SOW Air handler Air Condensing Unit B610 B611 B612.pdf

PDF 143 KB Posted

Attached to
Remove/Replace HVAC Units (3) Federal contract opportunity
Solicitation number
W50S8N-22-Q-0015
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Remove/Replace HVAC Units (3), newest first.
File Type Posted
IMG_1631.jpg JPG image
SF 30.pdf PDF
IMG_1629.jpg JPG image
IMG_1630.jpg JPG image
W50S8N22Q0015.pdf PDF
Wage Det.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Replacement of Air Handler & Condensing HVAC Unit -- Building 610, 611, 612

174th Attack Wing

Hancock Field ANG Base 6001 East Molloy Road

Syracuse, New York 13211

22 March 2022

TABLE OF CONTENTS

1. SCOPE OF WORK

2. AREA OF WORK

3. DESCRIPTION OF WORK

4. PERIOD OF PERFORMANCE

5. MATERIALS & EQUIPMENT

6. GENERAL CONDITIONS

7. DIFFERING SITE CONDITIONS

8. GOVERNMENT WORKING HOURS

9. UTILITIES

10. DISPOSAL OF MATERIALS AND CLEANUP

11. MATERIAL & EQUIPMENT ACCOUNTABILITY

12. FIRE & SECURITY

13. ENVIRONMENTAL

14. ACRONYMS & ABBREVIATIONS

1. SCOPE OF WORK:

The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to complete the work as described in this Statement of Work (SOW).

Work location is the 174th Attack Wing (174 ATKW), 6001 East Molloy Road, Syracuse, New York 13211 on Hancock Field Air National Guard Base.

2. AREA OF WORK:

Contractor shall work only in the areas designated by Contracting Officer Representative (COR). Work will be primarily located within Buildings 610, 611, 612 (Base Exchange) with the air condensing units just outside their respective buildings.

3. DESCRIPTION OF WORK:

3.1. The work specified by this section consists of furnishing all labor, equipment, tools, appliances, transportation, materials to complete demolition & install.

3.2. All work must be completed without damage to any other government property outside of this work scope.

All work performed under this SOW shall be conducted in accordance with all applicable state and federal laws and regulations, Department of Defense (DoD) policies and regulations including the Unified Facilities Criteria (UFC).

3.3. This includes but is not limited to UFC 3-410-01 Heating, Ventilating, And Air Conditioning Systems, UFC 3-410-02 Direct Digital Control For HVAC and Other Building Control Systems, UFC 3-470-01 Utility Monitoring And Control System (UMCS) Front End And Integration, and UFC 3-520-01 Interior Electrical Systems. Any discrepancies among regulations, the most stringent regulation applies. Any requests to deviate from the most stringent regulation shall be submitted in writing to the 174th Base Civil Engineer for approval.

3.4. Facility Work

3.3.1 The Air National Guard requires reliable air handler system that is adequately sized, appropriately configured, environmentally compliant (410A refrigerant), and energy efficient. All work performed under this SOW shall be conducted in accordance with all applicable state and federal laws and regulations, ANG policies and regulations. Reclaimed R-22 refrigerant from the 3 condensing units removed is to be turned in to base environmental department. Verification of evacuation of line set/evaporator coil down to 500 microns or less for 15 minutes witnessed by base personnel. All proper HVAC and electrical practices will be followed.

3.5. Remove and Replace at building 610

1. Existing air handler to be removed and replaced with air handling unit to support the new 7.5 ton dual circuit condensing unit with hydronic coil with designed operation of 140 degree water temperature, and DX coil to match 7.5 ton dual circuit condensing unit. Comparable to that of a Trane BCHD090

a. New air handling unit blower will be direct drive with VFD not ECM motor.

b. Existing voltage is 460/60/3

c. Existing wire, conduit, and circuit breaker may be reused provided they are properly sized. If not they must be replaced.

d. New unit must have new mixing box and dampers to accommodate minimum outside air flow (adjustable) and ability to economize (adjustable) when conditions allow.

e. Unit is to have outside isolation damps that close during unoccupied times.

f. Supply and return duct to room 126 to be removed

g. Existing thermostat to be relocated to larger common area.

h. Contractor may have to temporarily disconnect sprinkler line in order accomplish air Handler removal and replacement which will be coordinated with base FD.

