SOW 733 FSS Fitness Equipment - FINAL.docx
DOCX document 26 KB Posted
- Attached to
- Ft Eustis Fitness Equipment Federal contract opportunity
- Solicitation number
- FA480023QA042
About this file
This document is a Statement of Work outlining fitness equipment and installation services required by the 733 Force Support Squadron at Joint Base Langley-Eustis in Virginia. The SOW requires providing LifeFitness brand or equal equipment including Synrgy 180 systems, treadmills, weight machines and free weights. Additional services include a 5-year replacement plan, replacing rusted equipment, installation including delivery and assembly, and a 1-year warranty on mechanical and labor items. The solicitation number FA480023QA042 from the Department of the Air Force Air Combat Command is also provided. Products and services are to be delivered to fitness centers at Anderson Field House and McClellan Fitness Center by December 2022.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo Solicitation - FA480023QA042 Ft Eustis Fitness Equipment.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work 733 FSS/FSV Fitness and Sports Fitness Center 5 Year Equipment Refresh / Rusted Equipment Replacement / New Equipment
OVERVIEW: The 733 Force Support Squadron, Joint Base Langley-Eusts, VA intends to procure new BRAND NAME OR EQUAL LifeFitness fitness equipment, replace rusted equipment, and obtain 5-year replacement plan per DAFI 34-114, in addition to install Services, including freight, inside delivery, unpacking, assembly, testing and debris removal of all products. Equipment will go to Anderson Field House and McClellan Fitness Center on Ft Eustis, as directed by the Fitness and Sports Team.
WARRANTY: Warranty information: The vendor shall provide 1 Year Mechanical, 1 Year Labor, 6 Months for Cosmetic Items, and 7 Years for Frame and Motor on all products. Warranty starts when product is installed.
TECHNICAL POC & DELIVERY ADDRESS:
Primary POC:
Brandon Halberg – Fitness Center Director / 757.878.2097 / brandon.halberg@us.af.mil Alternate POC:
Kevin Jones – Operations Manager / 757.878.6075 / kevin.jones.61@us.af.mil Delivery Address:
Anderson Field House 643 Dickman St.
Fort Eustis, VA 23604
1. DESCRIPTION OF SERVICE: Equipment quoted to include a 5 Year Replacement plan, replacement of rusted equipment, and new equipment that the facility is lacking per AFI 34-266. Life Fitness Install Services includes freight, inside delivery, unpacking, assembly, testing and debris removal of all products. Equipment will go to Anderson Field House and McClellan Fitness Center as directed by the Fitness and Sports Team.
2. MATERIALS:
VENDRO SHALL PROVIDE ALL MATERIALS DETAILED BELOW. ALL MATERIALS QUOTED ARE TO BE LIFEFITNESS BRAND “OR EQUAL.”
