SOW 47266.docx

DOCX document 492 KB Posted

Attached to
47266 RENEW STBD ENGINE Federal contract opportunity
Solicitation number
70Z04024QSBPL007000
Issued by
Department of Homeland Security US Coast Guard

About this file

This document is a Statement of Work (SOW) for a U.S. Coast Guard contract to provide general labor, equipment, and facilities to haul out a 47 FT Motor Lifeboat (MLB) and complete a forward deck welding repair and renew/replace the starboard main diesel engine.

The key details include: the vessel specifications, the required work scope (forward deck welding repair, engine replacement), the performance period (commence work within 21 days, complete in 10 working days), and the point of contact for the Contracting Officer Representative. The related federal contract opportunity is a Request for Quote (RFQ) to award a Firm Fixed Price Purchase Order for the 47 FT MLB engine repair, with quotes due by 08/09/2024. The award will be made on a Lowest Priced Technically Acceptable basis.

View the file

Other files for this federal contract opportunity

Other files attached to 47266 RENEW STBD ENGINE, newest first.
File Type Posted
FAR CLAUSES.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

U.S. Coast Guard Station Depoe Bay 240 SE Coast Guard Dr Depoe Bay, OR. 97341

(541) 765-2124

1. SCOPE: Contractor shall provide general labor, equipment, and facilities to haul out US Coast Guard 47 FT Motor Lifeboat (MLB) 47266 to complete a forward deck welding repair and renew/replace STBD main diesel engine. See attachments for all applicable instructions, schedules, and plans.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the contractor shall commence work within 21 days and work diligently to complete the entire project and have vessel ready for use by 10 working days from scheduled haul out after contract award.

3. INFORMATION AND REQUIREMENTS:

Physical Characteristics of Vessel

1. Hull Length 47’ 11”

2. Length Overall 48’ 11” (w/ rub rails)

3. Hull Beam 14’ 0” Beam Overall 15’ 0”

4. Highest Points: Fixed 18’ 6”, Unfixed 28’ 4”

5. Hoisting condition 40,000 LBS (boat, full fuel, outfit; no crew or cargo)

Drydocking

1. Haul vessel

2. Securely block vessel.

3. Lauch vessel (Coast Guard representative shall ensure watertight integrity of vessel and test all propulsion machinery before launch).

4. Documentation provided as attachments:

· Docking Plan 47B-MLB_801_2_1

· Lifting Arrangement 47B-MLB_997_1

Forward Deck Welding Repair

1. Complete electrical isolation IAW T14000.0

2. Clad weld 5.5-inch crack in forward deck plating (3/16 5456-H116-AL ALY PL).

3. Conduct NDT on new welds IAW with industry standards

4. Reconnect electrical IAW T14000.0

5. Pictures provided in enclosure (1).

6. References provided as attachments:

· T14000.0

· Main Deck Drawing 47B-MLB_110_100

· 47 MLB Hot Work Diagram

· Gun Mount Drawing 47MLB 187-10

Complete Engine Swap of STBD Engine (IAW MPC: A15001.D)

1. Tow reel will be removed prior to arrival.

2. Coast Guard will disconnect all required electronics.

3. Contractor will remove and install all interferences.

4. Contractor will remove and replace STBD main diesel engine.

5. References provided as attachment:

· Procedure Card A15001.D

4. CONDITIONS AFFECTING THE WORK: If additional work items are found, contractor shall report findings immediately before work continues via CFR along with commercial estimate of necessary work to be completed outside the original SOW.

5. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s representative of intended start date. The work shall be done in accordance with the specification.

6. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

7. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer Representative (COR).

8. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.

9. CLEAN UP: All HAZWASTE, trash and debris shall be removed from the site and or recycled as applicable. The job site shall be left in a clean and neat manner.

10. UPON COMPLETION OF WORK: Contact the COR to arrange for inspection/acceptance of work.

11. POINTS OF CONTACT:

Contracting Officer Representative Richard Moroge, USCG, MK1 Phone: (774) 444-5553 Email: Richard.M.Moroge@USCG.MIL

12. Enclosure 1:

image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg

File details come from the government source that posted it. Updated .