2. Existing air condensing unit to be removed and replaced with dual compressor/ dual circuit 7.5 ton unit, comparable to that of a Trane TTA09044DAB

a. New unit shall have voltage of 460/60/3

b. Belly band heaters

c. Head pressure controls

d. Replace line set with properly sized and insulated line set with filter dryer

e. Replace existing outside disconnect.

3. Remove and replace all refrigerant piping with properly sized and insulated piping

a. Outside insulation to be weather resistant

b. Isolation valves and liquid line filter required.

c. Properly seal building penetrations.

4. Rewire existing DDC points and add necessary points and control wire for proper control of dual circuit condenser

a. Provide condenser start up sheet to include exact refrigerant amounts.

5. Provide and install new wall mounted space saving cooling system for sensitive electronics in room 126. Unit should be Liebert DataMate VERTIV with outdoor condensing unit split system or equivalent

a. Provide and install wall mounted cooling system with heat output capabilities of 24,000 BTU/hr, comparable to that of a VERTIV DME027E evaporator and PFH027A condensing unit.

b. Connect both new units to the existing power panel SH (460/60/3) in room 123, or nearest appropriate panel within the building with new properly sized wire and conduit verified through the equipment manufacturers specifications and verified by CE.

c. Furnish and install contractor provided 30 amp breaker and associated disconnects in panel SH

6. Air condensing unit shall be comparable to Liebert precision unit PFH027A-PL7

a. Provide and install 4” thick concrete pad with welded wire fabric

b. Provide and install 2’ steel stand mounted to concrete pad for unit

7. New condensate line shall be insulated

8. New condensate pump shall be provided and installed

a. Contractor may cut appropriate sized hole in exterior wall for condensate line to run outside. Must be approved by CE personnel.

3.6. Remove and Replace at Building 611

1. Existing air handler and duct furnace shall be removed and replaced with air handling unit, with hydronic coil with designed operation of 140 degree water temperature, and DX coil to match 7.5 ton dual circuit condensing unit. Comparable to that of a Trane BCVD090

a. New air handling unit blower will be direct drive with VFD not ECM motor.

b. Existing voltage is 460/60/3

c. Existing wire, conduit, and circuit breaker may be reused provided they are properly sized. If not they must be replaced. Provide all necessary control wires to condenser.

d. New unit must have new mixing box and dampers to accommodate minimum outside air flow

(adjustable) and ability to economize (adjustable) when conditions are existing.

e. Unit is to have outside isolation damps that close during unoccupied times.

f. Duct work installed where existing duct furnace was.

g. New 3 way hydronic valve installed off existing boiler loop to take floating signal from DDC controls to maintain discharge air temperature (adjustable).

h. Added boiler loop circulator pump to supply proper flow to new hydronic coil (controlled based on outside air temperature).

2. Existing air condensing unit to be removed and replaced with a dual scroll compressor/ dual circuit 7.5 ton unit, comparable to that of a Trane TTA09044DAB

a. New unit to have a voltage of 460/60/3

b. New unit will have belly band heaters on compressors

c. New unit will have head pressure controls

3. Remove and replace all refrigerant piping with properly sized and insulated piping

a. Outside insulation to be weather resistant.

c. Properly seal penetrations through building.

4. Rewire needed existing DDC points and add necessary points for proper operation of new 3 way hydronic valve and dual circuit condenser.

5. Provide condenser start-up sheet to include exact refrigerant charge.

3.7. Remove and replace at building 612 (Base exchange)

1. Air condensing unit to be removed and replaced with a dual scroll compressor/ dual circuit 12.5 ton unit, comparable to that of a Trane TTA15044DAB

a. New unit to have voltage of 460/60/3

b. Existing line voltage wire, conduit, and circuit breaker may be reused provided they are properly sized. If not they must be replaced. Provide all necessary control wiring to condenser.

c. New unit will have head pressure controls

d. New unit will have belly band heaters on compressors.

e. Replace heating coil

2. Remove and replace all refrigerant piping with properly sized and insulated piping

a. Outside insulation to be weather resistant.

c. Properly seal penetrations through building.

