This statement of work outlines requirements for the fabrication and delivery of a high integrity container to support government work. The contractor shall fabricate a polyethylene container with a maximum diameter of 77 inches, height of 80 inches, and wall thickness of 25/64 inches to have a minimum usable volume of 900 gallons. The container must meet specific design, material, and testing requirements including pressure testing, load testing of lifting components, and nondestructive testing. The contractor must deliver the fully-certified container along with required documentation to PSNS & IMF in Bremerton, Washington by May 31, 2024.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOB ORDER KO KO REV PAGE
36NF287710 S01 0 1 OF 14
4/26/2023
STATEMENT OF WORK
FOR
HIGH INTEGRITY CONTAINER
Prepared by
PUGET SOUND NAVAL SHIPYARD &
INTERMEDIATE MAINTENANCE FACILITY
PREPARED BY: CODE DATE
V. Johnson 2380.2 4/4/23
REVIEWED BY: CODE DATE
K. Osmanson 2380.2 4/13/23
APPROVED BY: CODE DATE
T. Larson 2380.2 4/26/23
CONCURRED BY: CODE DATE
S. Smith 2370.21 4/18/23
36NF287710 S01 0 2 OF 14
CONTENTS
Section/Paragraph
1 Scope
2 Background
3 References
4 Requirements
4.1 General Requirements
4.2 Fabrication Requirements
4.3 Certification and Testing Requirements
5 Notice
6 Delivery
7 Government-Furnished Property
8 Security Requirement
9 Place of Performance
10 Delivery Address
11 Period of Performance
36NF287710 S01 0 3 OF 14
1 Scope
1.1 The contractor shall fabricate and deliver one (1) High Integrity Container (HIC) fully compliant with this Statement of Work (SOW).
2 Background
2.1 The HIC is required for use inside a government-owned Allied Technology Group (ATG)
14-210H Type A cask for support of government work.
3 References
3.1 A-A-59326E: Commercial Item Description – Coupling Halves, Quick-Disconnect, Cam-Locking Type, General Specification For; Revision E
3.2 WN-I019-2: State of Washington Radioactive Materials License; Amendment 42
3.3 RR-W-410J: Federal Specification – Wire Rope and Strand; Revision J
3.4 RR-C-271H: Federal Specification – Chains and Attachments, Carbon and Alloy Steel;
Revision H
3.5 ANSI N14.6-1993: Radioactive Materials – Special Lifting Devices for Shipping
Containers Weighing 10,000 Pounds (4,500 kg) or More; 1993 Edition
3.6 ASTM E208-20: Standard Test Method for Conducting Drop-Weight Test to Determine
Nil-Ductility Transition Temperature of Ferritic Steels; 2020 Edition
3.7 ASTM A370-22: Standard Test Methods and Definitions for Mechanical Testing of Steel
Products; 2022 Edition
3.8 NAVSEA-T9074-AS-GIB-010/271: Requirements for Nondestructive Testing Methods;
2014 Edition
3.9 MIL-STD-2035A: Department of Defense Test Method – Nondestructive Testing
Acceptance Criteria; Revision A
3.10 ASME B30.9-2021: Slings Standards; 2021 Edition
3.11 ASTM A275/A275M-18: Standard Practice for Magnetic Particle Examination of Steel
Forgings; 2018 Edition
36NF287710 S01 0 4 OF 14
4 Requirements
4.1 General Requirements
4.1.1 The material required by this contract shall be manufactured and tested in accordance with this SOW.
4.1.2 The contractor shall fabricate the HIC as listed in this SOW to meet the performance criteria specified in references 3.1-3.5, 3.10 and in accordance with the detailed requirements in paragraph 4.2 below.
4.1.3 The contractor shall test and certify the HIC as listed in this SOW to meet the testing criteria specified in references 3.5-3.9, 3.11 and in accordance with the detailed requirements in paragraph 4.3 below.
