SOW 32268300.pdf

PDF 202 KB Posted

Attached to
LOCK CYLINDER Federal contract opportunity
Solicitation number
SPMYM223Q2079
Issued by
Defense Logistics Agency Land and Maritime

About this file

This document is a scope of work for the purchase and shipment of two lock cylinder assemblies for the Defense Logistics Agency Land and Maritime. The contractor will build and deliver the lock assemblies according to provided specifications while meeting certification and testing requirements. This includes verifying welds through non-destructive testing, completing a satisfactory hydrostatic test, and submitting the required test results and certificate of compliance. Most materials will be government furnished according to the lists provided. The assemblies must be delivered to Puget Sound Naval Shipyard and meet the warranty and security requirements outlined in the document.

View the file

Other files for this federal contract opportunity

Other files attached to LOCK CYLINDER, newest first.
File Type Posted
23Q2079 LOCK CYLINDER (MOD).pdf PDF
23Q2079 LOCK CYLINDER.pdf PDF
CDRLs.pdf PDF
23Q2079 LOCK CYLINDER.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JML:

SCOPE OF WORK

For

PURCHASE AND SHIPMENT

Consisting of:

TWO (2) EA LOCK ASSY., B434-2650 A1

at

CONTRACTED VENDOR’S FACILITY AND SHIPPED VIA VENDOR PREFERRED SHIPPING COMPANY

References:

1. B434-2650 (596-7410825)

2. S9074-AR-GIB-010/278 (A)

3. MIL-STD-22D

4. TVD ERMG00012

5. TVD ERMG00178

1. GENERAL:

1.1 The contractor shall provide all management, tools, supplies, equipment, labor to perform engineering and manufacturing services to deliver the above mentioned equipment within the confines of specifications as defined in this Statement of Work except those items specified as Government furnished property and services.

2. SCOPE OF WORK:

2.1 Contractor will build QTY. 2 EA Lock Assy. (A1) in accordance with Ref. (1), Ref (2), and Ref (3) while providing verification of weld quality and satisfactory hydrostatic test completion record. Required material listing in Ref. (1) [as corrected by Ref (4) and Ref (5)], sufficient for the construction of 2EA A1 Lock Assemblies will be provided by PSNS. Ref (4) and Ref (5) are provided to correct starting material requirements for fabrication of A1 Lock Assembly. The following Ref (1) parts will not be included and are not required to be part of the delivered assembly: Flange assemblies (Ref 1, Pc 28 & Pc 29) and Nut, Special Hex (Ref 1, Pc 42).

3. DELIVERABLES:

3.1 Deliverable No. 1: Certificate of Compliance of weld NDT results

a. Verification of all welds via Non-Destructive Testing (NDT) per reference (2), Table IX for Piping and Table X for Class A pressure vessels.

b. Contract Data Requirement List (CDRL) DI-MISC-81356A Certificate of Compliance

3.2 Deliverable No. 2: Hydrostatic Test Results

a. At time of delivery, Contractor shall submit to the Government satisfactory hydrostatic test result per

Enclosure (1).

b. Contract Data Requirement List (CDRL) DI-QCIC-82089 Hydrostatic Testing

3.3 Deliverable No. 3: QTY 2 A1 Lock Assemblies

a. Contractor shall deliver QTY 2 EA, A1 Lock Assemblies, manufactured per Ref (1), Ref (2), Ref (3), Ref (4) and Ref (5), to the shipping address provided in para 10.

4. WARRANTY.

The warranty period for equipment manufactured and supplied by the company will be within a twelve-month period from delivery date of the equipment to the original purchaser by the company or by an authorized representative.

5. CONTRACTOR FURNISHED MATERIAL.

The Contractor is to furnish all material and labor as well as any HAZMAT and tooling necessary to complete the Lock assemblies described above, unless material is listed in para. 8 Government Furnished Materials.

6. CERTIFICATE OF COMPLIANCE.

PSNS&IMF –or- Contractor is responsible for quality assurance.

6.1 The following Certification records shall be supplied to PSNS & IMF for approval and certification review. Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite. Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertification.FCM@navy.mil. Certificate of Compliance shall verify the following:

a. NDT requirements have been met for all weld joints on the components. NDT shall be performed per requirements in Reference (2) Table X for Class A-2 complete penetration welds and Table IX for a P-1 Piping Class as applicable.

b. Verification that components have been manufactured within tolerances as specified in References (1), (2),

(3) and (5). Note: Only the fabrication notes in Reference (5) shall be adhered to.

7. HYDROSTATIC PRESSURE TESTING:

Each Lock Assembly shall be Hydrostatically pressure tested as outlined in Enclosure (1). A record of production testing parameters with test results shall be recorded. A copy of the Hydraulic test results for each Lock Assembly shall be supplied to the customer.