3. Flush heating system lines

a. Refill with 50% Glycol

4. Coil in the existing air handler unit needs to be removed and replaced with proper coil to match new condenser unit.

5. Rewire and reprogram additions to existing Direct Digital Controls (DDC) to include proper staging between circuits based on discharge air temperature.

6. Install two bollards in front of newly installed unit

7. Provide condenser start-up sheet to include exact refrigerant charge.

4. PERIOD OF PERFORMANCE:

Work must be completed in 60 days to support the duties of 174 ATKW personnel and safety of the mission.

5. MATERIALS & EQUIPMENT:

5.1. Construction materials must meet relevant code specifications and the New York State building code for northern construction.

5.2. SUBMITTALS: The contractor shall submit to the Contracting Officer (CO) for approval all items listed on attached Material Submittal Schedule (AF Form 66) within 10 calendar days of the notice to proceed (NTP). Alternatively, the contractor may, within 10 calendar days of the NTP, provide the CO with a schedule indicating when each material submittal shall be submitted for approval.

5.2.1. Use an AF Form 3000 for transmitting material submittals.

5.2.2. Ensure that any disapproved submittal will not impact the approved project execution schedule, as a disapproved submittal shall not be considered grounds for a time extension.

5.2.3. Allow for a minimum of 5 working days for the Government’s processing of submittals.

5.2.4. The contractor shall not order, deliver, nor install any materials and/or equipment without CO’s approval or remove any materials on site that have not been properly approved.

5.2.5. In addition to model and serial numbers, the contractor shall provide 1 hard copy of the operations & maintenance (O&M) manual for each installed equipment item unless otherwise specified. Final payment (up to 10% of awarded amount) will be withheld until O&M manuals are received by the

COR.

6. GENERAL CONDITIONS:

6.1. Contractor and all personnel shall comply with the Standard Industry of New York State Codes and the Unified Facilities Criteria. Contractor shall work within the time line specified by COR.

6.2. Contractor shall field verify all site conditions, quantities, measurements, and project requirements.

6.3. Contractor shall protect and barricade all work areas at all times to protect workers, base personnel, and the public from injury.

6.4. Contractor shall protect all structures, utilities, vegetation, sidewalks and vehicles from damage at all times. Replace all damaged materials with new materials to the satisfaction of the Government, at no additional cost to the Government.

6.5. SCHEDULE: The schedule is the basis for determining contract earnings during each update period and therefore the amount of each progress payment.

6.5.1. No later than 10 calendar days after the contract award, the contractor shall provide to the COR a Contract Progress Schedule (AF Form 3064 or other format agreed to by COR).

6.5.2. The contractor shall provide to the COR a Contract Progress Report (AF Form 3065 or other format agreed to by COR) every 2 weeks (or other time period agreed to by COR) after the NTP.

6.5.3. In the event that the CO directs schedule revisions and those revisions have not been included in subsequent Project Schedule revisions or updates, the CO may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.

6.6. Vendors must agree to complete the Contract Management Reporting Application at the end of each fiscal year.

The application may be accessed at: https://cmra.army.mil/Login.aspx.

The CMRA is an online database that automates the Army’s contract management and reporting process for contract management personnel by allowing users to enter their contract information, track contract data, and view reports based on contract data in the application. Its primary function is to support the Contractor Manpower Reporting (CMR) program that was approved on September 13, 2002 by the Business Initiatives Council (BIC) to improve the Army’s visibility of contractor services to planners and programmers. The CMR business process captures information of funding source, contracting vehicle, organization supported, mission and function performed, labor hours, and labor costs for contracted efforts. It enables the Army to:

• Fully understand the total Army workforce

• Provide better oversight of the workforce

• Ensure Army receives full value from contractor workforce

• Better account for total Army workforce

7. DIFFERING SITE CONDITIONS:

Bring any unforeseen project conditions to the attention of the CO immediately. Differing site conditions, which may alter the scope of work, shall be approved by the CO prior to such work being performed.