4.2 Fabrication Requirements
4.2.1 HIC Dimensions. The HIC, with certified lifting arrangement, shall be used inside of a government owned ATG 14-210H Type A Cask. The HIC shall have a maximum outside diameter of 77", a maximum overall height of 80" (not including lifting arrangement), and have a minimum wall thickness of 25/64". The HIC shall have a minimum useable volume of 900 gallons. Useable volume shall be defined as the volume of the HIC reduced by the volume of the closure pan and spray foam in the top of the HIC (i.e., the maximum volume of water that can be added to the HIC following fabrication and assembly without overflowing).
4.2.2 HIC Marking. The HIC serial number and gross empty weight shall be stenciled on the closure lid and at a second location on the body of the polyethylene HIC (e.g.
side, upper body, etc.) using 1" high letters and highly contrasting color paint.
Ensure that serial numbers and gross empty weight are visible and can be read with the shielded shipping cask primary lid in place and the 29" diameter secondary lid removed on a government owned ATG 14-210H cask.
4.2.3 Closure Pan Assembly:
4.2.3.1 Closure Pan. 3” thick steel plate with a maximum diameter of 18-3/4” to accept paragraph 4.2.3.2 through 4.2.3.9 items. The closure pan shall be centered on the tank top and attached to the HIC.
4.2.3.2 Media Inlet Connection. 2” IPS pipe (schedule 40, 300 series stainless steel) butt welded to a 2” cam-type connector (male adapter) with a dust cap. The cam-type connectors shall adhere to the full requirements of reference 3.1 (Class SS, Style 1).
36NF287710 S01 0 5 OF 14
4.2.3.3 Vent Connection. 2” IPS pipe (schedule 40, 300 series stainless steel) with 2” cam-type connector (male adapter) with a dust cap. The cam-type connectors shall adhere to the full requirements of reference 3.1 (Type I, Class SS, Style 1).
A splash shield shall be installed inside of the HIC to protect the outlet port of this vent connection from liquid.
4.2.3.4 Camera Housing with Viewing Port. The camera housing shall have 1-1/2” sealed viewing port through the closure pan assembly. The camera housing shall be made out of 1-1/2” pipe (schedule 40, 300 series stainless steel) threaded to a 1-1/2” cam-type connector (male adapter) with a dust cap. The cam-type connectors shall adhere to the full requirements of reference 3.1 (Type
I, Class SS, Style 1). The camera housing shall be sized for a Mirion Tech
Dotcam (1.14” x 4.3” long).
4.2.3.5 Light Housing with Viewing Port. The light housing shall have a 1-1/2” sealed viewing port through the closure pan assembly. The light housing shall be made out of 1-1/2” pipe (schedule 40, 300 series stainless steel) threaded to a 1-1/2” cam-type connector (male adapter) with a dust cap. The cam-type connectors shall adhere to the full requirements of reference 3.1 (Type I, Class SS, Style 1).
The light housing shall be sized for use with a Mirion Tech LED Light (1.14” x
4.3” long).
4.2.3.6 Flushing Fixture. The camera and light shall have a flushing fixture to flush/clean the sealed camera viewing and light ports inside of the HIC. The flushing fixture shall have a flush hose that is 6 ft. (+ ½”) long. The final flush hose connection shall be a series 3RL female socket quick-disconnect fitting with ¼” port size (Hansen [Eaton Corporation], stainless steel construction) to connect to existing government equipment.
4.2.3.7 Dewatering Connection. 1-1/2” IPS pipe (schedule 40, 300 series stainless steel) with 1-1/2” cam-type connector (male adapter) with a dust cap. The cam-type connectors shall adhere to the full requirements of reference 3.1 (Type I, Class
SS, Style 1).
4.2.3.8 Tank Level Indication (TLI) Connection. There shall be a port through the closure pan, sized for the TLI instrument requested per paragraph 4.2.5.1.
4.2.3.9 Test Port. ¼” IPS pipe (schedule 40, 300 series stainless steel) with a 3RL series female socket quick-disconnect fitting with ¼” port size (Hansen [Eaton
Corporation] stainless steel construction) with a dust cap.