7.1 Test the cylinder for strength, porosity and tightness of seals with the cylinder completely assembled.

Apply pressurized MIL-PRF-17672, Symbol 2075-T-H hydraulic oil to each port one at a time with the remaining ports open. For each test maintain the pressure for 10 minutes and inspect the cylinder the cylinder and open ports for leakage. No internal or external leakage, in accordance with Reference (1). No permanent deformation allowed. See enclosure 1 for testing procedure and datasheet.

8. GOVERNMENT FURNISHED MATERIALS.

See Enclosure (2)

9. SECURITY REQUIREMENTS.

All references and deliverable items associated with this task are unclassified for release to DOD and DOD contractors only. There are no other known requirements for access to restricted areas or information connected with the performance of this task.

10. SHIPPING ADDRESS. Shipping address of acquisition materials for direct delivery to DOD installation shall be to the following location:

Puget Sound Naval Shipyard

Receiving Officer, Building 514 1400 Farragut Ave Bldg. 514

Bremerton WA 98314 mailto:PSNS.WAWFQACertification.FCM@navy.mil

11. TECHNICAL POINT of CONTACT.

Primary: Ben Rogge C/120x.T1 360-627-5104 benjamin.l.rogge.civ@us.navy.mil

Secondary: Matthew Wojonoski C/120X.1 360-627-4207 matthew.l.wojnoski.civ@us.navy.mil

12. GOVERNMENT SURVEILLANCE OFFICER.

Any items concerning contractual requirements or funding must be addressed to the Contracting Officer as well as the Surveillance Officer.

Primary: Wayne M. Booher, C/127.2 360-627-5249 Wayne.m.Booher.civ@us.navy.mil mailto:benjamin.l.rogge.civ@us.navy.mil mailto:matthew.l.wojnoski.civ@us.navy.mil mailto:Wayne.m.Booher.civ@us.navy.mil

Enclosure (1) Page 1 of 2

Enclosure 1

B434-2650 A1 CYLINDER HYDROSTATIC TEST PROCEDURE

Test Requirements: Test the cylinder for strength, porosity and tightness of seals with the cylinder completely assembled. Apply pressurized MIL-PRF-17672, Symbol 2075-T-H hydraulic oil to each port one at a time with the remaining ports open to atmosphere as shown in below table. For each test maintain the pressure for a minimum of 10 minutes (plus duration of inspection) and inspect the cylinder and open ports for signs of internal leakage.

Pressurized Port Open Ports (atmosphere) Test Pressure Minimum Duration C1 C2 & LO 4500 +50/0 PSI 10 minutes C2 C1 & LO 4500 +50/0 PSI 10 minutes LO C1 & C2 4500 +50/0 PSI 10 minutes

Acceptance Criteria: No internal or external leakage is allowed. No permanent deformation allowed.

Enclosure (1) Page 2 of 2

B434-2650 A1 Cylinder # 1 Hydrostatic Strength Test Data Sheet

Unit Serial Number:

Cylinder Port

Required Pressure

Start Pressure

End Pressure

Required Hold Time

Start Time

Stop Time

Total Hold Time

Allowable Leakage

Actual Leakage

C1 4500

+50/0 PSI

10 minutes None

C2 4500

+50/0 PSI

10 minutes None

LO 4500

+50/0 PSI

10 minutes None

Post Test Inspection Notes:

Post Test Assembly Inspection (no permanent deformation allowed): SAT / UNSAT Initials

Date

Leakage Test Results (no internal or external leakage allowed): SAT / UNSAT Initials Date

Printed Name:

Signature: Date:

B434-2650 A1 Cylinder # 2 Hydrostatic Strength Test Data Sheet Unit Serial Number:

Cylinder Port

Required Pressure

Start Pressure

End Pressure

Required Hold Time

Start Time

Stop Time

Total Hold Time

Allowable Leakage

Actual Leakage

C1 4500

+50/0 PSI

10 minutes None

C2 4500

+50/0 PSI

10 minutes None

LO 4500

+50/0 PSI

10 minutes None

Post Test Inspection Notes:

Post Test Assembly Inspection (no permanent deformation allowed): SAT / UNSAT Initials

Date

Leakage Test Results (no internal or external leakage allowed): SAT / UNSAT Initials Date

Printed Name:

Signature: Date:

Enclosure (2) Page 1 of 3

Enclosure 2 Government Furnished Material (GFM)

1. Supplied Raw GFM for manufacture

PART NAME/DESCRIPTION For manufacture of Ref (1), Pc #

Quantity/Size (minimum supplied) NIIN

NICU Plate 5.50" QQ-N-281 CL A Form 6 Cond-HF (AR) 1 32” x 24”

NICU, Plate QQ-N-281 CL-A FM 6 AR, 1.50" thick 2 24” x 24”

Sheet, Cold Rolled QQ-N-281 CL-A FM 4 ANL, .125" thick

(modified per Ref 5) 3 120” x 42”