8. GOVERNMENT WORKING HOURS:

Work hours shall be Monday thru Friday 0700-1530 hours, with the exception of Federal holidays.

Contractor must have prior, written CO approval to work outside these hours.

9. UTILITIES:

9.1. The Government shall provide at no cost to the contractor reasonable amounts of water and electricity to support the contract. Hook up will be to existing outlets and will be the contractor’s responsibility.

9.2. Water outlets without a suitable backflow prevention device already installed must have one provided by the contractor prior to use. The backflow prevention device must be submitted to the CO for approval before installation or use. Section 5 submittal instructions apply to backflow prevention device approvals.

10. DISPOSAL OF MATERIALS AND CLEANUP:

10.1. Contractor shall clean up after each work period and dispose of all debris at the close of each day.

10.2. The contractor shall not use any government disposal bins, dumpsters or trash receptacles for any reason at any time unless otherwise specified in this SOW. The contractor shall provide appropriate disposal bins and/or trash receptacles. Approval of disposal bins/trash receptacles location(s) shall be coordinated through the COR.

10.3. The contractor shall not allow debris to leave the work area risking damage to aircraft engines and other government property.

10.4. All debris or trash shall be disposed of off base. All demolition debris shall be disposed of at a permitted landfill, with landfill authorization, unless other arrangements have been coordinated through the Environmental Management Office (EMO). Contractor shall coordinate with the base EMO prior to disposing any materials off base.

10.5. Provide documentation of all disposal and recycling of solid waste, such as landfill receipts; waste manifests, or weight tickets from the landfill that accepts the debris.

11. MATERIAL & EQUIPMENT ACCOUNTABILITY:

Notify the COR prior to delivery of any material or equipment to the site. The contractor shall ensure someone is available to receive delivered materials and able to store them safely in an area to be coordinated with the COR. Any materials delivered without prior coordination and without having someone to take receipt, shall not be accepted and turned away.

12. FIRE & SECURITY:

12.1. Security Forces shall monitor the incoming and outgoing of work personnel during the duration of the project. All deliveries shall be coordinated with the COR to arrange for their entrance onto the base.

12.2. The contractor’s foreman or project manager shall attend a security briefing prior to the start of work.

12.3. All contractor (and sub-contractor) personnel shall have a minimum of 1 form of government-issued photo identification with them at all times.

12.4. If welding, torching, or any other high-temperature activities are required to complete this project, a burn permit must be obtained first from the Base Fire Department.

13. ENVIRONMENTAL:

13.1. The contractor’s foreman or project manager shall receive an environmental management system briefing at or before the pre-construction meeting.

13.2. HAZARDOUS MATERIALS:

13.2.1. A hazardous material (HM) is any item that is:

13.2.1.1. a health hazard or physical hazard as defined in 29 CFR 1910.1200(c) or

13.2.1.2. regulated in its disposal by the Environmental Protection Agency in 40 CFR or

13.2.1.3. hazardous as defined by Department of Transportation regulation in 49 CFR or

13.2.1.4. hazardous as defined by the Dangerous Goods Regulations of the International Air

Transportation Association

13.2.2. If HM is required to complete this contract, the contractor must create a hazardous materials storage plan and account for HM quantities in accordance with the Hancock Field Hazardous Waste Management Plan. Submit the hazardous materials storage plan following instructions in Section 5.

14. ACRONYMS & ABBREVIATIONS

AF Air Force ANG Air National Guard API American Petroleum Institute ATKW Attack Wing CFR Code of Federal Regulations CO Contracting Officer COR Contracting Officer Representative DoD Department of Defense EMO Environmental Management Office E.W. Each Way HM Hazardous Material MCC Motor Control Center NFPA National Fire Protection Association NTP Notice to Proceed NYCRR New York Code of Rules and Regulations O&M Operations and Maintenance SF Square Feet SOW Statement of Work

SPCC Spill Prevention, Control and Countermeasures UFC Unified Facilities Criteria