a. 1 EA – SYNRGY 180 CORE, suspension chin, stability ball storage, accessory shelf, dumbbell shelf accessory shelf, dual rail shelf “OR EQUAL”
b. 1 EA – SYNRGY 180 ADDITIONAL SECTIONS, suspension chin, battle rope anchor, accessory shelf, dumbbell shelf, accessory shelf “OR EQUAL”
c. 1 EA – SYNRGY 180 ADDITIONAL SECTIONS, suspension chin, stability ball storage, accessory shelf, dumbbell shelf, accessory shelf, dual rail shelf “OR EQUAL”
d. 1 EA – SYNRGY 180 SIDE, mat storage “OR EQUAL”
e. 4 EA – BOSU BALL STORAGE
f. 1 EA – SYNRGY 180 FREE STANDING SYSTEM “OR EQUAL”
g. 2 EA – SYNRGY ADDITIONAL SECTION FREE STANDING SYSTEM “OR EQUAL”
h. 1 EA – CABLE MOTION DUAL ADJUSTABLE PULLEY “OR EQUAL”
i. 10 EA – COLLAR, LOCK JAW PRO 2 “OR EQUAL”
j. 5 EA - ACFT SLED “OR EQUAL”
k. 5 EA – ACFT MED BALL “OR EQUAL”
l. 10 EA – YOGA MAT
m. 1 EA – HAMMER STRENGTH ISO-LATERAL ROWING “OR EQUAL”
n. 1 EA – HAMMER STRENGTH FRONT LAT PULLDOWN “OR EQUAL”
o. 1 EA – HAMMER STRENGTH FRONT PLATE LOADED SEATED CALF RAISE “OR EQUAL”
p. 3 EA – HAMMER STRENGTH ACFT HEX BAR “OR EQUAL”
q. 1 EA – HAMMER STRENGTH PLATE LOADED SEATED LEG CURL “OR EQUAL”
r. 1 EA – HAMMER STRENGTH PLATE LOADED V-SQUAT “OR EQUAL”
s. 2 EA – HD ATHLETIC 4FT STORAGE RACK “OR EQUAL”
i. 6 EA – 42IN ACCESSORY TRAY “OR EQUAL”
t. 1 EA – INSIGNIA SERIES HIP ABDUCTION/ADDUCTION “OR EQUAL”
u. 18 EA – INTEGRITY + TREADMILL “OR EQUAL”
3. DELIVERY SERVICES:
a. The contractor Project Manager shall be responsible for on-stie coordination of all staging and deliveries of their product, to include access to and operation of any equipment needed for unloading and movement of materials or product.
b. Contractor shall be responsible for the determination of the appropriate delivery method and handling, based on site conditions to include non-existence of loading docks and equipment at any given location. Special circumstances may be identified by and negotiated with the Contracting Officer.
c. Delivery shall be in accordance with the terms of the contractor’s agreement. If the ordering activity designates an accelerated delivery schedule it will be identified in the contract. A maximum of 30 days storage for new products shall be included in the contractor’s agreement. Work shall comply with applicable building standards and codes.
d. The contractor shall be responsible for following all safety and security guidelines within the area in which work is being performed, to include securing any contractor owned tools or equipment, and any on site storage being utilized.
e. The contractor shall prevent its personnel from entering any area other than the designated work area.
f. The contractor shall maintain a means of egress within all designated work areas to comply with fire codes.
g. The contractor shall ensures its personnel eat, drink, or smoke only in designated areas.
4. HAZARDOUS CONDITIONS. During performance of work under this contract, should the contractor find conditions existing that prevent the performance of task specified; the Contracting Officer shall be immediately notified.
5. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government will provide reasonable utilities and workspace for the contractor to perform the requested duties. There are no covered or secure storage areas available. The contractor will provide all equipment and storage media necessary to perform tasks.
a. TOILET FACILITIES: Use of existing toilet facilities in the immediate work area only will be permitted. Contractor personnel will ensure facility cleanliness is maintained at all times.
b. SECURITY POLICE, FIRE PROTECTION AND FORCE PROTECTION: Forms of force protection may be required by the Base. The Contractor shall coordinate any placement of storage sheds (if required) with AT/FP criteria. The Contractor shall refer to UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, for additional requirements.
c. The government will provide general on-base security police and fire protection service.
d. TELEPHONE: The government shall not provide telephone services. If available, contractor may use government phones in a case of emergencies or during field and site work. No long distance telephone calls will be authorized.
e. HOURS OF OPERATION. Working hours for the contractor will normally be between the hours of 8:00 AM and 5:00 PM excluding Saturdays, Sundays, and Federal holidays. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer five (5) calendar days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the Contracting Officer may authorize the contractor to perform work during periods other than normal duty hours/days.
f. OSHA REQUIREMENTS: All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, standards and handbooks, and with the Corps of Engineers (COE) Safety Manual 385-1-1, dated 03 Sep 96.
EXCEPTIONS: None.