4.2.4 Internal Dewatering Assembly. The internal dewatering system shall be used to dewater the high integrity container to meet disposal requirements of reference 3.2 and shall be equipped with 5-micron panel filters. All internal cam-type connectors shall be secured with arm ring tie-wraps.
36NF287710 S01 0 6 OF 14
4.2.5 Indication:
4.2.5.1 Level Indication. The vendor shall install a Siemens Echomax XPS-10 transducer for continuous level sensing. Transducer cable shall be 10 meters long and have a 3 contact male plug (Switchcraft P/N: SL403MX). Vendor shall provide the following information for the Siemens Echomax XPS-10 transducer for input into the Siemens Multiranger:
Dimension X - Empty Distance
Dimension Y - Near Blanking Distance
Dimension C - flag 3 (also see 4.2.5.2)
Dimension D - flag 4 (also see 4.2.5.2)
Flag 4 volume in gallons (also see 4.2.5.2)
4.2.5.2 Visual Indication. The HIC shall have four (4) visual indicator flags mounted inside of the HIC. The visual indicators shall be mounted in such a way that a camera installed in the camera viewing port can readily indicate the volume inside of the HIC. The vendor shall locate the visual level indicator flags as follows:
Dimension A – flag 1 at 30% of HIC usable volume +/- 1.5%
Dimension B – flag 2 at 60% of HIC usable volume +/- 1.5%
Dimension C – flag 3 at 80% of HIC usable volume +/- 1.5%
Dimension D – flag 4 at 90% of HIC usable volume +/- 1.5%
4.2.6 Lifting Arrangement. The HIC lifting arrangement shall consist of a lifting liner bail, shackles, wire ropes, and a master link. The overall lifting arrangement height, including the HIC height, shall not exceed 152”. The integral liner bail shall be specifically sized to the HIC and designed for a four point lift. The weight of a full
HIC and liner bail shall be equally distributed between the two wire rope pendants.
The two wire rope pendants shall be in the upside down basket configuration and connected to the four liner bail padeyes using shackles. The two wire rope pendants shall be placed through a forged master link, at the apex of the basket configuration, to allow the two wire rope pendants to load equalize. A final top wire rope pendant shall be connected to the master link for lifting the liner bail assembly and installed
HIC. Both end eyes of the top wire rope shall be directly swaged to the master link.
See Figure 1 for example sketch of the above description.
36NF287710 S01 0 7 OF 14
Figure 1: Lifting Arrangement Example
Top wire rope pendant
Master link
Shackle (4 places, TYP)
Wire rope pendants (TYP)
Integral Lifting Attachment
(4 places, TYP)
Liner bail (TYP)
36NF287710 S01 0 8 OF 14
4.2.6.1 Wire Ropes. The wire ropes shall be free of all types of surface treatments such as paint, galvanization, or plating. The wire rope shall be thoroughly coated with a lubricant during process of manufacture. The vendor shall connect the lower wire rope pendants to the liner lifting bail padeyes via 5/8” shackles, Crosby G-
209 or equal. The wire ropes shall be a minimum diameter of 5/8”, Type I, Class 2, 6 by 19, bright Extra Improved Plow Steel (EIPS), Independent Wire
Rope Core (IWRC), and Construction 3 (Seale) or Construction 5 (Warrington-
Seale) per reference 3.3. The top wire rope pendant connected to the 1" master link shall be a minimum diameter of 7/8”, Type I, Class 2, 6 by 19, bright EIPS, IWRC, and Construction 3 or Construction 5 per reference 3.3. Both ends of the pendant shall be directly swaged to the 1” master link. The length of the top wire rope while attached to the master link, in the basket configuration, shall be
36” (+ ½”).
4.2.6.2 Master Link. 1” weldless master link, Crosby A-342 or equal, are to be forged and meet the material composition requirements for shackles per reference 3.4.