Rod, Round ASTM-B150 UNSC63200 5 6” DIA x 10” 00-095-5677L1

Rod, QQ-N-286,Round 1.5" DIA FM 2, COND-ANL, AH FIN-B 7 1.5” DIA x 100” 00-512-2366L1

Rod, QQ-N-286 Round 1.5" DIA Form- 2, COND-ANL, AH FIN-B 8 1.5” DIA x 30” 00-512-2366L1

Plate, QQ-N-286, Plate 2" thick Form- 6, COND-HR, ANL, FIN-A 9 24” x 24” N/A

Plate, 1" thick Delrin 100AF COND- Annealed 10 12” x 12” N/A

Plate, QQ-N-281 CL-A FM 6(Plate) As Rolled, .187" thick 12 4” x 8” 00-234-2177

Plate, 1" THICK DELRIN 100AF COND- ANNEALED 16 12” x 12” N/A

Plate, QQ-N-286 3.500" thick Form-6 COND-HR, ANL AH FIN-A 17 12” x 24” N/A

Plate, 3.00" thick QQ-N-281, CL-A, Form-6 AR 27 24” x 24” N/A

Tube, NICU, .840D x .187NOM, MIL-T- 1369 CL-A (Seamless, Cold Drawn, Annealed) 32, 33, 34, 35, 36 96” N/A

Enclosure (2) Page 2 of 3

2. Supplied GFM ready for Installation

PART NAME/DESCRIPTION Ref (1). PC# Minimum QTY supplied NIIN

Screw, Cap SLFLKG Hex HD .375-16UNC- 2Ax.750 1222 TY 1, 18240, 286 4 14 01-443-8483

Bushing, Guide Plastic Rod Delrin AF DE588 6 8 01-561-1875

Screw, Cap SLFLKG SCH FLH 82, FF-S-86 TY 4, 18240, MS18116 .375-16UNRC-3Ax1.250" 11 16 01-563-5763

Nut, Jam Hex NICU .375"-16UNC-2B 1222 TY 2 STY A or B 13 8 00-272-5698

Screw, Cap SLFLKG SCH CYL, 286, 1222 TY 2, 18240 .500"-13UNC-3A1.250 14 12 01-486-3892

Setscrew Half Dog PT Hex SOC SLFLKG ANSI- B18.3 for dim, FF-S-200, 286 .375"-16UNC-

3A.625 15 8 01-456-2079

Piston, Rod B150 Temp-TQ50, FM Rod, UNSC63200 18 2 01-560-9200

Nut, SLFLKG Hex NICU, .750"-10UNC-3B, MS17828-12C 19 12 00-006-2250

Retainer, Packing MS27595-327 20 13 01-347-9861

Packing, Preformed, 4327-514VN 21 3 01-560-5570

Retainer, Packing MS27595-216 22 9 01-066-3936

Packing, Preformed, 4327-514VN 23 5 01-560-5570

Packing, Preformed, M83248/1-327 24 5 01-005-3213

Enclosure (2) Page 3 of 3

PART NAME/DESCRIPTION Ref (1). PC# Minimum QTY supplied NIIN

O-ring, M83248/1-211 25 3 01-549-1833

Retainer, Packing MS27595-211 26 5 00-395-2873

Tee, .500NPS SW, 281ANSI-B16.11 30 2

Elbow .500NPS 90 SW ANSI-B16.11 31 4

Wiper Ring SHD-1125, 1.125IDx1.500ODx.305 thick 37 3 01-560-5597

Fitting Lub, 90 degree elbow 38 2 00-172-0047

Screw, SHLDR SCH .750-10UNC-3A, 1.00DIA x 3.00L 286, MIL-S-21472, (MS18116, 1222 supersedes MS18116) 40 2

Nut, SLFLKG Hex NICU, .750"-10UNC-3B, MS17828-12C 41 2 00-006-2250

Washer, Lock, Tab .375 nut size 43 4 01-339-6526

3. DELIVERABLES:
3.1 Deliverable No. 1: Certificate of Compliance of weld NDT results
a. Verification of all welds via Non-Destructive Testing (NDT) per reference (2), Table IX for Piping and Table X for Class A pressure vessels.
3.2 Deliverable No. 2: Hydrostatic Test Results
3.3 Deliverable No. 3: QTY 2 A1 Lock Assemblies
4. WARRANTY.
5. CONTRACTOR FURNISHED MATERIAL.
6. CERTIFICATE OF COMPLIANCE.
PSNS&IMF –or- Contractor is responsible for quality assurance.
7. HYDROSTATIC PRESSURE TESTING:
11. TECHNICAL POINT of CONTACT.
12. GOVERNMENT SURVEILLANCE OFFICER.
Enclosure 1
Enclosure 2
2. Supplied GFM ready for Installation

File details come from the government source that posted it. Updated .