Sources Soughts Attachment_1.docx

DOCX document 14 KB Posted

Attached to
BRUNEAU FIRE STATION PHASE 2 Federal contract opportunity
Solicitation number
140L0621R0009
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document outlines requirements for a federal contract opportunity for construction of a new fire station in Bruneau, Idaho. The Bureau of Land Management seeks to award a contract to complete Phase 2 of the project, including construction of the remaining facility and all necessary site utilities and features. Work must incorporate applicable building codes and NFPA standards. The contractor will be fully responsible for underground utility infrastructure installed in Phase 1 and must complete all connections. With an estimated budget of $2.5-3 million, the contract is classified under NAICS code 236220 with a small business size standard of $39.5 million. At least 15% of the work must be performed by the small business prime or similarly situated small business subcontractors.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT: BRUNEAU FIRE STATION PHASE

Solicitation #: 140L0621R0009 The Bureau of Land Management (BLM) has a requirement for Bruneau Fire Station Phase 2 and will include the construction and utility connections supporting the new Fire Station and related site improvement elements for Phase 2. The contract will include the construction of a new facility that includes a Fire Station and all site utilities and features needed to support associated facility activities. All work is to incorporate the latest, applicable building codes, NFPA standards and sustainable design measures. Complete construction of the new building, including structure and foundation, layout and installation of systems and equipment, electrical and grounding, water system, plumbing and waste piping, septic system tie-in, HVAC, and other required site elements. Contractor must complete connections to underground utility infrastructure installed in Phase 1. The Phase 2 contract will require full responsibility of these underground utilities and perform all work to make this infrastructure functional including wire and cable, fittings and modifications for existing utility runs and connections. Phase 2 performance period will begin while Phase 1 is underway, resulting in both phases undergoing construction at the same time.

The estimated magnitude of construction is $2.5 - $3 million.

This Sources Sought is intended as a means of conducting market research, which will help determine the best method for the anticipated solicitation and subsequent award. The applicable North American Industry Classification System (NAICS) code assigned to this requirement is 236220, Commercial and Institutional Building Construction. The small business size standard is $39.5 million. FAR 52.219-4, Limitations on Subcontracting, will apply wherein at least 15 percent of the work must be performed by the small business prime contractor and similarly situated small business subcontractors.

THERE IS NO SOLICITATION AT THIS TIME. Submission of any information in response to this market survey is purely voluntary. The Government assumes no financial responsibility for any costs incurred in your firm’s response to this sources sought.