The master link shall be installed on the 5/8” wire rope to equalize loading. The
7/8” wire rope shall be permanently attached to the 1" master link through the swaged wire rope eyes.
4.2.6.3 Integral Lifting Attachments. The integral lifting attachments (lifting lugs or padeyes) shall meet the design and material requirements of reference 3.5. The padeye design strength shall be 3:1 yield and 5:1 ultimate. The anticipated minimum service temperature for lifting the HIC is 0° F.
4.2.6.3.1 Lifting Liner Bail. The lifting liner bail for lifting the HIC shall meet the requirements of reference 3.5.
4.2.6.4 Lifting Shackles. Each forged shackle, Crosby G-209 or equal, are to meet the technical requirements of reference 3.4 for shackle material composition.
Shackle pins must be easy to disassemble/reassemble without tools.
4.3 Certification and Testing Requirements
4.3.1 All pressure indicating devices and load indicating devices used for hydrostatic test, pneumatic test and/or load test shall be in current calibration.
4.3.2 Testing Procedures Expectations. Vendor shall provide drawings and procedures for inspection and testing of welded pads and lift slings for approval by the government, a minimum of one month prior to delivery of the HIC. The government shall provide comments within two weeks of receipt of procedures for inspection and testing procedures. The tests shall be conducted at the contractor's facilities or at an independent laboratory or commercial testing facility.
36NF287710 S01 0 9 OF 14
4.3.3 Pressure Test. The vendor shall hydrostatically/pneumatically test the HIC to
7 (+0, -1) psig. Vendor shall provide certification and results of the hydrostatic/pneumatic testing.
4.3.4 Hydrostatic Test of Internal Hoses. The vendor shall hydrostatically test all hoses used in the HIC assembly to a minimum pressure of 225 (+5, -0) psig, held for a minimum of 30 minutes with no leakage or deformation. Vendor shall supply certification and results of hydrostatic tests.
4.3.5 Lifting and Handling Tests and Inspections:
4.3.5.1 Breaking Strength. Vendor shall provide certification of the breaking strength of the wire ropes by obtaining breaking strength results from destructive testing of a sample from the originating wire rope reels.
4.3.5.2 Lifting Lug Drop Weight Test. Vendor shall perform drop weight test per reference 3.6 of material used for the lifting lugs (padeyes). The anticipated minimum service temperature for the HIC is 0° F, therefore the nil ductility transition temperature shall be a minimum of -40° F. Vendor shall supply certification and results of drop weight test.
A Charpy impact test per references 3.5 and 3.7 may be performed in place of a drop weight test. Minimum service temperature for the HIC is 0° F, ensure test temperature meets this requirement. See reference 3.5. Vendor shall supply certification and results of Charpy impact test.
4.3.5.3 Lifting Liner Bail Drop Weight Test. Vendor shall perform drop weight test per reference 3.6 of the material used for the lifting liner bail. The anticipated minimum service temperature for the HIC is 0° F, therefore the nil ductility transition temperature shall be a minimum of -40° F. Vendor shall supply certification and results of drop weight test.
A Charpy impact test per references 3.5 and 3.7 may be performed in place of a drop weight test. Minimum service temperature for the HIC is 0° F, ensure test temperature meets this requirement. See reference 3.5. Vendor shall supply certification and results of Charpy impact test.
4.3.5.4 Prior to Load Test. Vendor shall perform a visual inspection of the liner bail and all rigging gear. No signs of nicks, gouges, cracks, breaks, wear, distortion, corrosion, deterioration, binding, loose parts, thread damage, or other defects that may reduce the load-bearing capability are allowed. There is to be no arc strikes, discoloration (burn marks), or other evidence of heat damage that may reduce the load-bearing capability per reference 3.8. There is to be no deformation such as bending or twisting out of the natural plane of the gear. For the wire rope, no broken wires, wear, flattened sections, kinked, bird caged, dog legged crushed, high strands, corrosion, heat damage, inadequate end
36NF287710 S01 0 10 OF 14
attachments, or any other damage resulting in distortion of the rope structure are allowed. For the shackles and master link, inspect for manufacturer’s identification and safe working load markings. Vendor shall provide certification of satisfactory pre-load test visual inspection.