6. INSTALLATION AND REMOVAL SERVICES
a. The contractor shall appoint an authorized representative who will be in the company’s senior representation on site for all customer communication and enforce compliance of all requirements for the project. This representative shall have a physical presence during any delivery and throughout assembly. Any deviation shall be agreed to by the authorized Government Representative or Contracting Officer.
b. Contractor shall be liable for any damage to government property caused by the contractor, their employees, subcontractors, or their representatives.
c. During delivery and assembly, the contractor shall protect all furniture and building materials, to include carpet, existing within the space with industry approved protective coverings inclusive of craft paper, moving blankets and such material. The contractor shall not use protective materials that will leave any type of residual print, outline or imaging on any furniture or building materials. Contractor shall not repair damage to finishes but will be responsible to pay for damages; the government will make repairs to furniture.
d. The contractor shall uncrate/unpack all items and perform required assembly in accordance with the manufacturer instructions.
e. Services shall include inspection of product for shipping damage. If damage is found it shall be the responsibility of the contractor to notify the authorized government representative and make all arrangements for replacement or repair of the item(s) damaged. Damaged items are not to be assembled unless otherwise directed by the authorized Government Representative.
f. All work sites should be returned to pre-contract cleanliness conditions. Services shall include removal of packing materials from the installation. All trash removed from the worksite shall be disposed of in accordance with state laws, and packaging and other recyclable materials shall be recycled wherever possible.
g. The contractor shall maintain environmental controls when working in any Air Force facility, to include but not limited to keeping doors shut and lights off when not in use an turning off vehicle engines when parked.
h. Prior to acceptance, the contractor shall clean all equipment with the manufacturer’s recommended cleaning agents/products.
i. The contractor shall provide all new components, completely assembled, and operational.
j. The contractor shall inspect to ensure the equipment is free of surface dirt and defects and ready for use.
7. INSPECTIONS/ACCEPTANCE CHECKLIST
a. A post‐assembly assessment shall be coordinated with the contractor’s authorized representative and Government authorized Representative to ensure all items have been assembled satisfactorily and contract performance is completed IAW this SOW (to include any modifications).
b. Upon completion of all contract requirements, the contractor will promptly submit the final invoice through WIDE AREA WORKFLOW to the government authorized representative.
8. SECURITY REQUIREMENTS.
a. LEVELS OF SECURITY. Fort Eustis security may be viewed as being one of three broad levels, the level in effect being dependent on the location or AREA of Fort Eustis in question.
i. The lowest level of security exists in “GENERAL ACCESS” areas. These areas are all of Fort Eustis outside of the "USAF Controlled" and "USAF Restricted" areas.
ii. “USAF Controlled” access areas are the mid-level security areas. Presence within the CONTROLLED ACCESS AREA is by authorization; however, the movement of authorized personnel in and out of these AREAS is generally not impeded.
iii. The highest level of security on Fort Eustis is that within the “USAF RESTRICTED AREAS”. These areas are subdivided to be known as Protection Level 1, 2 or 3 AREAS. Work schedule requests or changes to existing schedules for work to be performed in a “USAF RESTRICTED AREA” shall be submitted at least 7 calendar days in advance for approval and coordination of Fort Eustis Security Forces.
iv. Closed Base. Fort Eustis is considered a closed base. All personnel entering must have specific permission of the installation commander for entry. This permission is granted when a Contractor employee is issued an identification card. The Contracting Officer will provide information necessary to obtain identification cards. The contractor shall be responsible to ensure that all of its employees obtain, and keep on their person at all times while working on the base, a USAF identification card. Upon completion of the work or termination of an employee, the contractor shall be responsible for turn in of identification cards to the Contracting Officer or to the Pass and Registration Office of the Security Forces.
NOTE: Failure to turn in badges will result in WITHHOLDING OF FINAL PAYMENT and revocation of any future badges issued by Pass and Registration Office to the employee and the contractor.
9. IDENTIFICATION OF CONTRACTOR VEHICLES. Contractor vehicles must be marked on each side with company name with either permanent or semi-permanent/magnetic signage.