Testing Results 2.4.1 G
SD-07 Certificates Certification Document 1.2.1 G
SD-11 Closeout Submittals Records Of The Quality Control 3.4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
Attachment d. – Blank Submittal Register
SUBMITTAL REGISTER
(ER 415 1-10)
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR SPECIFICATION SECTION
TYPE OF SUBMITTAL CLASSI-
FICATION
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
A C T I V I T Y
N O
TRANS-
MITTAL
I
E M
SPECIFICATION
PARAGRAPH
NUMBER
DESCRIPTION OF
ITEM SUBMITTED
D
R A W I N G S
S T R U C T I O
H E D U L
A T E M E N
P O R
R T I F I C A T
M P L
C O R
N U A L
F O R M A T O I N O L N Y
G
V A E P R P N R M O E V N E T D
V I E W
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
DATE
SUBMIT
TO
GOVERN
MENT
DATE
REMARKS
a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z. aa.
ENG FORM 4288-R, JAN 97 EDITION OF MAR 95 IS OBSOLETE. PAGE O PAGES (Proponent:
Attachment f. – Approved Material Sources
BASS PONDS HREP ROCK SUPPLY CONTRACT APPROVED MATERIAL SOURCES FOR RIPRAP
QUARRY NAME AND OPERATOR QUARRY LOCAITON NOTES
Larson Plant Aggregate Industries Inc 2815 Dodd Road, Suite 101 Eagan, MN 55121
(651) 683-0600
Ninninger Quarry Solberg Aggregate Products Hastings, MN
(651) 437-6672
T 27 N, R 22 W NE ¼, Section 26 Washington County, MN
T115N, R17W NW ¼, SE ¼ Section 31 Dakota County, MN
1, 2
1, 2
NOTES:
1. Systematic blasting shall be performed in order to minimize deleterious cracks in the final product.
2. Processing riprap with a vibrating grizzly is a minimum requirement.
Attachment g. – Riprap Gradation Analysis Worksheet, Method A
WORK SHEET FOR GRADATION ANALYSIS OF RIPRAP
METHOD A
Project Name: Date:
Riprap Type: Test No.
Source, Quarry, or Pit:
Sample Location: Test Made By:
Part 1. Weigh all stones larger than 5 pounds and record.
(1) PASSING WT. 5 lbs.
(2) RETAINED WT. 5 lbs. PAN
(3) ------- -------
(4) TOTALS
Rows (1) & (2) Enter 5 to 7 weight classes to yield approx. 75%, 50%, 30%, and 15% finer points.
Row (3) List weight of each stone. Attach additional sheets if necessary.
Row (4) Add all individual stone weights listed in each column.
Part 2. Summary Table.
(5) WEIGHT CLASSES (6)
TOTAL WEIGHT
EACH CLASS
(lbs.)
(7)
CUMMULATIVE
WEIGHT PASSING
(lbs.)
(8)
TOTAL PERCENT
PASSING
PASSING
(stone wt.
in lbs.)
RETAINED
(stone wt.
in lbs.)
5 lbs.
5 lbs. PAN
SAMPLE TOTAL -------- --------
Column (5) Enter same weight classes used in Rows (1) and (2).
Column (6) Enter weights of material from Row (4) Column (7) Add column (6) from bottom up to get cumulative weight passing.
Column (8) Divide column (7) by sample total to get total percent passing.
Attachment h. – Riprap Gradation Analysis Worksheet, Method B
WORK SHEET FOR GRADATION ANALYSIS OF RIPRAP
METHOD B
Project Name: Date:
Riprap Type: Test No.
Source, Quarry, or Pit:
Sample Location: Test Made By:
Part 1. Separate rock into 5 to 7 piles, ordered by size. The largest pile should contain 2 to 5 stones. Intermediate piles between the largest stones and those smaller than 5 pounds should be approximately equal in total weight. Separate all stones before weighing.
Part 2. Summary Table.
(1) WEIGHT CLASSES (2)
TOTAL WEIGHT
EACH CLASS
(lbs.)
(3)
CUMMULATIVE
WEIGHT PASSING
(lbs.)
(4)
TOTAL PERCENT
PASSING
PASSING
(stone wt.
in lbs.)
RETAINED
(stone wt.
in lbs.)
5 lbs.
5 lbs. PAN
SAMPLE TOTAL -------- --------
Column (1) Weight the smallest and largest stone in each pile. If weight classes overlap, adjust stones as necessary and repeat.
Column (2) Weigh the total amount of rock in each pile and record.
Column (3) Add column (2) from bottom up to get cumulative weight passing.
Column (4) Divide column (3) by sample total to get total percent passing.
Attachment i. – USGS Bloomington MN 7.5 Minute Quadrangle
1/llUSGS
UMl«llwt"""'"'""'wwlrl
U.S. DEPARTMENT OF THE INTERIOR
U.S. GEOLOGICAL SURVEY
BLOOMINGTON QUADRANGLE
f ,- -••--- O•- O=-
UTIIGAll-,2011MGIETIC-™ DEa...TIOHATCENIDIOFSMEET
Cotm>UltOIT[,.,J.LIOf'EET HOIITTI ... EIIK.<NVEl!TKALW.TUMOF,9&1
............-to,..-·
,.,_,..;, w
.,.. BLOOMINGTON, MN
| Scott County Savage, MN Vernon Ave |
| WEIGHT OF STONES IN POUNDS |
| SPECIFIC GRAVITY OF STONE = 2.65 |
| RIPRAP/ROCKFILL GRADATION CURVE |
| WEIGHT OF STONES IN POUNDS |
| SPECIFIC GRAVITY OF STONE = 2.65 |
| RIPRAP/ROCKFILL GRADATION CURVE |