4.3.5.5 Wire Rope Load Test. Vendor shall perform load test per reference 3.10 of each of the wire ropes individually to twice their respective rated capacities/working load limits. The maximum expected service load for this application is considered to be 12,200 lbs. Load test shall be held for a minimum of 10 minutes. Vendor shall provide certification and results of load testing.
4.3.5.6 Rigging Assembly Load Test. Vendor shall perform load test of the entire rigging assembly (integral lifting attachments, wire ropes, shackles and master link) to 150% (+ 5%, -0 %) of the maximum expected service load. The maximum expected service load for this application is considered to be 12,200 lbs. Load test shall be held for a minimum of 10 minutes. Vendor shall provide certification and results of load testing.
4.3.5.7 After Load Test Completion. Vendor shall perform a visual inspection of the liner bail and all rigging gear. No signs of nicks, gouges, cracks, breaks, wear, distortion, corrosion, deterioration, binding, loose parts, thread damage, or other defects that may reduce the load-bearing capability are allowed. There is to be no arc strikes, discoloration (burn marks), or other evidence of heat damage that may reduce the load-bearing capability per reference 3.8. There is to be no deformation such as bending or twisting out of the natural plane of the gear. For the wire rope, no broken wires, wear, flattened sections, kinked, bird caged, dog legged crushed, high strands, corrosion, heat damage, inadequate end attachments, or any other damage resulting in distortion of the rope structure are allowed. For the shackles and master link, inspect for manufacturer’s identification and safe working load markings. Vendor shall provide certification of satisfactory post-load test visual inspection.
4.3.5.8 Lifting Shackles Magnetic Particle Inspection. After the load test is complete, vendor shall perform a magnetic particle inspection of the lifting shackles.
Magnetic particle inspection shall be performed in accordance with reference
3.8 with acceptance criteria to reference 3.9. Alternative inspection methods may be allowed provided they meet the following and has been submitted for review and approved for use by the government:
a. Magnetic particle inspections performed in accordance with reference 3.11 are acceptable provided that the following areas meet the requirements of reference 3.8:
(1) Inspection of welds, removal of arc strikes per paragraph 4.7 and tolerance on equipment ammeters per paragraph 4.3.1.7.1.
(2) Automated equipment per paragraph 4.3.3.2.2.
(3) Final surface inspection per paragraph 4.3.1.4.
36NF287710 S01 0 11 OF 14
Vendor shall provide certification and results of satisfactory magnetic particle inspection.
4.3.5.9 Integral Lifting Attachments Magnetic Particle Inspection. After the load test is complete, vendor shall perform a magnetic particle inspection of the integral lifting attachments (lifting lugs or padeyes), including the welds that attach the lifting lugs or padeyes and the heat effected zone. Magnetic particle inspection shall be performed in accordance with reference 3.8 with acceptance criteria to reference 3.9 (Class 3 for welds). Alternative inspection methods may be allowed provided they meet the following and has been submitted for review and approved for use by the government:
reference 3.8:
(1) Inspection of welds, removal of arc strikes per paragraph 4.7 and tolerance on equipment ammeters per paragraph 4.3.1.7.1.
4.3.5.10 Master Link Magnetic Particle Inspection. After the load test is complete, vendor shall perform a magnetic particle inspection of the master link. Magnetic particle inspection shall be performed in accordance with reference 3.8 with acceptance criteria to reference 3.9. Alternative inspection methods may be allowed provided they meet the following and has been submitted for review and approved for use by the government:
reference 3.8:
(1) Inspection of welds, removal of arc strikes per paragraph 4.7 and tolerance on equipment ammeters per paragraph 4.3.1.7.1.
4.3.5.11 Liner Bail Magnetic Particle Inspection. After the load test is complete, vendor shall perform a magnetic particle inspection of the liner bail welds and the heat effected zone. Magnetic particle inspection shall be performed in accordance with reference 3.8 with acceptance criteria to reference 3.9 (Class 3 for welds).
36NF287710 S01 0 12 OF 14
Alternative inspection methods may be allowed provided they meet the following and has been submitted for review and approved for use by the government:
reference 3.8:
(1) Inspection of welds, removal of arc strikes per paragraph 4.7 and tolerance on equipment ammeters per paragraph 4.3.1.7.1.
4.3.5.12 Rigging Assembly Labeling. Vendor shall tag rigging assembly components
(e.g. lift lugs or padeyes, wire ropes, etc.) with legible tags that state the working load limit, date of the test, test load and identification of tester.
4.3.5.13 Proper Installation. Vendor shall provide certification that the HIC lifting gear is properly fitted and securely installed.
4.3.6 Manufacturer’s Literature. Vendor shall provide up-to-date operating manuals, as-built engineering drawings, and user handling and dewatering procedures for the
HIC one month prior to delivery of the HIC.
4.3.7 Miscellaneous Requirements and Certifications.
4.3.7.1 Quotation. Vendor shall provide, as a minimum, with quotation the following to
Puget Sound Naval Shipyard for evaluation and review:
4.3.7.1.1 Complete fabrication specifications.
4.3.7.1.2 Preliminary engineering drawings including details of the lifting arrangement, closure pan and filter assembly.
4.3.7.1.3 Testing/inspection procedures.
4.3.7.1.4 Washington State Department of Health (DOH) approval of the HIC handling procedure and any revisions.
4.3.7.1.5 Washington State DOH approval of the HIC drawing and any revisions.
4.3.7.1.6 HIC Certificate of Compliance (COC) recognized by the Washington
State DOH.
36NF287710 S01 0 13 OF 14
4.3.7.1.7 HIC licensing by the Washington State DOH for disposal at the US
Ecology site.
4.3.7.2 Delivery. At the time of the delivery of the HIC, the vendor shall provide all certification data requested herein and the following additional certifications and information:
4.3.7.2.1 Certification and photographs that a visual inspection of the HIC internals reveals that the component parts are intact and the hardware inside the
HIC is adequately secured.
4.3.7.2.2 Certification and photographs that a visual inspection of the HIC externals reveals no obvious flaws or defects.
4.3.7.2.3 Certification of the total usable volume (in gallons) of the HIC.
4.3.7.2.4 Certification of the fully assembled empty HIC weight.
4.3.7.2.5 Certification of the height (in inches) of each of the visual indicator flags from the bottom of the HIC.
4.3.7.2.6 Certification of the height (in inches) of the HIC from the bottom to the face of the Siemens Echomax XPS-10 transducer.
4.3.7.2.7 Certification of the height (in inches) of the distance from the face of the
Siemens Echomax XPS-10 transducer to where material surface can be reliably measured (Near Blanking Distance).
4.3.7.2.8 Certification that the closure pan is centered on the tank top and attached to the HIC by a certified method.
4.3.8 Certificate of Compliance. Vendor shall provide a COC to confirm all design, performance, drawings, inspections and test certifications required by this contract have been met.
4.3.9 Vendor shall provide two complete sets of certification data. One set shall accompany the HIC and one set shall be emailed to victoria.l.johnson7.civ@us.navy.mil
5 Notice
5.1 The government reserves the right to witness, at any time, the fabrication and testing of the HIC.
mailto:victoria.l.johnson7.civ@us.navy.mil
36NF287710 S01 0 14 OF 14
6 Delivery
6.1 CDRLs A-001 through A-012 are included.
7 Government-Furnished Property – None
8 Security Requirement
8.1 UNCLASSIFIED
9 Place of Performance
9.1 Vendor’s Facility
10 Delivery Address
10.1 PSNS & IMF 1400 Farragut Ave, Bremerton, WA 98314
11 Period of Performance
11.1 HIC shall be fabricated, tested, and delivered no later than May 31, 2024.